HomeMy WebLinkAboutLA208343-APPROVED - REVISED - Gribble - Site MapOn Exterior of Home
20 1 Utility Bi-Meter
10 2 Production Mater
3 Utility AC Disconnect
4 Combiner Panel
NTS
Jinko Solar JKM410M-72HL-V
Altenergy Power Systems DS3-S [240V]
The array covers more than 33% of the roof space thus there is a 36" walkway and 36" clearance from the horizontal peak.
No clearance issue, 24hr keyless/unescorted access to disconnects and meters.
The production meter and AC Disconnect should be located together in a readily accessible, visible, lockable, location within 10' of the main
service meter.
The array occupies less than 33% of total roof space and allows for 18" from edges and horizontal peak of dwelling.
The 33% rule does not apply do to this not being a dwelling
Site Plan
Page:
1 of 1
Winona Renewable Energy
7010 US Hwy 61
Minnesota City, MN 55959
507-312-0190
Customer Name and Address
George Gribble
5202 175th Street West
Lakeville, MN, 55044
Application #Date
11/16/2022
Description:
Concept Approval ONLY
Subject to Field Inspection
Inspector Date
2020
MN Bldg
Code
11/17/2022dpfannenstein
For each roof plane with a photo-voltaic
array, a 36 inch wide pathway shall be
provided from lowest roof edge to ridge on
the same roof plane, on adjacent roof planes.
One shall be on street/driveway side.
No less than 18 inch clear
setback is required on both
sides of a horizontal ridge,
valley, or hip