Loading...
HomeMy WebLinkAbout17983 Gresford Lane-SURVEYPlanning DepartmentApprovedDate:__________________05/20/2022 kjenson The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________05/23/2022 lritchie