Loading...
HomeMy WebLinkAbout18089 Hinckley Ave SurveyIIIII I I I I IIIIIIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>HINCKLEY AVENUE20 Drainage and Utility Easement 40.0034.00 8.00 10.4622.0022.4610.0021.54 17.542.00 Building Setback Drain Tile Cleanout N:178016.21 E:520283.90 E U UN89°13'41"E 130.00 N00°46'19"W72.05S89°13'41"W 130.00 S00°46'19"E72.0510.0021.54 11.0311.0311.0311.0328.001029.3710 3 0 . 2 3 N:178000.90 E:520297.24 10 3 1 . 3 71030.271030.83 1029.70 1031. 4 5 1030. 4 7 1029. 8 4 PROPOSED HOUSE PROPOSED GARAGE PROPOSED DRIVEWAY 6.9% SLOPE 30 7725105 510 252525.5 60.51029.501030.301031.741031.301032.731031.321033.001033.201033.011033.191031.8610 3 3 . 0 0 1033.0 01030.5210311032 103210331031 1030 10311031 1032 10311031 103010291029 1 0 3 0 10321 0 3 1 1033103110301031103210331034 1031.971031. 3 2 6.968.00 25303 L20B5 DATE REVISION SCHEDULE DESCRIPTION BY PROJECT NO. CAD FILE NAME DRAWN BY DESIGNED BY ORIGINAL ISSUE DATE CLIENT PROJECT NO. REVIEWED BY PROJECT SHEET TITLE WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,FILE LOCATION: S:\PROJECTS\25000 PROJ\25300-25399\25303 STREEFLAND PROPERTY - LENNAR - LAKEVILLE MN\25303 CIVIL-SURVEY\SURVEY PRODUCTION DRAWINGS\LOT CERTS\BLOCK 5\LOT 20\25303 L20B5.DWG 1## CERTIFICATE OF SURVEY # - 21-25303 1/23/23 LAKEVILLE MINNESOTA JW - MAS LENNAR CORPORATION CASLANO LOT 20, BLOCK 5 CONSTRUCTION NOTES: 1.Install rock construction entrance. 2.Install silt fence as needed for erosion. 3.Sidewalks shall drain away from house a minimum of 1%. 4.Contractor must verify driveway design. 5.Contractor must verify service elevation prior to construction. 6.Add or remove foundation ledge as required. GENERAL NOTES: 1.Grading plan by ISG last dated May 9, 2022 was used to determine proposed elevations shown hereon. 2.This survey does not purport to show improvements or encroachments, except as shown, as surveyed by ISG or under my direct supervision. 3.Proposed building dimensions shown are for horizontal location of structures on the lot only. Contact builder prior to construction for approved construction plans. 4.No specific soil investigation has been performed on this lot by the surveyor. The suitability of soils to support the specific house proposed is not the responsibility of the surveyor. 5.If building footprint exceeds the building pad, additional earthwork and testing will be required to meet the requirements as outlined within the geotechnical report. 6.This certificate does not purport to show easements other than those shown on the recorded plat. 7.Bearings shown are based on the Final Plat. 8.Site address is 18089 Hinckley Avenue, Lakeville, MN 55044 9.House/Basement type: Sinclair EH01 A3 - Left - Full 10.Building dimensions shown are based on First Floor Plan. 11.Proposed Contours are shown hereon. 12.Topographic survey was completed on January 19, 2023. BENCHMARK: Top nut fire hydrant located in the NE quadrant of Hideaway Trail and Highview Avenue. Elevation = 1038.03 feet AREA TABLE: House/Garage Area = 1,788 sq. ft. Porch Area = 56 sq. ft. Driveway/Walk Area = 817 sq. ft. Total Impervious Area = 2,661 sq. ft. Lot Area = 9,366 sq.ft. Impervious Coverage = 28.4% HOUSE ELEVATIONS:Proposed/As-Built Garage Floor = 1033.2 Top of Foundation = 1033.5 Lowest Floor = 1025.5 Lowest Opening = 1033.5 I HEREBY CERTIFY THAT THIS SURVEY, PLAN, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE LIC. NO.1/23/2023 45817 MARK A. SCHWANZ LEGEND Proposed Building Sanitary Line Water Line Storm Line Curb Stop Fire Hydrant Water Valve Manhole/Catch Basin > >> I Set Lath at Property Corner Offset Iron Existing Contour Proposed Contour Proposed Elevation Proposed Spot Elevation Existing Spot Elevation Surface Drainage Direction Proposed Tree/Shrub 982.2 982 982. 5 985.0 5 AA CO GT QB UP GRADING QUANTITIES (CY) Common Cut -234 Common Fill 413 Total (±)179 Note: Cut and fill quantities include building excavation, driveway, and lot grading. Zoning = RS-4 FY - 20' House, 25' Garage SY - 7' Interior, 20' Corner RY - 30' SY Buffer - 30' RY Buffer - 50' The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________02/08/2023 lritchie