Loading...
HomeMy WebLinkAboutLA208343-APPROVED - REVISED - Gribble - Site MapOn Exterior of Home 20 1 Utility Bi-Meter 10 2 Production Mater 3 Utility AC Disconnect 4 Combiner Panel NTS Jinko Solar JKM410M-72HL-V Altenergy Power Systems DS3-S [240V] The array covers more than 33% of the roof space thus there is a 36" walkway and 36" clearance from the horizontal peak. No clearance issue, 24hr keyless/unescorted access to disconnects and meters. The production meter and AC Disconnect should be located together in a readily accessible, visible, lockable, location within 10' of the main service meter. The array occupies less than 33% of total roof space and allows for 18" from edges and horizontal peak of dwelling. The 33% rule does not apply do to this not being a dwelling Site Plan Page: 1 of 1 Winona Renewable Energy 7010 US Hwy 61 Minnesota City, MN 55959 507-312-0190 Customer Name and Address George Gribble 5202 175th Street West Lakeville, MN, 55044 Application #Date 11/16/2022 Description: Concept Approval ONLY Subject to Field Inspection Inspector Date 2020 MN Bldg Code 11/17/2022dpfannenstein For each roof plane with a photo-voltaic array, a 36 inch wide pathway shall be provided from lowest roof edge to ridge on the same roof plane, on adjacent roof planes. One shall be on street/driveway side. No less than 18 inch clear setback is required on both sides of a horizontal ridge, valley, or hip