HomeMy WebLinkAbout8105 198th St SurveyZoning = RS-3
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________05/19/2022 lritchie