Loading...
HomeMy WebLinkAbout17874 Hamburg Avenue SurveyPlanning DepartmentApprovedDate:__________________05/05/2022 kjenson The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________05/12/2022 lritchie