HomeMy WebLinkAbout17983 Gresford Lane-SURVEYPlanning DepartmentApprovedDate:__________________05/20/2022 kjenson The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
ENGINEERING REVIEWED
Date:__________________05/23/2022 lritchie