Loading...
HomeMy WebLinkAboutSurvey-18167-71-75-79-83-87 Gavel LnRevisions:1.) 02-21-22 Stake housec Pioneer Engineering Certificate of Survey for: 2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914 www.pioneereng.comFax: (651) 681-9488 Project # :Folder #:Drawn by: CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS 221 River Ridge Circle South, Suite 100 Burnsville, MN 55337 Phone: (952) 898-0230 Brandl Anderson Homes IncThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________03/17/2022lritchiePlanning DepartmentApprovedDate:__________________03/18/2022kjenson