Loading...
HomeMy WebLinkAboutLA206481 - REVISED-APPROVED -Kristin Strusz - ENG CAD-min814 E 1475 N Lehi, UT 84043 m: (309) 645-0999 Solar Professional Engineering Consulting 2022.08.18 admin@lucenteng.co Everlight Solar PO Box 930550 Verona, WI 53593 RE: Engineering Services Strusz Residence 16491 Dodd Lane, Lakeville, MN 8.8 kW System Solo Job #2548182 To Whom It May Concern, A. Assumptions from Field Observation provided by Everlight Solar Roof Roof B Roof Finish :Asphalt Shingle Asphalt Shingle Roof Underlayment : OSB OSB Roof Profile : Gable Gable Roof Structural System : Metal Plate Trusses Metal Plate Trusses Truss Top Chord/Setup : 2 x 4 / Fink 2 x 4 / Fink Chord/Rafter Wood Grade : Doug-Fir #2 or better Doug-Fir #2 or better Truss/Rafter Spacing : 24'' o.c.24'' o.c. Roof Slope : 34 deg 34 deg Max Top Chord/Rafter Span : 6.62 ft 6.62 ft Bearing Wall Type : Convl Lt-Frame Constr CLFC Foundation : Permanent Concrete Permanent Concrete Stories : Two Single B. Building Design Criteria Code : 2018 IRC (ASCE 7-16)Risk Category : II Roof Live Load : 20 psf (0 psf at panels)Occupancy Class : R-3 Ground Snow Load : 50 psf Roof Dead Load : 6.5 psf Ult Wind Speed : 115 mph PV Dead Load : 3 psf Exposure Category : C Total Dead Load : 9.5 psf C. Summary of Existing Structure Results Roof - Adaquate to support the additional imposed loads. No structural upgrades are required. The following structural design regarding the proposed alterations have been prepared from these assumptions. The verification of the field observations is the responsibility of the contractor. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the sealed plans, calculations, and/or certification letter and notify the Engineer of Record of any discrepancies. After review of the field observations and based on our calculations and in accordance with the applicable building codes and current industry standards, the existing roof structure supporting the proposed alterations consisting of the solar array has been determined to be: Lucent Engineering, P.C. October 17, 2022 We have reviewed the following information regarding the solar panel installation for this project. Alterations to these documents or plans shall not be made without direct written consent of the Engineer of Record. D. Solar Panel Support Bracket Anchorage 1. 2. Manufacturer's Panel Bracket Connection to Roof Chord/Rafter Member: Fastener : (1) 5/16'' Lag Screw per Bracket NDS Withdrawl Value : 266 lbs/inch Min. Thread Length and Pentration Depth : 2.5'' 3. 4. E. Overall Summary Sincerely, Michael Leeper, PE License No. 56187 Limits of Scope of Work and Liablity Page 2 of 2 Strusz Residence The existing structure is assumed to have been designed and constructed following appropriate codes at the time of erection and assumed to have appropriated permits. The calculations performed are only for the roof framing supporting the solar array installation referenced in the stamped plans and were completed according to generally recognized structural analysis standards and procedures, professional engineering, and design experience opinions and judgements. Existing deficiencies which are unknown or were not observed during the time the site observation are not included in this scope of work. All solar panel modules, racking, and mounting equipment shall be designed and installed per the manufacturer's approved installation specifications. The Engineer of Record and the engineering consulting firm assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and/or certification letter and notify the Engineer of Record of any discrepancies prior to starting construction. If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. The contactor shall also verify that there are no damage/deficiencies (i.e., dry rot, water damage, termite damage, framing member/connection damage, etc.) to framing that was not addressed in the stamped plans, calculations, and/or certification letter and notify the Engineer of Record of any concerns prior to starting construction. Lucent Engineering, P.C.October 17, 2022 Should you have any questions regarding this letter or if you require further information, do not hesitate to contact me. Considering the existing roof's slope, size, spacing, condition, and calculated loads, the panel bracket supports shall be placed no greater than 48 in. o/c. Panel supports connections shall be staggered to distribute load to adjacent trusses. Solar panels shall be designed, mounted, and installed in accordance with the most recent ''Quickbolt Manual'', which can be found on the Quickbolt website (http://quickbolt.com). Based on the information supplied to us at the time of this report, on the evaluation of the existing structure, and solar array panel bracket connection, it is our opinion that the roof system will adequately support the additional loads imposed by the solar array. This evaluation conforms to 2018 IRC and current industry standards. 10/17/2022 Concept Approval ONLYSubject to Field Inspection Inspector Date 2020 MN Bldg Code 10/18/2022dpfannenstein Provide copy of city approved plans on the job site for the inspector Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.04 kW AC DC System Size: 8.8 kW DC Lat, 44.7104939 Long, -93.1828494999999 (22) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (11) AP Systems DS3-S Inverter(s) DATE: October 17, 2022 Dakota Electric DRAWN BY: SoloCAD COVER PAGE - PV01 1.INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM SHALL BE IN ACCORDANCE WITH NEC ARTICLE 690, AND ALL OTHER APPLICABLE NEC CODES WHERE NOTED OR EXISTING 2.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110 3.ALL WIRES, INCLUDING THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE IN ACCORDANCE WITH NEC ARTICLE 250 4.THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE; THIS SYSTEM IS UTILITY INTERACTIVE PER UL 1741 AND DOES NOT INCLUDE STORAGE BATTERIES OR OTHER ALTERNATIVE STORAGE SOURCES 5.ALL DC WIRES SHALL BE SIZED ACCORDING TO [NEC 690.8] 6.DC CONDUCTORS SHALL BE WITHIN PROTECTED RACEWAYS IN ACCORDANCE WITH [NEC 690.31] 7.ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODE PHOTOVOLTAIC (PV) SYSTEM SPECIFICATIONS AERIAL VIEW: OCCUPANCY: R-3 ZONING: RESIDENTIAL STREET VIEW: GENERAL NOTES APPLICABLE GOVERNING CODES SITE SPECIFICATIONS 2020 NATIONAL ELECTRICAL CODE 2020 MINNESOTA BUILDING CODE 2020 MINNESOTA RESIDENTIAL CODE 2020 MINNESOTA FIRE CODE EQUIPMENT: AC System Size: 7.04 kW AC DC SYSTEM SIZE: 8.8 kW DC (22) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (11) AP Systems DS3-S Inverter(s) (1) Tesla Powerwall 2 BATTERIES RACKING: Quickbolt 2 (QB2) - 48" O.C. PV01 COVER PAGE PV02 SITE PLAN PV03 ROOF ATTACHMENTS PV04 MOUNTING DETAIL PV05 LINE DIAGRAM PV06 ELECTRICAL CALCS PV07 LABELS PV08 PLACARD PV09 SITE PHOTOS SHEET INDEX: 10/17/2022 AC MSP MC JB JB PV GWBATTAC Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.04 kW AC DC System Size: 8.8 kW DC Lat, 44.7104939 Long, -93.1828494999999 (22) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (11) AP Systems DS3-S Inverter(s) Dakota Electric DATE: October 17, 2022 DRAWN BY: SoloCADVISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER SITE PLAN - PV02 ARRAY DETAILS: MOUNTING PLANE:AZIMUTH:TILT: MP1 180°34° MP2 180°34° EQUIPMENT LEGEND: INVERTERVISIBLE, LOCKABLE, LABELED AC DISCONNECT METER SOCKET (FOR UTILITY PV METER) UTILITY METER MAIN SERVICE PANEL LC LOAD CENTERC INV PV AC MSP M COMBINER BOX BATT BATTERY(IES) SUB SUB PANEL GW TESLA GATEWAY SD SERVICE DISCONNECT FIRE ACCESS PATHWAY (3' TYP)JB JUNCTION BOX PV MODULESPROPERTY LINEGPGENERATION PANEL 126'-11" 106'-2" 123'-11" 99'-10"16491 Dodd LaneMP1 MP2 FRONT OF HOME10/17/2022 AC MSP MC JB JB PV GWBATTAC EQUIPMENT INFORMATION:ROOF INFO:PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: RAIL MANUFACTURER:IronRidge ROOF TYPE:Asphalt Shingle PV MODULE COUNT:22 RAIL PART NUMBER:XR-100 ROOF FRAMING:Manufactured Truss ARRAY AREA:MODULE COUNT * 21.14 ft² = 465.08 ATTACHMENTS Quickbolt 2 (QB2)RAFTER/TOP CHORD SIZE:2x4 ROOF AREA:2250 ft² ATTACHMENT QTY:34 RAFTER/TOP CHORD SPACING:24"PERCENT OF ROOF COVERED:21% SPLICE QTY:2 ATTACHMENT SPACING:48''ARRAY WEIGHT:MODULE COUNT * 49 lbs = 1078 lbs MIDCLAMP QTY:24 POINT LOAD:ARRAY LBS/ATTACHMENTS = 31.71 ENDCLAMP QTY:16 DISTRIBUTED LOAD: (lbs/ft²) (ARRAY) WEIGHT/AREA = 2.32 lbs/ft² Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.04 kW AC DC System Size: 8.8 kW DC Lat, 44.7104939 Long, -93.1828494999999 (22) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (11) AP Systems DS3-S Inverter(s) Dakota Electric DATE: October 17, 2022 DRAWN BY: SoloCAD ROOF ATTACHMENTS - PV03 18" 36" FIRE PATHWAY ACCESS 18" 36" FIRE PATHWAY 10/17/2022 Concept Approval ONLYSubject to Field Inspection Inspector Date 2020 MN Bldg Code 10/18/2022dpfannenstein No less than 18 inch clear setback is required on both sides of a horizontal ridge, valley, or hip For each roof plane with a photo-voltaic array, a 36 inch wide pathway shall be provided from lowest roof edge to ridge on the same roof plane, on adjacent roof planes. One shall be on street/driveway side. RAIL L-FOOT/ATTACHMENT BRACKET (E) ROOF FRAMING QUICKBOLT 2 (QB2) FLASHING PV MODULE (E) COMP SHINGLE ROOF (1 LAYER) RAIL END CLAMP PV MODULE MID CLAMP PV MODULE 4" 2 12" MIN. DEPTH RAIL RAIL FLASHING & QUICKBOLT 2 (QB2) 2'-8" MIN - 3'-10" MAX 3 RAIL PV MODULE " MAX."1'-8" MAX. 21 FRONT VIEW 10" MIN - 1'-4" MAX 2'-8" MIN - 3'-10" MAX 10" MIN - 1'-4" MAX SIDE VIEW (E) RAFTER/TOP CHORDS (E) RAFTER/TOP CHORD DETAIL, MOUNTING AND FLASHING END CLAMP DETAILS MID CLAMP DETAILS 3 21 EQUIPMENT INFORMATION:ROOF INFO:PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: RAIL MANUFACTURER:IronRidge ROOF TYPE:Asphalt Shingle PV MODULE COUNT:22 RAIL PART NUMBER:XR-100 ROOF FRAMING:Manufactured Truss ARRAY AREA:MODULE COUNT * 21.14 ft² = 465.08 ATTACHMENTS Quickbolt 2 (QB2)RAFTER/TOP CHORD SIZE:2x4 ROOF AREA:2250 ft² ATTACHMENT QTY:34 RAFTER/TOP CHORD SPACING:24"PERCENT OF ROOF COVERED:21% SPLICE QTY:2 ATTACHMENT SPACING:48''ARRAY WEIGHT:MODULE COUNT * 49 lbs = 1078 lbs MIDCLAMP QTY:24 POINT LOAD:ARRAY LBS/ATTACHMENTS = 31.71 ENDCLAMP QTY:16 DISTRIBUTED LOAD: (lbs/ft²) (ARRAY) WEIGHT/AREA = 2.32 lbs/ft² Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.04 kW AC DC System Size: 8.8 kW DC Lat, 44.7104939 Long, -93.1828494999999 (22) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (11) AP Systems DS3-S Inverter(s) Dakota Electric DATE: October 17, 2022 DRAWN BY: SoloCAD MOUNTING DETAIL - PV04 10/17/2022 (E) (E)UTILITY METER 120/240 VAC TO UTILITY GRID N G (E)GROUNDING ELECTRODE (N) 70A-2P (E) 200A-2P (E) 200A MAIN SERVICE PANEL J-BOX STRING (1): 15.96 A AC, 12 MODULES STRING (2): 13.30 A AC, 10 MODULES N G 3 AC COMBINER BOX SOLAR LOADS ONLY UL 1741 COMPLIANT AC DC AC DC5 INVERTERS AC DC AC DC6 INVERTERS J-BOX (N) 100A (2) 20A-2P J-BOX1 2 1 2 UTILITY PV PRODUCTION METER BASE 4 4 (N) 40A FUSES PV AC DISCONNECT 60A FUSED, VISIBLE, LOCKABLE, LABELED, OPEN 240V, 2-POLE LINE SIDE LOAD SIDE CTRL (N) 40A-2P (N) 100A-2P (E) LOADS (E) LOADS NG 5 (N) 30A-2P (3) [10-8] AWG THWN-2(1) [10-8] AWG GND (N) POWERWALL TESLA P/N 3012170-XX-B 5KW, 13.5KWH NEMA 3R CTRL (N) 100A BACKUP LOADS PANEL N G (N) BACKUP GATEWAY TESLA P/N 1118431-XX-X 200A MAX, NEMA 3R ALSO SERVES AS PV COMBINER M 4 (N) 70A FUSES PV AC DISCONNECT 100A FUSED, VISIBLE, LOCKABLE, LABELED, OPEN 240V, 2-POLE 6 6 Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.04 kW AC DC System Size: 8.8 kW DC Lat, 44.7104939 Long, -93.1828494999999 (22) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (11) AP Systems DS3-S Inverter(s) Dakota Electric DATE: October 17, 2022 DRAWN BY: SoloCAD LINE DIAGRAM - PV05 AP Systems DS3-S Specs MAX INPUT VOLTAGE:60 V MAX DC SHORT CIRCUIT CURRENT:16 A MAXIMUM OUTPUT POWER:640 W MAXIMUM OUTPUT CURRENT:2.66 A NOM. OUTPUT VOLTAGE:240 V MAX UNITS PER 20A CIRCUIT:6 1-Phase, 60 HZ, UL 1741 Listed Hanwha Q.PEAK DUO BLK ML-G10+ 400 Specs POWER MAX (PMAX):400W OPEN CIRCUIT VOLTAGE (VOC):42.72V MAX POWER-POINT CURRENT (IMP):8.51A MAX POWER-POINT VOLTAGE (VMP):35.25V SHORT CIRCUIT CURRENT (ISC):8.97A SERIES FUSE RATING:20 A 5 (3)2 AWG THWN-2 COPPER - (L1,L2,NEUTRAL)1.25" EMT(1)8 AWG THWN-2 COPPER - (GROUND) Conduit & Conductor Schedule TAG QTY WIRE GAUGE DESCRIPTION CONDUIT SIZE 1 (2)12-2 PV-WIRE, USE-2 COPPER - (L1, L2)N/A - FREE AIR(1)6 AWG THWN-2 COPPER - (GROUND) 2 (2)10 AWG THHN/THWN-2 COPPER - (L1, L2)3/4" EMT(1)10 AWG THWN-2 COPPER - (GROUND) 3 (4)10 AWG THHN/THWN-2 (L1, L2)3/4" EMT(1)10 AWG THWN-2 COPPER -(GROUND) 4 (3)8 AWG THWN-2 COPPER - (L1, L2, NEUTRAL)3/4" EMT(1)10 AWG THWN-2 COPPER -(GROUND) 6 (3)4 AWG THWN-2 COPPER - (L1,L2,NEUTRAL)1" EMT(1)8 AWG THWN-2 COPPER - (GROUND) Equipment Schedule TYPE:QTY:DESCRIPTION:RATING: MODULES:(22)Hanwha Q.PEAK DUO BLK ML-G10+ 400 400 W INVERTERS:(11)AP Systems DS3-S 640 W AC DISCONNECTS:(1)PV AC Disconnect, 240V, 2-Pole 60 A AC DISCONNECTS:(1)PV AC Disconnect, 240V, 2-Pole 100 A ENERGY STORAGE:(1)Tesla Powerwall 2 14 kWh VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER INTERCONNECTION NOTES: 1. INTERCONNECTION SIZING, LIMITATIONS AND COMPLIANCE DETERMINED IN ACCORDANCE WITH [NEC 705.12], AND [NEC 690.64]. 2. GROUND FAULT PROTECTION IN ACCORDANCE WITH [NEC 215.9], [NEC 230.95] AND [NEC 690.5] 3. ALL EQUIPMENT TO BE RATED FOR BACKFEEDING. 4. PV BREAKER TO BE POSITIONED AT THE OPPOSITE END OF THE BUSBAR RELATIVE TO THE MAIN BREAKER. DISCONNECT NOTES 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS) 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH GROUNDING & GENERAL NOTES: 1. PV INVERTER IS UNGROUNDED, TRANSFORMER-LESS TYPE. 2. DC GEC AND AC EGC TO BE SPLICED TO EXISTING ELECTRODE 3. ANY EXISTING WIRING INVOLVED WITH PV SYSTEM CONNECTION THAT IS FOUND TO BE INADEQUATE PER CODE SHALL BE CORRECTED PRIOR TO FINAL INSPECTION. 4. JUNCTION BOX QUANTITIES, AND PLACEMENT SUBJECT TO CHANGE IN THE FIELD - JUNCTION BOXES DEPICTED ON ELECTRICAL DIAGRAM REPRESENT WIRE TYPE TRANSITIONS. 5. AC DISCONNECT NOTED IN EQUIPMENT SCHEDULE OPTIONAL IF OTHER AC DISCONNECTING MEANS IS LOCATED WITHIN 10' OF SERVICE DISCONNECT. STRING CALCULATIONS MAX AC CURRENT: MICRO INVERTERS IN SERIES NOMINAL STRING VOLTAGE: MAX AC OUTPUT POWER ARRAY DC POWER: TOTAL MAX AC CURRENT: STRING #1 15.96A 6 240V 3840.000000W 8800W 29.26A STRING #2 13.30A 5 240V 3200.000000W AP Systems DS3-S Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.04 kW AC DC System Size: 8.8 kW DC Lat, 44.7104939 Long, -93.1828494999999 (22) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (11) AP Systems DS3-S Inverter(s) Dakota Electric DATE: October 17, 2022 DRAWN BY: SoloCAD ELECTRICAL CALCS - PV06 Conduit & Conductor Schedule TAG QTY WIRE GAUGE DESCRIPTION CONDUIT SIZE CONDUCTOR RATING CONDUCTOR TEMP. RATE AMBIENT TEMP TEMP. DERATE # OF CONDUCTORS DERATE CONDUCTOR RATING W/DERATES CONDUIT FILL 1 (2)12-2 PV-WIRE, USE-2 COPPER - (L1, L2)N/A - FREE AIR 30A 90°C 31°C 0.96 N/A - FREE AIR 28.8A N/A - FREE AIR(1)6 AWG THWN-2 COPPER - (GROUND) 2 (2)10 AWG THHN/THWN-2 COPPER - (L1, L2)3/4" EMT 40A 90°C 31°C 0.96 1 38.4A 11.9%(1)10 AWG THWN-2 COPPER - (GROUND) 3 (4)10 AWG THHN/THWN-2 (L1, L2)3/4" EMT 40A 90°C 31°C 0.96 0.8 30.72A 19.8%(1)10 AWG THWN-2 COPPER -(GROUND) 4 (3)8 AWG THWN-2 COPPER - (L1, L2, NEUTRAL)3/4" EMT 50A 75°C 31°C 0.94 1 47A 24.6%(1)10 AWG THWN-2 COPPER -(GROUND) 5 (3)2 AWG THWN-2 COPPER - (L1,L2,NEUTRAL)1.25" EMT 115A 75°C 31°C 0.94 1 108.1A 25.59%(1)8 AWG THWN-2 COPPER - (GROUND) 6 (3)4 AWG THWN-2 COPPER - (L1,L2,NEUTRAL)1" EMT 85A 75°C 31°C 0.94 1 79.9A 32.93%(1)8 AWG THWN-2 COPPER - (GROUND) 75°C 75°C SYSTEM OCPD CALCULATIONS INVERTER MODEL(S):AP Systems DS3-S # OF INVERTERS:11 MAX OUTPUT CURRENT:2.66A (# OF INVERTERS) X (MAX OUTPUT CURRENT) X 125% + (BATTERY ADDITION) <= OCPD RATING (11 X 2.66A X 1.25) = 36.575A + 30A <= 70A, OK SUM OF ALL BREAKERS (NEC 705.12(B)(2)(3)(c)) MAIN BUSBAR RATING:200A MAIN DISCONNECT RATING:200A PV OCPD RATING:70A SERVICE RATING >= PV OCPD 200A >= 70A, OK NUMBER OF CURRENT CARRYING CONDUCTORS PERCENT OF VALUES 4-6 .80 7-9 .70 10-20 .50 Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.04 kW AC DC System Size: 8.8 kW DC Lat, 44.7104939 Long, -93.1828494999999 (22) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (11) AP Systems DS3-S Inverter(s) Dakota Electric DATE: October 17, 2022 DRAWN BY: SoloCAD LABELS - PV07 LABEL 6 MARKED AT AC DISCONNECTING MEANS. [NEC 690.54] LABEL 5 EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL SOURCES.[NEC 705.12(B)(2)(3)(c)] LABEL 3 PLACED ADJACENT TO THE BACK-FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(B)(2)(3)(c)] LABEL 7 AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 690.31(D)(2)] LABEL 9 SIGN LOCATED ON OR NO MORE THAN 3FT FROM INITIATION DEVICE [NEC 690.56(C)(2)]. LABEL 8 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(A)] LABEL 1 PLACED ON THE MAIN DISCONNECTING MEANS FOR THE PV SYSTEM. [NEC 690.13(B)] LABELING NOTES: 1.LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2.LABELING REQUIREMENTS BASED ON THE 2020 NATIONAL ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI Z535. 3.MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 4.LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC 110.21] 5.LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND; REFLECTIVE, AND PERMANENTLY AFFIXED [IFC 605.11.1.1] LABEL 4 PLACED ON EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES [NEC 705.10(C)] LABEL 2 FOR PV DISCONNECTING MEANS WHERE THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(B)] WARNING! TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION !WARNING THIS EQUIPMENT IS FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. PHOTOVOLTAIC AC DISCONNECT RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: ELECTRIC SHOCK HAZARD MAIN PHOTOVOLTAIC SYSTEM DISCONNECT WARNING! POWER SOURCE OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE. WARNING!DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM PHOTOVOLTAIC POWER SOURCE TURN RAPID SHUTDOWN SWICH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM 29 240 EXISTING SUB PANEL (ONLY IF WHERE POINT OF INTERCONNECTION IS MADE) **ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ELECTRICAL DIAGRAM PAGE. ** JUNCTION BOX MAIN SERVICE PANEL AC DISCONNECT PV COMBINER SUBPANEL - IF USED TO COMBINE PV OUTPUT CIRCUITS OR INVERTER (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) LABELING DIAGRAM: 1 2 3 4 8 5 2 3 4 5 116 3 9 1 7 7 WARNING:THIS EQUIPMENT FED BY MULTIPLE POWER SOURCES. TOTAL RATING OF ALL OVER CURRENT DEVICES EXCLUDING MAIN SUPPLY OVER CURRENT DEVICE SHALL NOT EXCEED AMPACITY OF BUSBAR NEC 705.12 (B)(2)(3)(b) SIGN TO BE LOCATED ADJACENT TO BACK FED BREAKER FROM THE POWER SOURCE. AC MSP MC JB JB PV GWBATTAC Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.04 kW AC DC System Size: 8.8 kW DC Lat, 44.7104939 Long, -93.1828494999999 (22) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (11) AP Systems DS3-S Inverter(s) Dakota Electric DATE: October 17, 2022 DRAWN BY: SoloCAD POWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLAR ARRAYS WITH SAFETY DISCONNECTS AS SHOWN: CAUTION DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM. (ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS OUTLINED WITHIN: NEC 690.56(B)&(C), [NEC 705.10]) 16491 Dodd Lane, Lakeville MN 55024 PLACARD - PV08 SYSTEM UTILIZES MICROINVERTERS LOCATED UNDER EACH MODULE FRONT OF HOMEMAIN DISTRIBUTION UTILITY DISCONNECT RAPID SHUTDOWN AC DISCONNECT SWITCH COMBINER PV ARRAY BATTERY(IES) TESLA GATEWAY RAPID SHUTDOWN AC DISCONNECT SWITCH Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.04 kW AC DC System Size: 8.8 kW DC Lat, 44.7104939 Long, -93.1828494999999 (22) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (11) AP Systems DS3-S Inverter(s) Dakota Electric DATE: October 17, 2022 DRAWN BY: SoloCAD SITE PHOTOS: SITE PHOTOS - PV09 Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.68 kW AC DC System Size: 9.6 kW DC Lat, 44.7104939 Long, -93.1828494999999 (24) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (12) AP Systems DS3-S Inverter(s) Dakota Electric DATE: September 2, 2022 DRAWN BY: SoloCAD SITE PHOTOS: FRONT/BACK VIEWS - PV09.1 Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.68 kW AC DC System Size: 9.6 kW DC Lat, 44.7104939 Long, -93.1828494999999 (24) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (12) AP Systems DS3-S Inverter(s) Dakota Electric DATE: September 2, 2022 DRAWN BY: SoloCAD SITE PHOTOS: SIDE VIEWS - PV09.2 Everlight Solar Construction PO Box 930550 Verona, WI 53593 License# DCQ-111802116 833.786.4387 ext. 701 CONTRACTOR INFORMATION: Everlight Solar Construction 7369 Highway 13 W. Savage, MN 55378 License #: BCC771658 (833) 786-4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Kristin Strusz 16491 Dodd Lane Lakeville, MN 55024 AC System Size: 7.68 kW AC DC System Size: 9.6 kW DC Lat, 44.7104939 Long, -93.1828494999999 (24) Hanwha Q.PEAK DUO BLK ML-G10+ 400 PV Modules (12) AP Systems DS3-S Inverter(s) Dakota Electric DATE: September 2, 2022 DRAWN BY: SoloCAD SITE PHOTOS: METER/OPEN MSP - PV09.3 Tech Brief:PTWSPÄLK.YV\UKPUNMVY,]LY`(WWSPJH[PVUThe UFO family of components eliminates the need for separate grounding hardware by bonding solar modules directly to IronRidge XR Rails. All system types that feature the UFO family—Flush Mount, Tilt Mount and Ground Mount—are fully listed to the UL 2703 standard.UFO hardware forms secure electrical bonds with both the module and the rail, resulting in many parallel grounding paths throughout the system. This leads to safer and more reliable installations.UFO Family of Components<UP]LYZHS-HZ[LUPUN6IQLJ[<-6The UFO securely bonds solar modules to XR Rails. It comes assembled and lubricated, and FDQÀWDZLGHUDQJHRIPRGXOHKHLJKWVhe gore<UP]LYZHS-HZ[LThe UFO securely bRails. It comes asseFDQÀWDZLGHUDQJH:[VWWLY:SLL]LThe Stopper Sleeve snaps onto the UFO, converting it into a bonded end clamp.)6::™ SpliceBonded Structural Splice connects rails with built-in bonding teeth. No tools or hardware needed.)VUKLK([[HJOTLU[ZThe bonding bolt attaches and bonds the L-foot to the rail. It is installed with the same socket as the rest of the system..YV\UKPUN3\NA single Grounding Lug connects an entire row of PV modules to the grounding conductor.)6::™ SpliceBonded Structural Splice il i h b il i:`Z[LT+PHNYHT<3*LY[PÄJH[PVUThe IronRidge Flush Mount, Tilt Mount, and Ground Mount Systems have been listed to UL 2703 by Intertek Group plc.UL 2703 is the standard for evaluating solar mounting systems. It ensures these devices will maintain strong electrical and mechanical connections over an extended period of time in extreme outdoor environments.0YVU9PKNL0UJ(SSYPNO[ZYLZLY]LK=PZP[^^^PYWH[LU[ZJVTMVYWH[LU[PUMVYTH[PVU=LYZPVUTech Brief*YVZZ:`Z[LT*VTWH[PIPSP[`-LH[\YL -S\ZO4V\U[ ;PS[4V\U[ .YV\UK4V\U[XR Rails((XR100 & XR1000UFO/Stopper(((BOSS™ Splice((N/AGrounding Lugs1 per Row 1 per Row 1 per ArrayMicroinverters & Power OptimizersCompatible with most MLPE manufacturers.Refer to system installation manual.Fire RatingClass A Class A N/AModulesTested or Evaluated with over 400 Framed ModulesRefer to installation manuals for a detailed list.íApproved Enphase microinverters can provide equipment grounding of IronRidge systems, eliminating the need for JURXQGLQJOXJVDQGÀHOGLQVWDOOHGHTXLSPHQWJURXQGFRQGXFWRUV (*& $PLQLPXPRIWZRPLFURLQYHUWHUVPRXQWHGWRWKHsame rail and connected to the same Engage cable is required. Refer to installation manuals for additional details..V[V0YVU9PKNLJVT<-6