HomeMy WebLinkAbout18529 Hamel Drive-SurveyPlanning DepartmentApprovedDate:__________________08/04/2022 dmorey
ENGINEERING REVIEWED
Date:__________________08/10/2022 lritchie
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
EROSION CONTROL
MUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.