HomeMy WebLinkAbout18835 Ivorra Ave SurveyZoning = RS-3
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the
landscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROL
MUST BE INSTALLED
BEFORE EXCAVATION
ENGINEERING REVIEWED
Date:__________________01/04/2023 lritchie
Soils Engineer required to verify soils after
footing excavation, including compaction
testing to verify 2000 psf minimum in northern
area of home off the corrected pad.
Tree Pres.
1/9/23
trees #207 & 208 removed
EA