Loading...
HomeMy WebLinkAbout18529 Hamel Drive-SurveyPlanning DepartmentApprovedDate:__________________08/04/2022 dmorey ENGINEERING REVIEWED Date:__________________08/10/2022 lritchie The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements.