Loading...
HomeMy WebLinkAbout17929 Hidden Creek Tr-SurveyZoning = RS-4The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Draintile connection required.ENGINEERING REVIEWEDDate:__________________02/24/2023asobottka