Loading...
HomeMy WebLinkAbout5001-5-9-13 161st St SurveyTop nut of hydrant located at Lot 1, Block 2 = 935.71 1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 8/9/2019.7.Plan No. C1 & C2, D1 & D2NOTESPROPERTY DESCRIPTION5001, 5005, 5009, 5013 161st Street West, Lakeville, MinnesotaPROPERTY ADDRESSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 3rd day of August, 2022Marcus F. Hampton, MN L.S. No. 47481SURVEYOR'S CERTIFICATEBENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationDenotes as-built elevationJames R. Hill, Inc. 2999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306 PHONE: 952.890.6044 www.jrhinc.com PLANNERS / ENGINEERS / SURVEYORS CERTIFICATE OF SURVEY FORDRAWN BYDATEREVISIONS8/3/2022CAD FILEPROJECT NO.SHEET 1 OF 1Lots 1, 2, 3, 4, Block 1, SPIRIT OF BRANDTJEN FARM 21ST ADDITION, DakotaCounty, MinnesotaRT URBAN HOMESJCB Lots 1, 2, 3, 4, Block 1, SPIRIT OF BRANDTJEN FARM 21ST ADDITION, Dakota County, Minnesota420751.dwg420751ProposedGarage Floor @ Front= 932.6Garage Top of Block= 933.3House Top of Block= 941.3Lowest Floor= 933.3Top of Block at Entry= 936.5FLOOR ELEVATIONSLot 1 & 4Lot= 1,512 sq. ft.House/Garage= 824 sq. ft.Porch= 40 sq. ft.Driveway= 162 sq. ft.Total Impervious= 1,026 sq. ft. or67.9 % of lotHARD COVER CALCULATIONSLot 2 & 3= 1,232 sq. ft.= 824 sq. ft.= 40 sq. ft.= 162 sq. ft.= 1,062 sq. ft. or86.2 % of lotDRIVEWAY TOTAL: 531 sq. ft.531 sq. ft.Planning DepartmentApprovedDate:__________________08/16/2022dmoreyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________08/19/2022lritchie