Loading...
HomeMy WebLinkAbout18835 Ivorra Ave SurveyZoning = RS-3 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________01/04/2023 lritchie Soils Engineer required to verify soils after footing excavation, including compaction testing to verify 2000 psf minimum in northern area of home off the corrected pad. Tree Pres. 1/9/23 trees #207 & 208 removed EA