HomeMy WebLinkAbout18003 Headwaters Dr SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________05/25/2022lritchieZoning = RS-4FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'18003 Headwaters Dr