Loading...
HomeMy WebLinkAbout8188 186th Street W-SurveyPlanning DepartmentApprovedDate:__________________10/20/2022 dmorey ENGINEERING REVIEWED Date:__________________10/25/2022 lritchie The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements.