Loading...
HomeMy WebLinkAbout8104 186th Street W SurveyPlanning DepartmentApprovedDate:__________________08/04/2022 dmorey The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________08/04/2022 lritchie