HomeMy WebLinkAbout17718 Embers Ave SurveyZoning = RST-2
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROL
MUST BE INSTALLED
BEFORE EXCAVATION
ENGINEERING REVIEWED
Date:__________________07/26/2022 lritchie