Project Details
1
2 & 3
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota,
Brett D. Veazie, License No. 56392,
Expiration Date: 30-June-2022
04/29/2022
VSE Project Number: U3759.0019.221
Vector Structural Engineering has reviewed the existing structure with loading from
the solar array and screw connections to the existing framing. The design of the
racking system, racking connections, and all other structural is by others.
Mechanical, architectural, and all other nonstructural aspects of the design are by
others. Electrical is by others, unless stamped by Dean Levorsen.
Page 2
Overhead
36”
Pathway
18” Setback
1
2&3
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota,
Brett D. Veazie, License No. 56392,
Expiration Date: 30-June-2022
04/29/2022
VSE Project Number: U3759.0019.221
Vector Structural Engineering has reviewed the existing structure with loading from
the solar array and screw connections to the existing framing. The design of the
racking system, racking connections, and all other structural is by others.
Mechanical, architectural, and all other nonstructural aspects of the design are by
others. Electrical is by others, unless stamped by Dean Levorsen.
Page 3
Roof Section 1
12’ 8.5”
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property
12’ 4.5”
18’ 7”
18’ 11”
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota,
Brett D. Veazie, License No. 56392,
Expiration Date: 30-June-2022
04/29/2022
VSE Project Number: U3759.0019.221
Vector Structural Engineering has reviewed the existing structure
with loading from the solar array and screw connections to the
existing framing. The design of the racking system, racking
connections, and all other structural is by others. Mechanical,
architectural, and all other nonstructural aspects of the design are by
others. Electrical is by others, unless stamped by Dean Levorsen.
Page 4
Roof Section 2
42’
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property
41’ 7”
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota,
Brett D. Veazie, License No. 56392,
Expiration Date: 30-June-2022
04/29/2022
VSE Project Number: U3759.0019.221
Vector Structural Engineering has reviewed the existing structure
with loading from the solar array and screw connections to the
existing framing. The design of the racking system, racking
connections, and all other structural is by others. Mechanical,
architectural, and all other nonstructural aspects of the design are by
others. Electrical is by others, unless stamped by Dean Levorsen.
Page 5
Roof Section 3
12’ 8.5”
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property
24’ 9.5”12’ 4.5”
41’ 7”
25’ 1”
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota,
Brett D. Veazie, License No. 56392,
Expiration Date: 30-June-2022
04/29/2022
VSE Project Number: U3759.0019.221
Vector Structural Engineering has reviewed the existing structure
with loading from the solar array and screw connections to the
existing framing. The design of the racking system, racking
connections, and all other structural is by others. Mechanical,
architectural, and all other nonstructural aspects of the design are by
others. Electrical is by others, unless stamped by Dean Levorsen.
Cut List
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota,
Brett D. Veazie, License No. 56392,
Expiration Date: 30-June-2022
04/29/2022
VSE Project Number: U3759.0019.221
Vector Structural Engineering has reviewed the existing structure with loading from the
solar array and screw connections to the existing framing. The design of the racking
system, racking connections, and all other structural is by others. Mechanical,
architectural, and all other nonstructural aspects of the design are by others. Electrical
is by others, unless stamped by Dean Levorsen.
PlyWood
Comp
Shingle
Rafter
OR Truss22°
Shingle Mount
4” Max
Flash Loc
UniRac
Iron Ridge
3”
Page 6
Roof Fastener Detail
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota,
Brett D. Veazie, License No. 56392,
Expiration Date: 30-June-2022
04/29/2022
VSE Project Number: U3759.0019.221
Vector Structural
Engineering has reviewed
the existing structure with
loading from the solar array
and screw connections to
the existing framing. The
design of the racking
system, racking
connections, and all other
structural is by others.
Mechanical, architectural,
and all other nonstructural
aspects of the design are
by others. Electrical is by
others, unless stamped by
Dean Levorsen.
Utility and Solar Equipment
Combiner, Disconnect, Meters
Ground Level
Page 7
Roof Mount Specs
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property
Utility and Solar Equipment
Combiner, Disconnect, Meters
Ground Level
Page 8
Rail Specs
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property
Utility and Solar Equipment
Combiner, Disconnect, Meters
Ground Level
Page 9
Hardware Specs
Site Information
OWNER –Jay Steele
728 Chicago Dr,
Burnsville, MN 55306
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(28) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 592 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)30°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 30”
Max Span 1) 76”
The installation address is not within a heritage
preservation district, or on a landmark property
Utility and Solar Equipment
Combiner, Disconnect, Meters
Ground Level
Page 10
Inverter Specs
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property
Utility and Solar Equipment
Combiner, Disconnect, Meters
Ground Level
Page 11
Panel Specs
Site Information
OWNER –Chad Koepke
18735 Kanabec Trail,
Lakeville, MN 55044,
Builder -3 Rivers Contracting-BC760638
Contact -Ryan Ihle 651.214.6640
Panel Info
SRCC Certified*
(29) 400 Watt –11.2 kW DC Grid Tied /
8.260 kW AC
NO Battery Backup or UPS
PANELS WILL BE FLUSH MOUNTED
Width = 41.14” , Height = 73.98”
Total Collector Size 613 total square feet
Distributed Weight 2.8 lbs/sq. ft
Roof Info
Asphalt Shingle -1 Layer –less than 5
years old
Roof Slopes
1)22°
Roof Structure
1) 2x4s –24” on center
Iron Ridge Manufacturer Design Specs
System is to be installed according to
panel & rack manufacturer’s instructions
Max Cantilever 1) 29”
Max Span 1) 72”
The installation address is not within a heritage
preservation district, or on a landmark property