Loading...
HomeMy WebLinkAbout8092 186th Street SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________01/12/2023 lritchie Planning DepartmentApprovedDate:__________________01/17/2023 dmorey