Loading...
HomeMy WebLinkAbout18584 Hamel Dr SurveyPlanning DepartmentApprovedDate:__________________10/20/2022 dmorey ENGINEERING REVIEWED Date:__________________10/25/2022 lritchie The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.