Loading...
HomeMy WebLinkAbout17941 Gresford Lane SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________05/19/2022 lritchie Planning DepartmentApprovedDate:__________________05/20/2022 kjenson