Loading...
HomeMy WebLinkAbout17924 Eclipse AveRECEIVED By Lucas Ritchie at 4:13 pm, Sep 20, 2022 CITY OF LAKEVILLE CERTIFICATION OF GRADING AND FINAL PLACEMENT OF IRON MONUMENTS Building Permit # LA200990 Legal Description Lot 6 Block 6 Subdivision PHESANT RUN OF LAKEVILLE 5TH ADDITION Address 17924 Eclipse Avenue I hereby certify that on the 14th day of September. 2022 an inspection of this property was conducted by me or under my direct supervision and that the as -built grades, elevations and drainage patterns of the site and building are in conformance with the grading plan approved by the City Engineer or amendments previously approved by the City Engineer In addition, all property corner monuments are in place as of this date I hereby certify that this survey plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota Signature Print Name Date - 1i Marcus F Hampton 9/15/2022 MN License # 47481 NOTE: ATTACH A COPY OF THE CERTIFICATE OF SURVEY SHOWING ALL AS - BUILT GRADES. ELEVATIONS AND DRAINAGE PATTERNS Approved subdivision grading plans should be obtained from the property owner or developer General questions relating to the building permit should be directed to the Building Inspections Department at 952-985-4440 Questions relating to grading should be directed to the Engineenng Department at 952-985-4500 Prior to release of the Grading Security, this document shall be filed with: City of Lakeville Engineering Department 20195 Holyoke Avenue Lakeville, MN 55044 11x17 O • tc X900.0 (930.0) x[900.0] ECLIPSE AVENUE rr [918.0 S89°50'35"E [923.1]tc /., [922.81s, [921.$o5]tc [923.81 (923.8)/' 1IF'- DRIVEWAY 5 co M1 0Ni N I Ce 17 [925.8 Denotes set spike Denotes set iron monument Denotes found iron monument Denotes proposed drainage Denotes top of curb Denotes existing elevation Denotes proposed elevation Denotes as -built elevation 926.0] [923.0] [94.5] [917.5] Z o 5 DRAINAGE & UTILITY `n n EASEMENT PER PLAT-i 1 J Wt.9] [91t69]] [9169Is1691 r91651 70.00 .5] EL_921.98 ., [923.5] - _1922 24.9 I EL.0o532a922.4) 1 , Ip o 'N(926.0) „ M . N cV O :IN N EXISTING/ 2 L1J /HOUSE. (WALKOUT) / In [91 .3/ 42.V N n 0 LOT 6! o NIZ 5 [917.1]�O 1916.81A: .4916.7] (916.5 � . _ 70.00 _ � (916.5) S89°50'35"E it 179217.04 E:530155.00 SCALE IN FEET 9 30' PROPERTY DESCRIPTION Lot 6, Block 6, PHEASANT RUN OF LAKEVILLE 5TH ADDITION, Dakota County, Minnesota PROPERTY ADDRESS 17924 Eclipse Avenue, Lakeville, Minnesota NOTES 1. Bearings are based on the recorded plat. 2. Building dimensions shown are for horizontal and vertical placement of structure only. See architectural plans for building and foundation dimensions. 3. No specific soils investigation has been completed on this lot by James R. Hill, Inc. the suitability of soils to support the specific house proposed is not the responsibility of James R. Hill, Inc. or the surveyor. 4. No specific title search for existence or non-existence of recorded or un-recorded easements has been conducted by the surveyor as a part of this survey. Only easements per the recorded plat are shown. 5. Proposed grades shown were taken from the grading &/or development plan prepared by KJ Walk, Inc. 6. Grading plan date/revision date: 5/11/2020. BENCHMARK Top nut of hydrant located at Lots 6 and 7, Block 6 = 924.80 FLOOR ELEVATIONS Garage Floor @ Front Garage Top of Block House Top of Block Lowest Floor Proposed Asbuilt = 926.3 = 926.4 = 926.7 = 926.7 = 926.7 = 926.7 = 918.7 = 918.7 HARD COVER CALCULATIONS Lot House/Garage Porch Driveway Total Impervious = 8,400 sq. ft. = 1,905 sq. ft. = 111 sq. ft. = 710 sq. ft. = 2,726 sq. ft. or 32.5% of lot SURVEYOR'S CERTIFICATE I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. That this survey does not purport to show all improvements, easements or encroachments, to the property except as shown thereon. Signed this 15th day of September, 2022 60' Ma rig M ` 1 V Cip CC uJ w CC N CC L.L.1 w c3 w cn 11 LLJ J 0 cid U) a) E DRAWN BY TAM DATE 3/10/2022 REVISIONS A 4/29/22 Re -Make U L 0 ccs a) 0 0 0 0 Ln .R 9/15/22 Final grade As -built CAD FILE 420304.dwg PROJECT NO. 420304 SHEET 1 OF 1