Loading...
HomeMy WebLinkAbout20198 Gambrel Path-SurveyGENEVA TRAILGAMBREL PATH 202ND STREET W 4SSANSANSANSANSANSANSAN SANSANSANSANSANSAN SANSANSANSANSANSANSANSANSANSANSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTO STO STO STOSTOSTOSTO STO STO STOWATWATWATWATWATWATWATWATWATWATWATWATWATWAT WAT WAT WAT DTDTDTDTDT DT CO CO DT LOT 1 X (103 2.6) Drainage and Utility Easement over all of Lot 12, Block 4 per the plat of CEDAR HILLS 2ND ADDITION Proposed House Buckingham EJ04, Elev. A2W Lookout Lowest Floor Elev. = (1025.43) Top of Foundation @ Lookout Elev.= (1028.60) 50.00 N89°57'15"E N00°02'45"W 95.00N00°02'45"W 95.00N89°57'15"E 50.00 (1033.10) 23.50 5.00 17.125.13 4.0020.00 6.130.13 0.1312.13 10.120.13 15.135.00 10.0025.0016.00 43.005.00 Garage Porch Covered DeckSidew alk (6.0%)15.1365.8714.0014.0065.8815.131030.28 1027.44 1028.20 1032.14 X (1022.5 ) E O F X 1 0 2 1 . 4 1 R E X ( 1 0 2 7 . 9 ) X ( 1 0 2 7 . 9 ) X (1 0 2 7 . 4 ) X (1 0 2 7 . 4 )1030102810261 0 2 4 Existing Trail 1024.13TC XX 1 0 2 2 . 5 1 T C 1021.0 7 T C X 1023.7 4 T C X 1025.1 6 R E X X 1028.88TCX 1030.53TCX 1031.30TC60.00 foot Public Right of Way 60.00 foot Public Right of Way100.00 foot Public Right of Way S S ST CS T E 1020.49RE X 102 4. 7 4 X X 10 2 3 . 1 8 X 1 0 2 1 . 0 4 1025.76T C X 1031.8 X1028 .2 X X 10 27. 6 X 1 0 3 0 . 7 1026.3 X 1027. 2 X167328.69 N526534.30 E167 3 2 2 . 6 3 N 526 4 8 8 . 7 5 E 167187. 02 N 526488.63 E 167195.52 N 526542.88 E167219.54 N526541.65 EDrain Tile Cleanout 1034103210301028 1026 1024 102410 2 2 103221.50 24.500.13 31.3812.00 10.0027.7563.7512.75 8.005.62 10.12N:\0025850.01\DWG\SURVEY\2ND ADD\0025850.01B04L01 2ND.DWG1 1 07/07/2022 MJW BTW SHEET NUMBER: DATE: OF .FIELD CREW: DRAWN: CHECKED: Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Œ:HVWZRRG3URIHVVLRQDO6HUYLFHV,QF Common Ground Alliance Call 48 Hours before digging: 811 or call811.com Lakeville, Minnesota Cedar Hills Certificate of SurveyLennar PROJECT NUMBER: 0025850.01 0'20'40' 1) Curb & gutter and utilities are existing. 2) Building dimensions do not reflect brick facing. 3) Grading Plan by Westwood Professional Services Inc. initial submittal date 02/06/20. 4) Building shown reflects Buckingham foundation plan, sheet A2, dated 06/01/2022. Lot 1, Block 4, CEDAR HILLS 2ND ADDITIO according to the recorded plat thereof, Dak County, Minnesota. Address-20198 Gambrel Path LEGEND CABLE TV BOXTV NATURAL GAS METERG STREET LIGHT ELECTRIC BOXE ELECTRIC METERE SANITARY MANHOLES SEWER CLEANOUTCO CATCH BASIN STORM MANHOLEST TELEPHONE BOXT GATE VALVE HYDRANT WATER METERW CURB STOP BOXCS WATERMAIN SANITARY SEWER STORM SEWER SAN STO WAT FLARED END SECTION Garage Floor Elev. = (1033.10)(at overhead Top of Poured Foundation Wall Elev. = (10 Lowest Floor Elev. = (1025.43) Top of Foundation Wall @ Lookout Elev. = (1028.60) I hereby certify that this survey was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. 07/18/2022 Mathew J. Welinski Date Minnesota License No. 53596 matt.welinski@westwoodps.com Denotes iron monument found Denotes iron monument set x xxx.x Denotes existing elevation x (xxx.xx) Denotes proposed elevation Benchmark- Minnesota Department Transportation Control Point "1914 H Elevation = 959.11 (N.A.V.D. 1988), not graphically shown. IMPERVIOUS SURFACE CALCULATIONS Lot area = 4,750 sq. ft. House area = 2,418 sq. ft. Porch area = 164 sq. ft. Covered Deck area = 123 sq. ft. Driveway and Sidewalk = 250 sq. ft. Impervious area 2,955 sq. ft. / 62.2% of total of lot area LOT GRADING CALCULATIONS Basement Excavation = 202 cubic yards Finished Lot Grading= 131 cubic yards Material (excess/needed) 71 cubic y excess Planning DepartmentApprovedDate:__________________07/25/2022 kjenson The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. *Draintile connection required.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________07/28/2022 lritchie