Loading...
HomeMy WebLinkAbout17955 Headwaters Drive-SURVEY 010923Zoning = RS-4 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________12/22/2022 lritchie Revision Approved 1/24/23