HomeMy WebLinkAboutSurvey 17914-16-18-20 Giants WayPlanning DepartmentApprovedDate:__________________05/23/2022 kjenson
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL
MUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________05/24/2022 lritchie