Loading...
HomeMy WebLinkAbout17841 Graphite Lane SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________07/11/2022 lritchie Planning DepartmentApprovedDate:__________________07/19/2022 kjenson