Loading...
HomeMy WebLinkAbout8069 186th Street SurveyThe curb box, drain tile cleanout, and catch basin(if applicable) must be inspected and accepted before As-Built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________07/08/2022 lritchie Planning DepartmentApprovedDate:__________________07/13/2022 dmorey