Loading...
HomeMy WebLinkAbout8105 198th St SurveyZoning = RS-3 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________05/19/2022 lritchie