HomeMy WebLinkAbout5931 178th St Surveyc Pioneer Engineering
Revisions:
1.) 6-17-22 House Stake
2.) 07-28-22 Drain tile
coordinates turned on
Certificate of Survey for:
2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914
www.pioneereng.comFax: (651) 681-9488
Project # :Folder #:Drawn by:
CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS
Key-Land Homes
17021 Fishpoint Rd SE
Prior Lake, MN 55372-3326
Phone: (952) 440-9400 / Fax: (952) 440-9405
Zoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' Corner
RY - 30'SY Buffer - 30'RY Buffer - 50'
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
EROSION CONTROL
MUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________07/29/2022 lritchie