Loading...
HomeMy WebLinkAbout20450 Ginger Ct SurveyGATEWAY DRIVEGINGER COURT LOT 20 6 Proposed House Lewis EK05, Elev. D3 Lookout Lowest Floor Elev. = (987.33) Top of Foundation @ Lookout Elev.= (990.50) SAN SAN SAN SAN SAN SANSANSANSANSANSANSANSANSANSAN STO S TO S TO S TO STOSTOSTOWATWATWATWATWATWATWATWATWATWATWAT23Drainage and Utility Easement per the plat of CEDAR HILLS 2ND ADDITION Building Pad per Grading Plan Building Setback (993.3) 992.7 60.00 foot Public Right of Way 205TH STREET WEST Variable Width Public Right of Way Existing Bituminous Trail (984.5) 984.5 5 10(994.7) 994.3 (987.9) 986.9 5 1010 10101082.43 N88°07'39"W L=152.49R=770.00Δ=11°20'49"100.04 N86°36'06"WN01°52'21"E 148.56Garage Porch 20.50 10.126.62 2.0012.75 37.7539.7523.3810.1220.5010.00 2.0034.38 15.00 22.18 22.05 77.1845.8725.50992.44 989.43 992.56 993.9525.5012.05 77.7525.43993.74TC XX 994.22TC X 992.40TC X 990.84TC X 988.02TC X 986.96TCExisting Sidewalk984.76TC XT CS 994.36 9 9 2 . 8 0 991 . 21 989.65988.41E 98 6 . 9 1 986.34 9 8 5 . 5 4 984.88 9 8 4 . 2 6 X 9 9 2 . 4 993.2 X99 1 . 4 X X 990. 2 985.87TC XX 989.21TC992.68TC X995.12TC X 165826.80 N526691.83 E165972.22 N526679.90 E165975.49 N 526629.96 E 983.65TC XExisting Sidewalk(3.2%)19.50 6.130.13 S S (995.00) 22.43 Proposed Sidewalk (989.8) XX ( 9 8 9 . 8 ) X (989. 3 ) (989.3) X 988 986 984 986 990 9 9 2 994X (994.5)994992 99 0 60.00 foot Public Right of Way16 5 8 3 3 . 3 1 N 52 6 6 6 7 . 9 8 E Drain TileCleanoutN:\0025850.01\DWG\SURVEY\2ND ADD\0025850.01B06L20 2ND.DWG1 1 09/21/2022 MJW BTW SHEET NUMBER: DATE: OF .FIELD CREW: DRAWN: CHECKED: Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Œ:HVWZRRG3URIHVVLRQDO6HUYLFHV,QF Common Ground Alliance Call 48 Hours before digging: 811 or call811.com Lakeville, Minnesota Cedar Hills Certificate of SurveyLennar PROJECT NUMBER: 0025850.01 0'20'40' 1) Curb & gutter and utilities are existing. 2) Building dimensions do not reflect brick facing. 3) Grading Plan by Westwood Professional Services Inc. initial submittal date 02/06/20. 4) Building shown reflects Lewis foundation plan, sheet A2, dated 06/01/2022 Lot 20, Block 6, CEDAR HILLS 2ND ADDITION, according to the recorded plat thereof, Dakota County, Minnesota. Address- 20450 Ginger Court LEGEND CABLE TV BOXTV NATURAL GAS METERG STREET LIGHT ELECTRIC BOXE ELECTRIC METERE SANITARY MANHOLES SEWER CLEANOUTCO CATCH BASIN STORM MANHOLEST TELEPHONE BOXT GATE VALVE HYDRANT WATER METERW CURB STOP BOXCS WATERMAIN SANITARY SEWER STORM SEWER SAN STO WAT FLARED END SECTION Garage Floor Elev. = (995.00)(at overhead door) Top of Poured Foundation Wall Elev. = (995.33) Lowest Floor Elev. = (987.33) Top of Foundation Wall @ Lookout = (990.50) I hereby certify that this survey was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. 10/03/2022 Mathew J. Welinski Date Minnesota License No. 53596 matt.welinski@westwoodps.com Denotes iron monument foun Denotes iron monument set x xxx.x Denotes existing elevation x (xxx.xx) Denotes proposed elevati Benchmark- Minnesota Department of Transportation Control Point "1914 H", Elevation = 959.11 (N.A.V.D. 1988), not graphically shown. IMPERVIOUS SURFACE CALCULATIONS Lot area = 14,044 sq. ft. House area = 1,861 sq. ft. Porch area = 133 sq. ft. Driveway and Sidewalk = 742 sq. ft. Impervious area 2,736 sq. ft. / 19.5% of total of lot area LOT GRADING CALCULATIONS Basement Excavation = 44 cubic yards Finished Lot Grading= 134 cubic yards Material (excess/needed)90 cubic yards needed Zoning = RS-4 FY - 20' House, 25' Garage SY - 7' Interior, 20' Corner RY - 30' SY Buffer - 30' RY Buffer - 50' The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________10/03/2022 lritchie