Loading...
HomeMy WebLinkAboutLA208913-APPROVED - Thomas Fisher - Roof EvaluationSTRUCTURAL CERTIFICATION REPORT Roof-mounted Solar Panels December 16, 2022 To: Powerfully Green Re: Thomas Fisher 2010 E Hennepin Ave.17452 Iceland Trail Minneapolis, MN 55413 Lakeville, MN 55044 Powerfully Green proposes to install new roof-mounted solar panels at this residence and asked Right Angle Engineering to review the existing structure for suitability. This letter summarizes the methods that were used to survey, evaluate, and certify the existing roof framing and the attachment of the new solar panels to it. Pictures and calculations are available on request. STRUCTURAL DESIGN Building Code:International Residential Code 2018 Design Standards:ASCE 7-16 Snow:Ground: pg= 50.0 psf | Flat Roof: pf= 34.65 psf | Sloped Roof: ps= 30.03 psf Wind:Ultimate Wind Speed = 115.0 mph | Exposure = C Seismic:Risk Category = 2 | Seismic Design Category = A | Site Class = D STRUCTURE Field Technicians from Powerfully Green visited the site and observed the existing structure : Array Name Panel Quantity Roof Framing Material Pitch Array 1 3 2x4 Truss DF#2 | 24" o.c.Asphalt Shingles 18 Array 2 15 2x4 Truss DF#2 | 24" o.c.Asphalt Shingles 18 Array 3 10 2x4 Truss DF#2 | 24" o.c.Asphalt Shingles 18 ANCHORAGE The solar panel anchorage shall be installed according to the manufacturer's most current installation manual. Anchorage shall be staggered to distribute the load evenly to adjacent roof members. The solar panels should be mounted flush to the roof surface. Array Name Connection Type Fastener Max Anchorage Spacing Array 1 Sunmodo NanoMount with (4) #14 roof screws into 3/4 inch OSB (4) Self-tapping screws, #14x3.00 (0.5" embedment) into roof substructure 34" Array 2 Sunmodo NanoMount with (4) #14 roof screws into 3/4 inch OSB (4) Self-tapping screws, #14x3.00 (0.5" embedment) into roof substructure 34" Array 3 Sunmodo NanoMount with (4) #14 roof screws into 3/4 inch OSB (4) Self-tapping screws, #14x3.00 (0.5" embedment) into roof substructure 34" Installation Instructions Solar panels and the equipment shall be installed per the manufacturer's installation specifications. Improper installation will void this certification. Deviations from the approved structural plans (including equipment substitutions) are not allowed without written approval from Right Angle Engineering. Prior to installation, the installer should: •Confirm that the existing structure matches the information provided in the structural survey, the approved installation plans and this certification. •Identify discrepancies between this certification and the approved installation plans. If found, then this certification shall govern. •Identify structural elements that are dangerous (cracked, broken, excessive sag, signs of overstress, rot,decay, fire, water). If found, installation shall cease until those elements are adequately abated and made to comply with the referenced building code. •Provide fire setbacks and access pathways as required by local ordinances 581 E Technology Ave, C1500 | Orem, UT 84097 | 925-787-3067 | www.rightangleeng.com | Page 1 of 2 STRUCTURAL CERTIFICATION I certify the addition of solar panels on the roof of this structure does not cause the structure to become unsafe or make it generally less compliant with the life-safety requirements of the referenced building code. Based on the evaluation methods described below, for the loads that exist at this site, the existing framing should safely support the new solar panels if they are installed and attached correctly. Electrical design is not included in this certification. Array Name Certification Method Retrofits Array 1 Stress analysis International Residential code None required Array 2 Stress analysis International Residential code None required Array 3 Stress analysis International Residential code None required Regards, 12/16/2022 Robert D. Smythe, P.E. Right Angle Engineering 581 E Technology Ave, C1500 | Orem, UT 84097 | 925-787-3067 | www.rightangleeng.com | Page 2 of 2 Concept Approval ONLYSubject to Field Inspection Inspector Date 2020 MN Bldg Code 12/16/2022dpfannenstein Please provide a copy of the City Approved plans on site at final inspection.