Loading...
HomeMy WebLinkAboutLA202537 - Approved Linda Lentz ENG CAD-min 76 North Meadowbrook Drive Scott E. Wyssling, PE Alpine, UT 84004 Jon P. Ward, SE, PE office (201) 874-3483 Gregory T. Elvestad, PE swyssling@wysslingconsulting.com May 20, 2022 Everlight Solar Construction PO Box 930550 Verona, WI 53593 Re: Engineering Services Lentz Residence 16920 Firestone Path, Farmington, MN 8.625 kW System To Whom It May Concern: We have received information regarding solar panel installation on the roof of the above referenced structure. Our evaluation of the structure is to verify the existing capacity of the roof system and its ability to support the additional loads imposed by the proposed solar system. A. Site Assessment Information 1. Site visit documentation identifying attic information including size and spacing of framing for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information will be utilized for approval and construction of the proposed system. B. Description of Structure: Roof Framing: Prefabricated wood trusses at 24” on center. All truss members are constructed of 2x4 dimensional lumber. Roof Material: Composite Asphalt Shingles Roof Slope: 33 degrees Attic Access: Accessible Foundation: Permanent C. Loading Criteria Used • Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 PSF • Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 psf • Live Load = 20 psf (reducible) – 0 psf at locations of solar panels • Ground Snow Load = 50 psf • Wind Load based on ASCE 7-16 o Ultimate Wind Speed = 115 mph (based on Risk Category II) o Exposure Category C Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance with the Minnesota Residential Code (2018 IRC), including provisions allowing existing structures to not require strengthening if the new loads do not exceed existing design loads by 105% for gravity elements and 110% for seismic elements. This analysis indicates that the existing framing will support the additional panel loading without damage, if installed correctly. Page 2 of 2 D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent QuickBolt installation manual. If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. The maximum allowable withdrawal force for a 5/16” lag screw is 235 lbs per inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications. Based on a minimum penetration depth of 2½”, the allowable capacity per connection is greater than the design withdrawal force (demand). Considering the variable factors for the existing roof framing and installation tolerances, the connection using one 5/16” diameter lag screw with a minimum of 2½” embedment will be adequate and will include a sufficient factor of safety. 3. Considering the wind speed, roof slopes, size and spacing of framing members, and condition of the roof, the panel supports shall be placed no greater than 48” on center. 4. Panel supports connections shall be staggered to distribute load to adjacent framing members. Based on the above evaluation, this office certifies that with the racking and mounting specified, the existing roof system will adequately support the additional loading imposed by the solar system. This evaluation is in conformance with the Minnesota Residential Code (2018 IRC), current industry standards, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Very truly yours, Scott E. Wyssling, PE Minnesota License No. 57927 Signed 5/20/2022 Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 COVER PAGE - PV01 DRAWN BY: SoloCAD 1.INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM SHALL BE IN ACCORDANCE WITH NEC ARTICLE 690, AND ALL OTHER APPLICABLE NEC CODES WHERE NOTED OR EXISTING. 2.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110. 3. ALL WIRES, INCLUDING THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE IN ACCORDANCE WITH NEC ARTICLE 250 4. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE; THIS SYSTEM IS UTILITY INTERACTIVE PER UL 1741 AND DOES NOT INCLUDE STORAGE BATTERIES OR OTHER ALTERNATIVE STORAGE SOURCES. 5. ALL DC WIRES SHALL BE SIZED ACCORDING TO [NEC 690.8] 6.DC CONDUCTORS SHALL BE WITHIN PROTECTED RACEWAYS IN ACCORDANCE WITH [NEC 690.31] 7. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODE. PHOTOVOLTAIC (PV) SYSTEM SPECIFICATIONS AERIAL VIEW: OCCUPANCY: R-3 ZONING: RESIDENTIAL STREET VIEW: GENERAL NOTES APPLICABLE GOVERNING CODES SITE SPECIFICATIONS 2020 NEC 2020 MRC 2020 MFC 2020 MBC EQUIPMENT: AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) RACKING: Quickbolt 2 (QB2) - 48" O.C. PV01 COVER PAGE PV02 SITE PLAN PV03 ROOF ATTACHMENTS PV04 MOUNTING DETAIL PV05 LINE DIAGRAM PV06 ELECTRICAL CALCS PV07 LABELS PV08 PLACARD PV09 SITE PHOTOS SHEET INDEX:Signed 5/20/2022 AC MSP M PV C JB JB Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER SITE PLAN - PV02 DRAWN BY: SoloCAD ARRAY DETAILS: MOUNTING PLANE:AZIMUTH:TILT: MP1 195° 33° MP2 105° 33° EQUIPMENT LEGEND: INVERTERVISIBLE, LOCKABLE, LABELED AC DISCONNECT METER SOCKET (FOR UTILITY PV METER) UTILITY METER MAIN SERVICE PANEL LC LOAD CENTER FIRE ACCESS PATHWAY (3' TYP) C INV PV AC MSP M COMBINER BOX PROPERTY LINE BATT BATTERY(IES) SUB SUB PANEL MP1 MP2 FRONT OF HOME16920 Firestone Path201'-0" 88'-1" 184'-8" Signed 5/20/2022 AC MSP M PV C JB JB EQUIPMENT INFORMATION:ROOF INFO: PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: RAIL MANUFACTURER:IronRidge ROOF TYPE:Asphalt Shingle PV MODULE COUNT: 25 RAIL PART NUMBER:XR-10 ROOF FRAMING:Manufactured Truss ARRAY AREA:MODULE COUNT * 19.83 ft² = 495.75 ATTACHMENTS Quickbolt 2 (QB2)RAFTER/TOP CHORD SIZE:2x4 ROOF AREA:2560.5 ft² ATTACHMENT QTY:54 RAFTER/TOP CHORD SPACING:24"PERCENT OF ROOF COVERED: 19% SPLICE QTY:6 ATTACHMENT SPACING: 48'' ARRAY WEIGHT:MODULE COUNT * 45 lbs = 1125 lbs MIDCLAMP QTY:36 POINT LOAD:ARRAY LBS/ATTACHMENTS = 20.83 ENDCLAMP QTY:28 DISTRIBUTED LOAD: (lbs/ft²) (ARRAY) WEIGHT/AREA = 2.27 lbs/ft² Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 ROOF ATTACHMENTS - PV03 DRAWN BY: SoloCAD 18" TYP 18" TYP 36" FIRE ACCESS PATHWAY 3' TYP Signed 5/20/2022 RAIL L-FOOT/ATTACHMENT BRACKET (E) ROOF FRAMING QUICKBOLT 2 (QB2) FLASHING PV MODULE (E) COMP SHINGLE ROOF (1 LAYER) RAIL END CLAMP PV MODULE MID CLAMP PV MODULE 4" 2 1 2" MIN. DEPTH RAIL RAIL QUICKBOLT 2 (QB2) 2'-8" MIN - 3'-10" MAX 3 RAIL PV MODULE 48" MAX.1'-8" MAX. 21 FRONT VIEW 10" MIN - 1'-4" MAX 2'-8" MIN - 3'-10" MAX 10" MIN - 1'-4" MAX SIDE VIEW (E) RAFTER/TOP CHORDS (E) RAFTER/TOP CHORD DETAIL, MOUNTING AND FLASHING END CLAMP DETAILS MID CLAMP DETAILS 3 21 EQUIPMENT INFORMATION:ROOF INFO: PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: RAIL MANUFACTURER:IronRidge ROOF TYPE:Asphalt Shingle PV MODULE COUNT: 25 RAIL PART NUMBER:XR-10 ROOF FRAMING:Manufactured Truss ARRAY AREA:MODULE COUNT * 19.83 ft² = 495.75 ATTACHMENTS Quickbolt 2 (QB2)RAFTER/TOP CHORD SIZE:2x4 ROOF AREA:2560.5 ft² ATTACHMENT QTY:54 RAFTER/TOP CHORD SPACING:24"PERCENT OF ROOF COVERED: 19% SPLICE QTY:6 ATTACHMENT SPACING: 48'' ARRAY WEIGHT:MODULE COUNT * 45 lbs = 1125 lbs MIDCLAMP QTY:36 POINT LOAD:ARRAY LBS/ATTACHMENTS = 20.83 ENDCLAMP QTY:28 DISTRIBUTED LOAD: (lbs/ft²) (ARRAY) WEIGHT/AREA = 2.27 lbs/ft² Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 MOUNTING DETAIL - PV04 DRAWN BY: SoloCAD Signed 5/20/2022 J-BOX STRING (1): 15.96 A AC, 14 MODULES STRING (2): 13.68 A AC, 11 MODULES N G 3 AC COMBINER BOX SOLAR LOADS ONLYUL 1741 COMPLIANT AC DC AC DC6 INVERTERS AC DC AC DC7 INVERTERS J-BOX (N) 100A (2) 20A-2P J-BOX1 2 1 2 4 (E) LOADS N G (E)GROUNDING ELECTRODE SUPPLY SIDE CONNECTION: NEC 230.46, NEC 230.79, NEC 705.12(A). K4977-INT MILBANK LUG KIT TO BE ADDED (E) 150A-2P (E) 150A MAIN SERVICE PANEL (E) (E)UTILITY METER 120/240 VAC TO UTILITY GRID UTILITY PV PRODUCTION METER BASE 4 4 (N) 40A FUSES PV AC DISCONNECT 60A FUSED, VISIBLE, LOCKABLE, LABELED, OPEN 240V, 2-POLE LINE SIDE LOAD SIDE Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 LINE DIAGRAM - PV05 DRAWN BY: SoloCAD AP Systems YC600 Specs MAX INPUT VOLTAGE:55 V MAX DC SHORT CIRCUIT CURRENT:12 A MAXIMUM OUTPUT POWER:548 W MAXIMUM OUTPUT CURRENT:2.28 A NOM. OUTPUT VOLTAGE:240 V MAX UNITS PER 20A CIRCUIT:7 1-Phase, 60 HZ, UL 1741 Listed Mission Solar MSE345SX5T Specs POWER MAX (PMAX):345W OPEN CIRCUIT VOLTAGE (VOC):41V MAX POWER-POINT CURRENT (IMP):10.34A MAX POWER-POINT VOLTAGE (VMP):33.37V SHORT CIRCUIT CURRENT (ISC):10.92A SERIES FUSE RATING:20A VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER Conduit & Conductor Schedule TAG QTY WIRE GAUGE DESCRIPTION CONDUIT SIZE 1 (2)12-2 TC-ER, THWN-2, COPPER (L1, L2)N/A - FREE AIR(1)6 AWG THWN-2 COPPER - (GROUND) 2 (2)10 AWG THHN/THWN-2, COPPER - (L1, L2)3/4" EMT(1)10 AWG THWN-2 COPPER - (GROUND) 3 (4)10 AWG THHN/THWN-2, COPPER - (L1, L2)3/4" EMT(1)10 AWG THWN-2 COPPER - (GROUND) 4 (3)6 AWG THWN-2 COPPER - (L1, L2, NEUTRAL)3/4" EMT(1)8 AWG THWN-2 COPPER - (GROUND) Equipment Schedule TYPE:QTY:DESCRIPTION:RATING: MODULES:(25)Mission Solar MSE345SX5T 345 W INVERTERS:(13)AP Systems YC600 548 W AC DISCONNECTS:(1)PV AC Disconnect, 240V, 2-Pole 60 A INTERCONNECTION NOTES 1. GROUND FAULT PROTECTION IN ACCORDANCE WITH [NEC 215.9] & [NEC 230.95] 2. SUPPLY SIDE INTERCONNECTION ACCORDING TO [NEC705.12(A)] WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH [NEC 240.21(B)] DISCONNECT NOTES 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS) 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH. 3. FUSED AC DISCONNECT TO BE USED. GROUNDING & GENERAL NOTES: 1. PV INVERTER IS UNGROUNDED, TRANSFORMER-LESS TYPE. 2. DC GEC AND AC EGC TO BE SPLICED TO EXISTING ELECTRODE 3. ANY EXISTING WIRING INVOLVED WITH PV SYSTEM CONNECTION THAT IS FOUND TO BE INADEQUATE PER CODE SHALL BE CORRECTED PRIOR TO FINAL INSPECTION. 4. JUNCTION BOX QUANTITIES, AND PLACEMENT SUBJECT TO CHANGE IN THE FIELD - JUNCTION BOXES DEPICTED ON ELECTRICAL DIAGRAM REPRESENT WIRE TYPE TRANSITIONS. 5. AC DISCONNECT NOTED IN EQUIPMENT SCHEDULE OPTIONAL IF OTHER AC DISCONNECTING MEANS IS LOCATED WITHIN 10' OF SERVICE DISCONNECT. STRING CALCULATIONS MAX AC CURRENT: MICRO INVERTERS IN SERIES NOMINAL STRING VOLTAGE: MAX AC OUTPUT POWER ARRAY DC POWER: TOTAL MAX AC CURRENT: STRING #1 15.96A 7 240V 3836W 8625W 29.64A STRING #2 13.68A 6 240V 3288W AP Systems YC600 Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 ELECTRICAL CALCS - PV06 DRAWN BY: SoloCAD Conduit & Conductor Schedule TAG QTY WIRE GAUGE DESCRIPTION CONDUIT SIZE CONDUCTOR RATING CONDUCTOR TEMP. RATE AMBIENT TEMP TEMP. DERATE # OF CONDUCTORS DERATE CONDUCTOR RATING W/DERATES CONDUIT FILL 1 (2)12-2 TC-ER, THWN-2, COPPER (L1, L2)N/A - FREE AIR 30A 90°C 32°C 0.96 N/A - FREE AIR 28.8A N/A - FREE AIR(1)6 AWG THWN-2 COPPER - (GROUND) 2 (2)10 AWG THHN/THWN-2, COPPER - (L1, L2)3/4" EMT 40A 90°C 32°C 0.96 1 38.4A 11.9%(1)10 AWG THWN-2 COPPER - (GROUND) 3 (4)10 AWG THHN/THWN-2, COPPER - (L1, L2)3/4" EMT 40A 90°C 32°C 0.96 0.8 30.72A 19.8%(1)10 AWG THWN-2 COPPER - (GROUND) 4 (3)6 AWG THWN-2 COPPER - (L1, L2, NEUTRAL)3/4" EMT 65A 75°C 32°C 0.96 1 62.4A 35.5%(1)8 AWG THWN-2 COPPER - (GROUND) SYSTEM OCPD CALCULATIONS INVERTER MODEL(S):AP Systems YC600 # OF INVERTERS:13 MAX OUTPUT CURRENT:2.28A (# OF INVERTERS) X (MAX OUTPUT CURRENT) X 125% <= OCPD RATING (13 X 2.28A X 1.25) = 37.05A <= 40A, OK SUPPLY SIDE INTERCONNECTION MAIN BUSBAR RATING:150A MAIN DISCONNECT RATING:150A PV OCPD RATING:40A SERVICE RATING >= PV OCPD 150A >= 40A, OK NUMBER OF CURRENT CARRYING CONDUCTORS PERCENT OF VALUES 4-6 .80 7-9 .70 10-20 .50 Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 LABELS - PV07 DRAWN BY: SoloCAD LABEL 6 MARKED AT AC DISCONNECTING MEANS. [NEC 690.54] LABEL 5 EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL SOURCES.[NEC 705.12(B)(2)(3)(c)] LABEL 3 PLACED ADJACENT TO THE BACK-FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(B)(2)(3)(c)] *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON THE ELECTRICAL DIAGRAM PAGE. JUNCTION BOX OR COMBINER BOX MAIN SERVICE PANEL AC DISCONNECT EXISTING SUB PANEL (IF WHERE POINT OF INTERCONNECTION IS MADE) PV COMBINER SUBPANEL - IF USED TO COMBINE PV OUTPUT CIRCUITS AC DC INVERTER (S) INTEGRATED DC DISCONNECT 2 8 6 9 5 (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) 7 1 1 1 5 (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) 7 3 LABELING DIAGRAM: LABEL 7 AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 690.31(D)(2)] LABEL 9 SIGN LOCATED ON OR NO MORE THAN 3FT FROM INITIATION DEVICE [NEC 690.56(C)(2)]. LABEL 8 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(A)] LABEL 1 PLACED ON THE MAIN DISCONNECTING MEANS FOR THE PV SYSTEM. [NEC 690.13(B)] LABELING NOTES: 1.LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2.LABELING REQUIREMENTS BASED ON THE 2020 NATIONAL ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI Z535. 3.MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 4.LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC 110.21] 5.LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND; REFLECTIVE, AND PERMANENTLY AFFIXED [IFC 605.11.1.1] 3 4 1 LABEL 4 PLACED ON EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES [NEC 705.10(C)] 2 3 4 1 LABEL 2 FOR PV DISCONNECTING MEANS WHERE THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(B)] WARNING! TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION !WARNING THIS EQUIPMENT IS FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. PHOTOVOLTAIC AC DISCONNECT RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: ELECTRIC SHOCK HAZARD MAIN PHOTOVOLTAIC SYSTEM DISCONNECT WARNING! POWER SOURCE OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE. WARNING!DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM PHOTOVOLTAIC POWER SOURCE TURN RAPID SHUTDOWN SWICH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM 30 240 AC MSP M PV C JB JB Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 POWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLAR ARRAYS WITH SAFETY DISCONNECTS AS SHOWN: CAUTION DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM. (ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS OUTLINED WITHIN: NEC 690.56(B)&(C), [NEC 705.10]) 16920 Firestone Path, Farmington MN 55024 PLACARD - PV08 DRAWN BY: SoloCAD SYSTEM UTILIZES MICROINVERTERS LOCATED UNDER EACH MODULE FRONT OF HOMEPV ARRAY MAIN DISTRIBUTION UTILITY DISCONNECT COMBINER RAPID SHUTDOWN AC DISCONNECT SWITCH Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 SITE PHOTOS: SITE PHOTOS - PV09 DRAWN BY: SoloCAD Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 SITE PHOTOS: FRONT/BACK VIEWS - PV09.1 DRAWN BY: SoloCAD Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 SITE PHOTOS: SIDE VIEWS - PV09.2 DRAWN BY: SoloCAD Everlight Solar Construction 7369 Highway 13 W Savage,MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Linda Lentz 16920 Firestone Path Farmington, MN 55024 AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.625 kW DC Lat, 44.7042352 Long, -93.1945408 (25) Mission Solar MSE345SX5T PV MODULES (13) AP Systems YC600 INVERTER(S) Dakota Electric DATE: May 20, 2022 SITE PHOTOS: METER/OPEN MSP - PV09.3 DRAWN BY: SoloCAD Brand Name:Milbank Type:Wire Connector Kit Application:Metering Accessory Standard:UL Listed Connection:Mechanical Conductor Range:12 to 1/0 Awg Number Of Conductors: 0 Material:Aluminum Insulation:None Temperature Rating:75 Degrees Celsius Mounting:Slide Nut Consist Of:Slide Nut, Set Screw, Connector Utility requirements may vary. Always consult the serving utility for their requirements prior to ordering or installing this equipment. This product must always be installed by a licensed electrician. Installation of this equipment may require local electrical inspector approval. milbankworks.com K4977-INT 100A CONN AND SLIDE 784572274365 Catalog Number: Item Description: UPC Code: