Loading...
HomeMy WebLinkAbout17833 Graphite Lane SurveyPlanning DepartmentApprovedDate:__________________09/19/2022 kjenson ENGINEERING REVIEWED Date:__________________09/23/2022 lritchie The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements.