Loading...
HomeMy WebLinkAbout18129 Hinckley Ave-SurveyPORCH>>HINCKLEY AVENUE25 I I I >>>>>>>>> > > > >>>>>>>IIIIIIII>>>Building Setback Drainage and Utility Easement PROPOSED DRIVEWAY 5.8% SLOPE HIDEAWAY TRAIL PROPOSED HOUSE PROPOSED GARAGE11.0022.9811.0024.00510 N00°46'19"W 80.50N89°13'41"E 130.00 S89°02'08"W 62.87L=67.35 R=467.00Δ=8°15'46"S00°46'19"E 84.921510 30 20257 Planned Sidewalk 59 1039.97 1040. 5 5 1040. 3 0 N:177643.68 E:520303.25 1040. 6 3 1040. 8 4 1040. 9 4 1041.41 EX CB RIM=1042.51 1044. 2 4 EX SAN MH RIM=1045.36 1046. 5 7 1046. 0 9 1 0 4 1 . 4 0 1042. 0 2 RIM=1041.48 EX SAN MH IIIIIIII10 4 6 10 4 5 104 4 1 0 4 3 1042104210411040 10411045 1040 10411042 1043 1043.301043.1 0 10 4 3 . 1 8 104 3 . 3 0 104 3 . 2 0 10 4 3 . 0 71043.0710 4 2 . 6 0 1042.601043.081041.87 1041.5810 4 1 . 7 51040.851039.631041.811046.911041.731043.081042.40 1042.8 8111040 1043 1044 1046 28>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>N:177656.72 E:520290.29 Drain Tile Cleanout 25.5 29.510.06.0 9.82.0 6.05.544.0012.006.00 12.462.00 20.0042.00 48.0023.54 22.462.00104 21043104210411042 10421042. 8 4 1 0 4 4 . 4 8 1039. 9 1 1040. 3 1 2225303 L25B5 DATE REVISION SCHEDULE DESCRIPTION BY PROJECT NO. CAD FILE NAME DRAWN BY DESIGNED BY ORIGINAL ISSUE DATE CLIENT PROJECT NO. REVIEWED BY PROJECT SHEET TITLE WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,FILE LOCATION: S:\PROJECTS\25000 PROJ\25300-25399\25303 STREEFLAND PROPERTY - LENNAR - LAKEVILLE MN\25303 CIVIL-SURVEY\SURVEY PRODUCTION DRAWINGS\LOT CERTS\BLOCK 5\LOT 25\25303 L25B5.DWG 1OF CERTIFICATE OF SURVEY 1 - 21-25303 11/30/22 LAKEVILLE MINNESOTA LENNAR CORPORATION CASLANO LOT 25, BLOCK 5 JW --- --- I HEREBY CERTIFY THAT THIS SURVEY, PLAN, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE LIC. NO.11/30/22 45817 MARK A. SCHWANZ 0 SCALE IN FEET 10 20 LEGEND Proposed Building Sanitary Line Water Line Storm Line Curb Stop Fire Hydrant Water Valve Manhole/Catch Basin > >> I CONSTRUCTION NOTES: 1.Install rock construction entrance. 2.Install silt fence as needed for erosion. 3.Sidewalks shall drain away from house a minimum of 1%. 4.Contractor must verify driveway design. 5.Contractor must verify service elevation prior to construction. 6.Add or remove foundation ledge as required. GENERAL NOTES: 1.Grading plan by ISG last dated May 9, 2022 was used to determine proposed elevations shown hereon. 2.This survey does not purport to show improvements or encroachments, except as shown, as surveyed by ISG or under my direct supervision. 3.Proposed building dimensions shown are for horizontal location of structures on the lot only. Contact builder prior to construction for approved construction plans. 4.No specific soil investigation has been performed on this lot by the surveyor. The suitability of soils to support the specific house proposed is not the responsibility of the surveyor. 5.If building footprint exceeds the building pad, additional earthwork and testing will be required to meet the requirements as outlined within the geotechnical report. 6.This certificate does not purport to show easements other than those shown on the recorded plat. 7.Bearings shown are based on the Final Plat. 8.Site address is 18129 Hinckley Avenue, Lakeville, MN 55044 9.House/Basement type: Summit EH07 A3 - Left - Full 10.Building dimensions shown are based on First Floor Plan. 11.Proposed Contours are shown hereon. 12.Topographic survey was completed on November 22, 2022. BENCHMARK: Top nut fire hydrant located in the NE quadrant of Hideaway Trail and Highview Avenue Elevation = 1038.03 feet AREA TABLE: House/Garage Area =2,136 sq. ft. Porch Area = 156 sq. ft. Driveway/Walk Area = 900 sq. ft. Total Impervious Area = 3,192 sq. ft. Lot Area = 10,959 sq.ft. Impervious Coverage = 29.1% HOUSE ELEVATIONS:Proposed/As-Built Garage Floor = 1043.30 Top of Foundation = 1043.60 Lowest Floor = 1035.60 Set Lath at Property Corner Offset Iron Existing Contour Proposed Contour Proposed Elevation Proposed Spot Elevation Existing Spot Elevation Surface Drainage Direction Proposed Tree/Shrub 982.2 982 982. 5 985.0 5 AA GA QB QE UP 12/14/22 City Comments JW 1/18/23 House Type Changed JW GRADING QUANTITIES (CY) Common Cut -326 Common Fill 389 Total (±)63 Note: Cut and fill quantities include building excavation, driveway, and lot grading. 1/19/23 House Re-Stake JW The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________02/01/2023 lritchie