HomeMy WebLinkAbout16344-74 Jaffna Place SurveySURVEYOR'S CERTIFICATEDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationJames R. Hill, Inc.
PHONE: 952.890.6044 www.jrhinc.com
PLANNERS / ENGINEERS / SURVEYORS
CERTIFICATE OF SURVEY
FOR
D.R. HORTON - MINNESOTADRAWN BYDATEREVISIONSTAMCAD FILEPRO-ECT NO.SHEET 1 OF 1Lots 27, 28, 29, 30, 31 and, 32, Block 1,
CRYSTAL PARK, Dakota County, MinnesotaI hereby certify that this survey, plan or report wasprepared by me or under my direct supervision andthat I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this surveydoes not purport to show all improvements,easements or encroachments, to the propertyexcept as shown thereon.Signed this 15th day of April, 2022Marcus F. Hampton, MN L.S. No. 474814/15/2022420447-52.dwg420447-522999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306Lots 27, 28, 29, 30, 31 and, 32, Block 1, CRYSTAL PARK,Dakota County, MinnesotaPROPERTY DESCRIPTION16344, 16350, 16356, 16362, 16368 and, 16374,Jaffna Place, Lakeville, MinnesotaPROPERTY ADDRESS1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontaland vertical placement of structure only. Seearchitectural plans for building and foundationdimensions.3.No specific soils investigation has beencompleted on this lot by James R. Hill, Inc. thesuitability of soils to support the specific houseproposed is not the responsibility of James R.Hill, Inc. or the surveyor.4.No specific title search for existence ornon-existence of recorded or un-recordedeasements has been conducted by the surveyoras a part of this survey. Only easements per therecorded plat are shown.5.Proposed grades shown were taken from thegrading &/or development plan prepared byJames R. Hill, Inc.6.Grading plan date/revision date: 9/14/2021.7.Plan No. 2620-L, 2625-M, 2625-N, 2625-M,2625-Q, 2620-PNOTESFLOOR ELEVATIONSBENCHMARKProposedGarage Floor @ Front= 991.0Garage Top of Block= 991.4House Top of Block= 991.4Lowest Floor= 991.4Top nut of hydrant located at Lot 26, Block 1 = 993.22A. 5/16/22: Serv. coordinatesThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________05/18/2022lritchiePlanning DepartmentApprovedDate:__________________05/20/2022kjenson