HomeMy WebLinkAbout8141 186th St W SurveyPlanning DepartmentApprovedDate:__________________02/16/2023 dmorey
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________02/17/2023 asobottka