HomeMy WebLinkAbout20198 Gambrel Path-SurveyGENEVA TRAILGAMBREL PATH
202ND STREET W
4SSANSANSANSANSANSANSAN SANSANSANSANSANSAN
SANSANSANSANSANSANSANSANSANSANSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTO
STO
STO
STOSTOSTOSTO
STO
STO
STOWATWATWATWATWATWATWATWATWATWATWATWATWATWAT WAT WAT WAT
DTDTDTDTDT
DT
CO CO
DT
LOT 1
X (103
2.6)
Drainage and Utility Easement over
all of Lot 12, Block 4 per the plat of
CEDAR HILLS 2ND ADDITION
Proposed House
Buckingham EJ04, Elev. A2W
Lookout
Lowest Floor Elev. = (1025.43)
Top of Foundation @
Lookout Elev.= (1028.60)
50.00
N89°57'15"E
N00°02'45"W 95.00N00°02'45"W 95.00N89°57'15"E 50.00
(1033.10)
23.50 5.00
17.125.13 4.0020.00
6.130.13
0.1312.13 10.120.13
15.135.00 10.0025.0016.00
43.005.00
Garage
Porch
Covered
DeckSidew
alk (6.0%)15.1365.8714.0014.0065.8815.131030.28
1027.44 1028.20
1032.14
X (1022.5
)
E
O
F
X 1
0
2
1
.
4
1
R
E
X
(
1
0
2
7
.
9
)
X
(
1
0
2
7
.
9
)
X (1
0
2
7
.
4
)
X (1
0
2
7
.
4
)1030102810261
0
2
4
Existing Trail
1024.13TC XX
1
0
2
2
.
5
1
T
C
1021.0
7
T
C
X
1023.7
4
T
C
X
1025.1
6
R
E
X X 1028.88TCX 1030.53TCX 1031.30TC60.00 foot Public Right of Way
60.00 foot Public Right of Way100.00 foot Public Right of Way
S
S
ST
CS
T E
1020.49RE
X
102
4.
7
4 X
X 10
2
3
.
1
8
X
1
0
2
1
.
0
4
1025.76T
C
X
1031.8 X1028
.2
X
X 10
27.
6
X
1
0
3
0
.
7
1026.3
X
1027.
2
X167328.69 N526534.30 E167
3
2
2
.
6
3
N
526
4
8
8
.
7
5
E
167187.
02
N
526488.63 E
167195.52 N
526542.88 E167219.54 N526541.65 EDrain Tile
Cleanout 1034103210301028
1026
1024
102410
2
2 103221.50
24.500.13
31.3812.00
10.0027.7563.7512.75
8.005.62 10.12N:\0025850.01\DWG\SURVEY\2ND ADD\0025850.01B04L01 2ND.DWG1
1
07/07/2022
MJW
BTW
SHEET NUMBER:
DATE:
OF
.FIELD CREW:
DRAWN:
CHECKED:
Phone (952) 937-5150 12701 Whitewater Drive, Suite #300
Fax (952) 937-5822 Minnetonka, MN 55343
Toll Free (888) 937-5150
:HVWZRRG3URIHVVLRQDO6HUYLFHV,QF
Common Ground Alliance
Call 48 Hours before digging:
811 or call811.com
Lakeville, Minnesota
Cedar Hills
Certificate of SurveyLennar
PROJECT NUMBER: 0025850.01
0'20'40'
1) Curb & gutter and utilities are existing.
2) Building dimensions do not reflect brick facing.
3) Grading Plan by Westwood Professional Services Inc.
initial submittal date 02/06/20.
4) Building shown reflects Buckingham foundation plan,
sheet A2, dated 06/01/2022.
Lot 1, Block 4, CEDAR HILLS 2ND ADDITIO
according to the recorded plat thereof, Dak
County, Minnesota.
Address-20198 Gambrel Path
LEGEND
CABLE TV BOXTV
NATURAL GAS METERG
STREET LIGHT
ELECTRIC BOXE
ELECTRIC METERE
SANITARY MANHOLES
SEWER CLEANOUTCO
CATCH BASIN
STORM MANHOLEST
TELEPHONE BOXT
GATE VALVE
HYDRANT
WATER METERW
CURB STOP BOXCS
WATERMAIN
SANITARY SEWER
STORM SEWER
SAN
STO
WAT
FLARED END SECTION
Garage Floor Elev. = (1033.10)(at overhead
Top of Poured Foundation Wall Elev. = (10
Lowest Floor Elev. = (1025.43)
Top of Foundation Wall @
Lookout Elev. = (1028.60)
I hereby certify that this survey was prepared by me or under
my direct supervision and that I am a duly Licensed Land
Surveyor under the laws of the State of Minnesota.
07/18/2022
Mathew J. Welinski Date
Minnesota License No. 53596
matt.welinski@westwoodps.com
Denotes iron monument found
Denotes iron monument set
x xxx.x Denotes existing elevation
x (xxx.xx) Denotes proposed elevation
Benchmark- Minnesota Department
Transportation Control Point "1914 H
Elevation = 959.11 (N.A.V.D. 1988),
not graphically shown.
IMPERVIOUS SURFACE CALCULATIONS
Lot area = 4,750 sq. ft.
House area = 2,418 sq. ft.
Porch area = 164 sq. ft.
Covered Deck area = 123 sq. ft.
Driveway and Sidewalk = 250 sq. ft.
Impervious area 2,955 sq. ft. /
62.2% of total of lot area
LOT GRADING CALCULATIONS
Basement Excavation = 202 cubic yards
Finished Lot Grading= 131 cubic yards
Material (excess/needed) 71 cubic y
excess
Planning DepartmentApprovedDate:__________________07/25/2022 kjenson
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.EROSION CONTROL
MUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________07/28/2022 lritchie