Loading...
HomeMy WebLinkAbout20300 Gateway Dr-SurveyLOT 2 Drainage and Utility Easement per the plat of CEDAR HILLS 3RD ADDITION Building Pad per Grading Plan Building Setback 8 Proposed House Springfield EN06, Elev. G3 Walkout Lowest Floor Elev. = (1027.83) 17 1 8 G A T EW A Y D R I V E SAN SAN SAN SAN SAN SANSANS A N SANSAN S T O ST O ST O ST O S T O ST O STO WA T WA T WA T WAT WAT WA T WA T WATWA T WATWAT WATSTO17 1 8 L= 1 0 7 . 6 5 R = 2 5 0 . 0 0 Δ = 2 4 ° 4 0 ' 1 6 " N51° 5 5' 3 5"E 1 4 7. 0 1N27°15'19"E 140.794 5 . 7 4N4 2 ° 4 6 ' 3 2 "W26.491 4 . 6 8 57.29 19. 6 2 Garage Porch Morning Room 36. 4 1 14 . 8 8 22.127.130.1 2 15. 0 0 20 . 0 0 17.756.1910. 5 0 29.873.7 5 10.0017 . 0 010.0019. 0 029.505. 1 2 20.5010 . 0 0 2.0020 . 0 9 15. 0 2 (1019.5) 1019.6 (1020.4) 1021.9 (1034.1) 1033.4 (1031.7) 1031.4 1026.93 1032.85 1033.40 1028.54 SidewalkX 1031.33 T C X 1030.94TCX 1032.38TCX 103 4. 0 0 T C 74.86 72.1 566.0453.2521.51T CO CS E CO T CO CO CS X 103 3. 3 2 T C 1032.9 X1032.7 X 1027.4 XX 1027.4 60 . 0 0 f o o t P u b l i c R i g h t o f W a y S S Pr o p o s e d S i d e w a l k Drain Tile Drainage and Utility Easement Over all of Outlot C per the plat of CEDAR HILLS 2ND ADDITION X (10 3 4. 8) 16 6 9 1 0 . 1 5 N 52 7 2 3 2 . 4 1 E 1 6 6 8 7 4 . 0 0 N 5 2 7 2 4 7 . 4 8 E 20 . 9 16 . 0 X (1032.5) (1 0 3 5 . 5 0 )(7.6%) (1027.2 ) X (1027.2) X (1026.7) X (1026.7) X 10 5 5 5 5 1010101 0 3 4103610341032 1030 102810 2 6 10 2 4 1 0 2 2 1028103010321032N:\0025850.01\DWG\SURVEY\3RD ADD\0025850.01B08L02 3RD.DWG1 1 12/15/2022 MJW BTW SHEET NUMBER: DATE: OF .FIELD CREW: DRAWN: CHECKED: Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Œ:HVWZRRG3URIHVVLRQDO6HUYLFHV,QF Common Ground Alliance Call 48 Hours before digging: 811 or call811.com Lakeville, Minnesota Cedar Hills Certificate of SurveyLennar PROJECT NUMBER: 0025850.01 0'20'40' 1) Curb & gutter and utilities are existing. 2) Building dimensions do not reflect brick facing. 3) Grading Plan by Westwood Professional Services Inc. initial submittal date 02/06/20. 4) Building shown reflects Springfield foundation plan, sheet A2, dated 12/01/2022. Lot 2, Block 8, CEDAR HILLS 3RD ADDITION, according to the recorded plat thereof, Dakota County, Minnesota. Address- 20300 Gateway Drive LEGEND CABLE TV BOXTV NATURAL GAS METERG STREET LIGHT ELECTRIC BOXE ELECTRIC METERE SANITARY MANHOLES SEWER CLEANOUTCO CATCH BASIN STORM MANHOLEST TELEPHONE BOXT GATE VALVE HYDRANT WATER METERW CURB STOP BOXCS WATERMAIN SANITARY SEWER STORM SEWER SAN STO WAT FLARED END SECTION Garage Floor Elev. = (1035.50)(at overhead door) Top of Poured Foundation Wall Elev. = (1035.83) Lowest Floor Elev. = (1027.83) I hereby certify that this survey was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. 01/10/2023 Mathew J. Welinski Date Minnesota License No. 53596 matt.welinski@westwoodps.com Denotes iron monument foun Denotes iron monument set x xxx.x Denotes existing elevatio x (xxx.xx) Denotes proposed eleva Benchmark- Minnesota Department of Transportation Control Point "1914 H", Elevation = 959.11 (N.A.V.D. 1988), not graphically shown. IMPERVIOUS SURFACE CALCULATIONS Lot area = 11,109 sq. ft. House area = 2,013 sq. ft. Porch area = 97 sq. ft. Driveway and Sidewalk = 789 sq. ft. Impervious area 2,899 sq. ft. / 26.1% of total of lot area LOT GRADING CALCULATIONS Basement Excavation = 69 cubic yards Finished Lot Grading= 141 cubic yards Material (excess/needed)+72 cubic yards needed Zoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' Corner RY - 30'SY Buffer - 30'RY Buffer - 50'The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________01/24/2023 lritchie