Loading...
HomeMy WebLinkAboutLA202153 - 16344 Jaffna Place-Permit Pack wSWPPPRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: Passive (No Fan) Active (With fan and monitoring device ) Location (or future location) of Fan: Other Please Describe Here Not applicable, all ducts located in conditioned space Not required per mech. code Passive Powered Interlocked with exhaust device. Describe: Input in BTUS: Capacity in Gallons:Other, describe: AFUE or HSPF% Cfm's " round duct OR " metal duct Not required per mech. code Passive Low: Other, describe: Low: Location of fan(s), describe: Cfm's " round duct OR " metal duct Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. New Construction Energy Code Compliance Certificate Name of Residential Contractor MN License Number City Mailing Address of the Dwelling or Dwelling Unit Rigid, Extruded PolystyreneHeat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: Combustion Air Select a Type Location of duct or system: Rim Joist (2nd Floor+) Building envelope air tightness: Below Entire Slab Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area THERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Total R-Value of all Types of InsulationType: Check All That Apply Mineral FiberboardInsulation Location Foam, Closed Cell Describe other insulated areas Ceiling, flat Non or Not ApplicableFiberglass, BlownFiberglass, Batts Foundation Wall Output in Tons: Appliances Cooling System Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Make-up Air Select a Type Domestic Water Heater Model Heating System Rim Joist (1st Floor) Average U-Factor (excludes skylights and one door ) U: Duct system air tightness: Rating or Size Efficiency Heating Gain Cooling Load Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Residential Load Calculation SEER /EER Capacity continuous ventilation rate in cfms: Heating Loss Manufacturer Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Date Cert. Posted R-value MECHANICAL SYSTEMS Builders Associaton of Minnesota version 101014 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Load Short Form 11/17/2021Date:Entire House Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Information InfiltrationClgHtg Blower doorMethod88-15Outside db (°F) 4 (substantial) / 2Shielding / stories7570Inside db (°F) 50 Pa / 813 cfmPressure / AVF1385Design TD (°F) M-Daily range 5050Inside humidity (%) 3555Moisture difference (gr/lb) HEATING EQUIPMENT COOLING EQUIPMENT Make Bryant Make Bryant Trade Bryant Legacy Line 95 Gas Furn... Trade BRYANT HEATING AND COOLING SYS... Model 915SB30040E14 Cond BA13NA024BNG0G AHRI ref 0 Coil CNPVP2414ALA+915SB30040E14 AHRI ref 203498291 Efficiency 96 AFUE Efficiency 10.5 EER, 13 SEER Heating input Btuh40000 Sensible cooling Btuh15680 Heating output Btuh39000 Latent cooling Btuh6720 Temperature rise °F49 Total cooling Btuh22400 Actual air flow cfm753 Actual air flow cfm753 Air flow factor cfm/Btuh0.025 Air flow factor cfm/Btuh0.047 Static pressure in H2O0 Static pressure in H2O0 Space thermostat Load sensible heat ratio 0.82 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft²)(Btuh)(Btuh)(cfm)(cfm) 1/2 BATH 32 417 37 10 2 OWNERS SUITE 202 2037 2221 51 105 LAUNDRY 53 90 484 2 23 BATH 2 86 1719 356 43 17 BED 2 150 2130 1094 53 52 OWNERS BATH 132 2547 790 63 37 OWNERS WIC 48 753 115 19 5 BED 3 139 2598 1137 65 54 KITCHEN 174 1396 3251 35 153 GREAT ROOM 285 2292 629 57 30 MUD ROOM 40 1319 283 33 13 FOYER 135 5747 1112 143 52 MECH 55 746 119 19 6 OFFICE 60 765 916 19 43 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 2 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE UPPER HALL 224 571 213 14 10 DINING ROOM 120 5183 3205 129 151 Entire House 1935 30311 15961 753 753 Other equip loads 7519 246 Equip. @ 0.93 RSM 15073 Latent cooling 3483 TOTALS 1935 37831 18556 753 753 Bold/italic values have been manually overridden 2021-Nov-17 06:53:03Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Building Analysis 11/17/2021Date:Entire House Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor:2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude:Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F)4 (substantial) / 2Shielding / stories73-Wet bulb (°F)50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Heating Walls Glazing DoorsCeilings Floors Infiltration Ventilation Humidification % of loadBtuhBtuh/ft²Component 23.287645.5Walls 18.0681426.3Glazing 5.3202351.0Doors 5.219541.7Ceilings 8.230882.72.7Floors 20.376684.1Infiltration 00Ducts00Piping15.65909Humidification4.31610Ventilation0Adjustments100.037831Total Cooling Walls Glazing DoorsCeilings OtherInfiltration Internal Gains % of loadBtuhBtuh/ft²Component 8.513710.9Walls 44.8726728.1Glazing 3.658314.7Doors 6.811031.0Ceilings 0.61020.1Floors 3.15020.3Infiltration 00Ducts1.5246Ventilation31.15033Internal gains 00Blower0Adjustments100.016207Total Latent Cooling Load = 3483 BtuhOverall U-value = 0.064 Btuh/ft²-°F Data entries checked. 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:Entire House Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 2960.8618915.5220.00.065342ne 6240.8639895.5220.00.065722se 2870.8618355.5220.00.065332sw 1640.8610485.5220.00.065190nw 13710.8687645.5220.00.0651586all Partitions (none) WindowsWINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 136122.7158126.400.31060ne 141229.4126526.400.31048se 202929.4181826.400.31069sw 120029.4107526.300.31041sw 92522.7107526.300.31041nw 692726.8681426.400.310259all Doors Metal Door: Door, mtl fbrgl type 58314.7202351.06.30.60040ne Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 11030.9619541.7050.00.0201149 Floors20P-30t: Flr floor, frm flr, 12" thkns, r-30 cav ins, gar ovr 30.00.035363 1020.2810802.97 22B-10tpl: Bg floor, light dry soil, on grade depth, r-10 edge ins 200817.910.00.210113 00 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 2 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:1/2 BATH Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 310.861995.5220.00.06536ne Partitions(none) Windows (none) Doors(none) Ceilings(none) Floors22B-10tpl: Bg floor, light dry soil, on grade depth, r-10 edge ins 7117.910.00.2104 00 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 3 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:OWNERS SUITE Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 410.862615.5220.00.06547sw Partitions(none) Windows WINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 120029.4107526.300.31041sw Doors(none) Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 1940.963441.7050.00.020202 Floors (none) 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 4 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:LAUNDRY Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls (none) Partitions(none) Windows(none) Doors (none) Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 510.96901.7050.00.02053 Floors(none) 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 5 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:BATH 2 Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 360.862325.5220.00.06542ne 920.865865.5220.00.065106se 1280.868185.5220.00.065148all Partitions(none) Windows WINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 11829.410526.400.3104se Doors(none) Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 830.961461.7050.00.02086 Floors 20P-30t: Flr floor, frm flr, 12" thkns, r-30 cav ins, gar ovr 30.00.03511 30.28312.97 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 6 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:BED 2 Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 470.862985.5220.00.06554ne Partitions(none) Windows WINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 68022.779126.400.31030ne Doors(none) Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 1440.962541.7050.00.020150 Floors 20P-30t: Flr floor, frm flr, 12" thkns, r-30 cav ins, gar ovr 30.00.035150 420.284452.97 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 7 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:OWNERS BATH Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 280.861775.5220.00.06532se 930.865975.5220.00.065108sw 550.863545.5220.00.06564nw 1760.8611275.5220.00.065204all Partitions(none) Windows WINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 35329.431626.400.31012sw Doors(none) Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 1270.962251.7050.00.020132 Floors (none) 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 8 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:OWNERS WIC Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 610.863875.5220.00.06570se Partitions(none) Windows (none) Doors(none) Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 460.96821.7050.00.02048 Floors (none) 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 9 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:BED 3 Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 450.862875.5220.00.06552ne 480.863095.5220.00.06556se 930.865975.5220.00.065108all Partitions(none) Windows WINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 68022.779126.400.31030ne Doors(none) Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 1330.962361.7050.00.020139 Floors 20P-30t: Flr floor, frm flr, 12" thkns, r-30 cav ins, gar ovr 30.00.035139 390.284132.97 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 10 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:KITCHEN Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 750.864815.5220.00.06587sw Partitions(none) Windows WINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 35329.431626.400.31012sw Doors(none) Ceilings(none) Floors 22B-10tpl: Bg floor, light dry soil, on grade depth, r-10 edge ins 19617.910.00.21011 00 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 11 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:GREAT ROOM Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 1350.868625.5220.00.065156se Partitions(none) Windows WINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 44129.439526.400.31015se Doors(none) Ceilings(none) Floors 22B-10tpl: Bg floor, light dry soil, on grade depth, r-10 edge ins 33917.910.00.21019 00 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 12 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:MUD ROOM Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 160.861055.5220.00.06519ne Partitions(none) Windows (none) DoorsMetal Door: Door, mtl fbrgl type 28314.798351.06.30.60019ne Ceilings(none) Floors22B-10tpl: Bg floor, light dry soil, on grade depth, r-10 edge ins 7617.910.00.2104 00 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 13 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:FOYER Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 1200.867705.5220.00.065139ne 1040.866635.5220.00.065120se 820.865225.5320.00.06595nw 3060.8619555.5320.00.065354all Partitions(none) Windows WINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 44129.439526.400.31015se DoorsMetal Door: Door, mtl fbrgl type 30014.7104051.06.30.60020ne Ceilings(none) Floors 22B-10tpl: Bg floor, light dry soil, on grade depth, r-10 edge ins 77217.910.00.21043 00 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 14 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:MECH Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 590.863765.5220.00.06568se Partitions(none) Windows (none) Doors(none) Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 530.96941.7050.00.02055 Floors (none) 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 15 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:OFFICE Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 430.862765.5220.00.06550se Partitions(none) Windows WINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 17629.415826.400.3106se Doors(none) Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 580.961021.7050.00.02060 Floors (none) 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 16 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:UPPER HALL Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls (none) Partitions(none) Windows(none) Doors (none) Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 2150.963801.7050.00.020224 Floors20P-30t: Flr floor, frm flr, 12" thkns, r-30 cav ins, gar ovr 30.00.03564 180.281912.97 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 17 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Component Constructions 11/17/2021Date:DINING ROOM Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor:7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation:5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) Blower doorMethod)M(20-Daily range (°F) 4 (substantial) / 2Shielding / stories73-Wet bulb (°F) 50 Pa / 813 cfmPressure / AVF7.515.0Wind speed (mph) Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² Walls R-20 AG: Frm wall, vnl ext, 3/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 24" o.c. stud 550.863545.5220.00.06564se 780.864975.5220.00.06590sw 270.861725.5220.00.06531nw 1600.8610235.5320.00.065185all Partitions(none) Windows WINDOW 3131: 2 glazing, clr outr, air gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht 23529.421126.400.3108se 132329.4118626.400.31045sw 92522.7107526.300.31041nw 248426.5247226.300.31094all Doors(none) Ceilings (none) Floors22B-10tpl: Bg floor, light dry soil, on grade depth, r-10 edge ins 55317.910.00.21031 00 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2021-Nov-17 06:53:03Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Project Summary 11/17/2021Date:Entire House Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor:2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Notes: Design Information Minneapolis, Crystal AP, MN, USWeather: Winter Design Conditions Summer Design Conditions Outside db °F-15 Outside db °F88Inside db °F70 Inside db °F75Design TD °F85 Design TD °F13Daily range MRelative humidity %50Moisture difference gr/lb35 Heating Summary Sensible Cooling Equipment Load Sizing Structure Btuh30311 Structure Btuh15961Ducts Btuh0 Ducts Btuh0Central vent (SER=64% 49 cfm) Btuh1610 Central vent (SER=64% 49 cfm) 246 BtuhHeat recovery Heat recoveryHumidification Btuh5909 Blower Btuh0Piping Btuh0Equipment load Btuh37831 Use manufacturer's data nRate/swing multiplier 0.93InfiltrationEquipment sensible load Btuh15073 Method Latent Cooling Equipment Load SizingBlower doorShielding / stories 4 (substantial) / 250 Pa / 813 cfmPressure / AVF Structure Btuh2330Ducts Btuh0Central vent (49 cfm) Btuh1154CoolingHeatingHeat recovery19351935Area (ft²) Equipment latent load Btuh34831626916269Volume (ft³)Air changes/hour 0.130.31 Equipment Total Load (Sen+Lat)Btuh18556Equiv. AVF (cfm) 3685 Req. total capacity at 0.70 SHR ton1.8 Heating Equipment Summary Cooling Equipment Summary Make Bryant Make BryantTrade Bryant Legacy Line 95 Gas Furn... Trade BRYANT HEATING AND COOLING SYS...Model 915SB30040E14 Cond BA13NA024BNG0GAHRI ref 0 Coil CNPVP2414ALA+915SB30040E14AHRI ref 203498291Efficiency 96 AFUE Efficiency 10.5 EER, 13 SEERHeating input Btuh40000 Sensible cooling Btuh15680Heating output Btuh39000 Latent cooling Btuh6720Temperature rise °F49 Total cooling Btuh22400Actual air flow cfm753 Actual air flow cfm753Air flow factor cfm/Btuh0.025 Air flow factor cfm/Btuh0.047Static pressure in H2O0 Static pressure in H2O0Space thermostat Load sensible heat ratio 0.82 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2021-Nov-17 06:53:03 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Loads for Multiple Orientations 11/17/2021Date:Entire House Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Design Conditions Location: CoolingHeatingIndoor: 7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US 1385Design TD (°F)ft869Elevation: 5050Relative humidity (%)°N45Latitude: Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating Infiltration:88-15Dry bulb (°F) )M(20-Daily range (°F) 73-Wet bulb (°F) 7.515.0Wind speed (mph) Front Door North Northeast East Southeast South Southwest West Northwest Sensible Load (Btuh) 13473 15073 14994 14524 13074 14400 14658 14711 Latent Load (Btuh) 3483 3483 3483 3483 3483 3483 3483 3483 Total Load (Btuh) 16956 18556 18477 18008 16558 17883 18141 18195 Heating AVF (cfm) 753 753 753 753 753 753 753 753 Cooling AVF (cfm) 753 753 753 753 753 753 753 753 Building Orientation Cooling Load Total Cooling Load (Btuh)Direction Front Door faces 0 5000 10000 15000 20000 N NE E SE S SW W NW Front Door faces NortheastCurrent Orientation: Front Door faces NortheastHighest Cooling Load: 2021-Nov-17 06:53:05 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Manual S Compliance Report 11/17/2021Date:Entire House Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN Cooling Equipment Design Conditions °F75.3Entering coil DB:Btuh16207Sensible gain:°F88.0Outdoor design DB: °F63.0Entering coil WB:Btuh3483Latent gain:°F73.0Outdoor design WB: Btuh19691Total gain:°F75.0Indoor design DB: cfm753Estimated airflow:%50Indoor RH: Manufacturer's Performance Data at Actual Design Conditions Split ACEquipment type: BA13NA024BNG0G+CNPVP2414ALA+915SB30040E14Model:BryantManufacturer: cfm753Actual airflow: % of load107Btuh17358Sensible capacity: % of load125Btuh4346Latent capacity: %80SHR:% of load110Btuh21704Total capacity: Heating Equipment Design Conditions °F68.0Entering coil DB:Btuh37831Heat loss:°F-15Outdoor design DB: °F70.0Indoor design DB: Manufacturer's Performance Data at Actual Design Conditions Gas furnaceEquipment type: 915SB30040E14Model:BryantManufacturer: cfm753Actual airflow: °F49Temp. rise:% of load103Btuh39000Output capacity: Meets all requirements of ACCA Manual S. 2021-Nov-17 06:53:05 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Parts Order 11/17/2021Date: Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 BILL TO: SHIP TO: Attn: Attn: Phone: Phone: Fax: Fax: Notes: Ship viaDate requiredPurchase order #Ordered byOrder date ExtensionDiscUnit listTotalQtyDescriptionPart #Src pricepieces Rheia Duct System Equipment RHEA 000775.07753-in Duct Uninsulated10-00-190 RHEA 00080.080.03-in ferrule10-01-010 RHEA 00033.033.0Duct board Take Off Inside10-01-040 RHEA 00033.033.0Duct board Take Off Outside10-01-050 RHEA 00015.015.0Ceiling Boot Assembly10-01-220 RHEA 00015.015.0Ceiling Diffuser Assembly10-04-230 RHEA 00048.048.0Hanger Bar Assembly00-00-240 RHEA 00015.015.0Elbow Extension10-01-020 RHEA 00018.018.0High Sidewall Boot Assembly10-01-200 RHEA 00018.018.0Slotted Diffuser10-04-090 RHEA 0007.07.0Coupler10-01-030 0Subtotal, Rheia Duct System Equipment Duct System Equipment WSF 4.3004.301.01.0Round metal duct, D = 13"DDMt13 PGM 20.80020.801.01.0Plenum round take off, size 13"FPLG-13 WSF 84.6004.7018.018.0Round metal duct, D = 15"DDMt15 PGM 29.40029.401.01.0Round smooth elbow, size 15"FDELS-15 PGM 39.40039.401.01.0Return boot from round duct, size 15"FBTO-15 PGM 23.20023.201.01.0Plenum round take off with trans, size 15"FPLJ-15 WSF 0001.01.0Rectangular metal floor two way grill, 12"x12"FRGRMFT-1212 201.70Subtotal, Duct System Equipment 201.70Overall total 2021-Nov-17 06:53:05 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 2 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2021-Nov-17 06:53:05 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Parts Pull Order 11/17/2021Date: Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 BILL TO: SHIP TO: Attn: Attn: Phone: Phone: Fax: Fax: Notes: Ship viaDate requiredPurchase order #Ordered byOrder date QtyQtyTotalQtyDescriptionPart #Src returnedissuedpieces Rheia Duct System Equipment RHEA 7757753-in Duct Uninsulated10-00-190 RHEA 80.0803-in ferrule10-01-010 RHEA 33.033Duct board Take Off Inside10-01-040 RHEA 33.033Duct board Take Off Outside10-01-050 RHEA 15.015Ceiling Boot Assembly10-01-220 RHEA 15.015Ceiling Diffuser Assembly10-04-230 RHEA 48.048Hanger Bar Assembly00-00-240 RHEA 15.015Elbow Extension10-01-020 RHEA 18.018High Sidewall Boot Assembly10-01-200 RHEA 18.018Slotted Diffuser10-04-090 RHEA 7.07.0Coupler10-01-030 Duct System Equipment WSF 1.01.0Round metal duct, D = 13"DDMt13 PGM 1.01.0Plenum round take off, size 13"FPLG-13 WSF 18.018Round metal duct, D = 15"DDMt15 PGM 1.01.0Round smooth elbow, size 15"FDELS-15 PGM 1.01.0Return boot from round duct, size 15"FBTO-15 PGM 1.01.0Plenum round take off with trans, size 15"FPLJ-15 WSF 1.01.0Rectangular metal floor two way grill, 12"x12"FRGRMFT-1212 2021-Nov-17 06:53:05 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE 2620 Ext (Ely) - CRYSTAL ...Job:Duct System Summary 11/17/2021Date:Entire House Energy Diagnostics, Inc.By: Energy Diagnostics, Inc. 405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Project Information DR Horton MNFor: 2620 Ext (Ely) - CRYSTAL PARK, Minneapolis, MN System Totals 0.240Coil pressure loss (in H2O)AverageDesign mode 0.149Supply duct pressure loss (in H2O) 0.185Return system pressure loss (in H2O)753Total design airflow (cfm) 0.574Total system pressure loss (in H2O)753Total actual airflow (cfm) Room Details AVF DiffAct AVFDsn AVFHtg AVFClg AVFHtg LoadClg LoadRoom Name (%)(cfm)(cfm)(cfm)(cfm)(Btuh)(Btuh) 67106102417371/2 BATH -376785110520372221OWNERS SUITE 7131322390484LAUNDRY 5313043171719356BATH 2 125952535221301094BED 2 3525063372547790OWNERS BATH 131412195753115OWNERS WIC 05959655425981137BED 3 16109943515313963251KITCHEN 1444357302292629GREAT ROOM 8252333131319283MUD ROOM -1286981435257471112FOYER 171412196746119MECH -1925311943765916OFFICE 312121410571213UPPER HALL -1112414012915151833205DINING ROOM 2021-Nov-17 06:53:05 Right-Suite® Universal 2021 21.0.08 RSU29636 Page 2 ...RHEIA\DR HORTON\DR Horton MN\2620 EXT (ELY).rup Calc = MJ8 Front Door faces: NE Supply Run Details LengthDamp PosVelocityDiamAct AVFDsn AVFReturnTrunkRun Name (ft)(fpm)(in)(cfm)(cfm) 3151903106rb1dmn11/2 BATH-A 22424731315rb1dmn1BATH 2 22334131815rb1dmn1BATH 2-A 48234331817rb1dmn1BED 2 45137732017rb1dmn1BED 2-A 43138432017rb1dmn1BED 2-B 46137432020rb1dmn1BED 3 44138032020rb1dmn1BED 3-A 49136331920rb1dmn1BED 3-B 7161333335rb1dmn1DINING ROOM 12161033235rb1dmn1DINING ROOM-A 12156233035rb1dmn1DINING ROOM-C 17154932935rb1dmn1DINING ROOM-D 25147632533rb1dmn1FOYER-B 20152132833rb1dmn1FOYER-C 15162533333rb1dmn1FOYER-D 11340532122rb1dmn1GREAT ROOM 5341832222rb1dmn1GREAT ROOM-C 13249332624rb1dmn1KITCHEN-C 18153032824rb1dmn1KITCHEN-E 18154232924rb1dmn1KITCHEN-G 24149032624rb1dmn1KITCHEN-H 20425231313rb1dmn1LAUNDRY-A 9426731412rb1dmn1MECH 29146732523rb1dmn1MUD ROOM-A 21147732531rb1dmn1OFFICE-A 13244732425rb1dmn1OWNERS BATH 18152432825rb1dmn1OWNERS BATH-A 21147232526rb1dmn1OWNERS SUITE-A 18148732626rb1dmn1OWNERS SUITE-B 22146632526rb1dmn1OWNERS SUITE-C 18425731412rb1dmn1OWNERS WIC-A 41423531212rb1dmn1UPPER HALL Supply Trunk Details TrunkLengthDuctH x WDiamVelocClgHtgName (ft)Material(in)(in)(fpm)(cfm)(cfm) st10ShtMetl24x1212376753753dmn1 1ShtMetl0x013817753753st1 Return Branch Details TrunkDuctStud/JoistH x WDiamVelocTELClgHtgGrilleName MatlOpening (in)(in)(in)(fpm)(in)(cfm)(cfm)Size (in) ShMt0x015614887537530x0rb1 Job #: 2620 Ext (Ely) - CRYSTAL PARK Performed by Energy Diagnostics, Inc. for: DR Horton MN2620 Ext (Ely) - CRYSTAL PARK Minneapolis, MN Energy Diagnostics, Inc. 405 E Archer WayValparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Scale: 1 : 92 Page 1 Right-Suite® Universal 2021 21.0.08 RSU296362021-Nov-17 06:53:13 ...\DR Horton MN\2620 EXT (ELY).rup N MAIN KITCHEN DINING ROOM 1/2 BATHMAIN RIGHT UNIT GREAT ROOM MUD ROOM FOYER DINING ROOM-C 30 cfm3.1 " Ceiling Round DINING ROOM33 cfm3.1 " Ceiling Round DINING ROOM-D 29 cfm3.1 " Ceiling Round DINING ROOM-A 32 cfm3.1 " Ceiling Round KITCHEN-C 26 cfm3.1 " Ceiling Round KITCHEN-E 28 cfm3.1 " Ceiling Round KITCHEN-H26 cfm 3.1 " Ceiling Round KITCHEN-G29 cfm 3.1 " Ceiling Round 1/2 BATH-A10 cfm 3.1 " Ceiling Round MUD ROOM-A 25 cfm3.1 " Ceiling RoundFOYER-B 25 cfm3.1 " Ceiling Round FOYER-C28 cfm 3.1 " Ceiling Round FOYER-D33 cfm 3.1 " Ceiling Round GREAT ROOM21 cfm 3.1 " Ceiling Round GREAT ROOM-C 22 cfm3.1 " Ceiling Round rb1 753 cfm12 " Insulated Duct ORAir barrier/insulation for Bed 2/3 Job #: 2620 Ext (Ely) - CRYSTAL PARK Performed by Energy Diagnostics, Inc. for: DR Horton MN2620 Ext (Ely) - CRYSTAL PARK Minneapolis, MN Energy Diagnostics, Inc. 405 E Archer WayValparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035 Scale: 1 : 92 Page 2 Right-Suite® Universal 2021 21.0.08 RSU296362021-Nov-17 06:53:13 ...\DR Horton MN\2620 EXT (ELY).rup N UPPER OWNERS SUITE LAUNDRY BATH 2 BED 3 BED 2 OWNERS BATH OWNERS WIC UPPPER RIGHT UNIT MECH OFFICE UPPER HALL 20'-9" OWNERS WIC-A 14 cfm3.1 " Sidewall Slot OWNERS BATH-A28 cfm 3.1 " Sidewall Slot OWNERS BATH24 cfm 3.1 " Sidewall Slot MECH14 cfm 3.1 " Sidewall Slot OWNERS SUITE-B 26 cfm3.1 " Sidewall Slot LAUNDRY-A13 cfm 3.1 " Sidewall Slot OWNERS SUITE-A25 cfm 3.1 " Sidewall Slot OWNERS SUITE-C 25 cfm3.1 " Sidewall Slot UPPER HALL 12 cfm 3.1 " Sidewall Slot OFFICE-A25 cfm 3.1 " Sidewall Slot BATH 2 13 cfm3.1 " Sidewall Slot BED 2-B 20 cfm3.1 " Sidewall Slot BED 3-A 20 cfm3.1 " Sidewall Slot BED 2-A 20 cfm 3.1 " Sidewall SlotBED 320 cfm 3.1 " Sidewall Slot BED 2 18 cfm 3.1 " Sidewall SlotBED 3-B19 cfm 3.1 " Sidewall Slot BATH 2-A18 cfm 3.1 " Sidewall Slot Downflow furnace NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500