Loading...
HomeMy WebLinkAbout8116 186th Street-SurveyPlanning DepartmentApprovedDate:__________________02/16/2023 dmorey The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Draintile connection required. ENGINEERING REVIEWED Date:__________________02/17/2023 asobottka