Loading...
HomeMy WebLinkAbout18619 Hamel Dr SurveyPlanning DepartmentApprovedDate:__________________11/03/2022 dmorey The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________11/10/2022 lritchie