Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA210075 Revised APPROVED - Holt Permit Pack Flat - REVISED
1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:Nathan Holt20213 Glenbrook PathLakeville Minnesota 55044AC SYSTEM SIZE: 4.06 kW ACDC SYSTEM SIZE: 5.6 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Eric Thomas March 4, 2023 715039 A CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 COVER SHEET PV1 GENERAL NOTES CODE AND STANDARDS SITE NOTES / OSHA REGULATION SOLAR CONTRACTOR EQUIPMENT LOCATIONS AERIAL VIEW DESIGN CRITERIA WIND SPEED:115 mph GROUND SNOW LOAD:50 lb/ft² WIND EXPOSURE FACTOR:C SEISMIC DESIGN CATEGORY:B SITE SPECIFICATIONS CONSTRUCTION - V-B ZONING: RESIDENTIAL SHEET INDEX PV1 - COVER SHEET PV2 - SITE PLAN PV3 - ROOF PLAN PV4 - STRUCTURAL PV5 - ELECTRICAL 3-LINE DIAGRAM PV6 - ELECTRICAL CALCULATIONS PV7 - WARNING LABELS AND LOCATIONS (ALL OTHER SHEETS AS REQUIRED) SS - PRODUCT SPEC. SHEETS UTILITY COMPANY: Dakota Electric Association PERMIT ISSUER: City of Lakeville PROJECT INFORMATION: NUMBER OF STORIES:2 CONDUIT RUN:Interior ECOBEE QTY:0 LIGHT BULB QTY:0 PV METER:Utility PV Meter Required ROOF TYPE (1) INFORMATION: ROOF TYPE:Comp Shingle FRAMING TYPE:Manufactured Truss SHEATHING TYPE:OSB ATTACHMENT:SFM Infinity Flashkit RACKING:Unirac SFM Infinity @ 24" OC Portrait / 48" OC Landscape NUMBER OF ATTACHMENTS:32 ROOF TYPE (2) INFORMATION (IF APPLICABLE): *SEE PV4.2 SCOPE OF WORK INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM AND ANY NECESSARY ADDITIONAL WORK NEEDED FOR INSTALLATION. SYSTEM TO BE INSTALLED INFORMATION: DC SYSTEM SIZE:5.6 kW DC AC SYSTEM SIZE:4.06 kW AC MODULE TYPE: (14) URE FBM400MFG-BB INVERTER TYPE:Enphase IQ8PLUS-72-2-US MONITORING:Enphase IQ Combiner 4 X-IQ-AM1-240-4 A Sealed For Existing Roof & Attachment Only I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that I am aduly Licensed Professional Engineer under the laws of theState of Minnesota.John A. Calvert, License No. 52823Expiration Date: 30-June-2024 3/6/23 Digitally signed by John A. Calvert Date: 2023.03.06 09:55:45 -07'00' DCACDCACDCACDCACDCACDCACDCACDCACDCACDCACDCACDCACDCACDCACMPVACCB SUB MSP 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:Nathan Holt20213 Glenbrook PathLakeville Minnesota 55044AC SYSTEM SIZE: 4.06 kW ACDC SYSTEM SIZE: 5.6 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Eric Thomas March 4, 2023 715039 A CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 SITE PLAN PV2 SCALE: 1/16" = 1'-0" M MSP AC CB LC SUB PV TS MAIN SERVICE PANEL UTILITY METER AC DISCONNECT COMBINER BOX LOAD CENTER SUBPANEL PV METER TRANSFER SWITCH JUNCTION BOX LEGEND FIRE SETBACK TRENCHING PROPERTY LINE ESS HUB RPO SUNPOWER ESS SUNPOWER HUB+ REMOTE POWER OFF PV SYSTEM SPECIFICATIONS TOTAL NUMBER OF MODULES:14 MODULE MAKE AND MODEL:URE FBM400MFG-BB MODULE WATTAGE:400W DC INVERTER MAKE AND MODEL:Enphase IQ8PLUS-72-2-US INVERTER TYPE: Microinverter (1 Inverter per PV Module) INVERTER CURRENT OUTPUT:1.21A AC INVERTER NOMINAL VOLTAGE: 240V INVERTER WATTAGE:290W AC FRONT OF HOME20213 GLENBROOK PATHA Sealed For Existing Roof & Attachment Only I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that I am aduly Licensed Professional Engineer under the laws of theState of Minnesota.John A. Calvert, License No. 52823Expiration Date: 30-June-2024 3/6/23 Concept Approval ONLY Subject to Field Inspection Inspector Date 2020 MN Bldg Code 03/07/2023dpfannenstein For each roof plane with a photo-voltaic array, two pathways not less than 36" wide shall be provided from the lowest roof edge to ridge on the same roof plane as the array,on an adjacent roof plane, or straddling the same and adjacent roof planes. Not fewer than one pathway shall be provided on the street or driveway side of the house. Not less than an 18" clear setback is required on both sides of a horizontal ridge. DCACDCACDCACDCACDCACDCACDCACDCACDCACDCACDCACDCACDCACDCACMPVACCB SUB MSP 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:Nathan Holt20213 Glenbrook PathLakeville Minnesota 55044AC SYSTEM SIZE: 4.06 kW ACDC SYSTEM SIZE: 5.6 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Eric Thomas March 4, 2023 715039 A CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 ROOF PLAN PV3 SCALE: 1/8" = 1'-0" M MSP AC CB LC SUB PV TS MAIN SERVICE PANEL UTILITY METER AC DISCONNECT COMBINER BOX LOAD CENTER SUBPANEL PV METER TRANSFER SWITCH JUNCTION BOX LEGEND FIRE SETBACK TRENCHING PROPERTY LINE ESS HUB RPO SUNPOWER ESS SUNPOWER HUB+ REMOTE POWER OFF PV SYSTEM SPECIFICATIONS TOTAL NUMBER OF MODULES:14 MODULE MAKE AND MODEL:URE FBM400MFG-BB MODULE WATTAGE:400W DC INVERTER MAKE AND MODEL:Enphase IQ8PLUS-72-2-US INVERTER TYPE: Microinverter (1 Inverter per PV Module) INVERTER CURRENT OUTPUT:1.21A AC INVERTER NOMINAL VOLTAGE: 240V INVERTER WATTAGE:290W AC MP1 # OF MODULES: 14 AZIMUTH: 224 PITCH: 33 TSRF: 94% AREA: 874 ft.²FRONT OF HOMEUNDERGROUND SERVICE LINEPOINT OF INTERCONNECTION A 3' 3' 3' 1'-6" 1'-6"Sealed For Existing Roof & Attachment Only I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that I am aduly Licensed Professional Engineer under the laws of theState of Minnesota.John A. Calvert, License No. 52823Expiration Date: 30-June-2024 3/6/23 ATTACHMENT SPACING- SIDE VIEWDSCALE: 1/2" = 1'-0" B A LANDSCAPE PORTRAIT A B MODULE WIDTH MODULE WIDTH PV MODULE ROOF STRUCTURE 33° PV MODULE UNIRAC SFM 2" MICRORAIL UNIRAC SFM 6.5" SPLICE PV MODULE UNIRAC SFM 2" MICRORAIL 23" MAX.48" MAX. 23" MAX.24" MAX. ATTACHMENT SPACING- FRONT VIEWCSCALE: 3/4" = 1'-0" UNIRAC SFM 8" ATTACHED SPLICE LANDSCAPE PORTRAIT BOTTOM STANDOFF DETAILBSCALE: 3" = 1'-0" MIDDLE/TOP STANDOFF DETAILASCALE: 3" = 1'-0" UNIRAC SFM INFINITY URE FBM400MFG-BB PV MODULE UNIRAC SFM MICRORAIL/ SPLICE (E) ROOF SHEATHING FLASHING UNIRAC SFM SLIDER (1) 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE 212" MIN. EMBED. URE FBM400MFG-BB PV MODULE (E) ROOF SHEATHING FLASHING UNIRAC SFM SLIDER AND TRIMRAIL ROOF ATTACHMENT (1) 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE 212" MIN. EMBED. UNIRAC SFM TRIMRAIL 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:Nathan Holt20213 Glenbrook PathLakeville Minnesota 55044AC SYSTEM SIZE: 4.06 kW ACDC SYSTEM SIZE: 5.6 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Eric Thomas March 4, 2023 715039 A CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 STRUCTURAL PV4 STRUCTURAL INFORMATION: ROOF TYPE (1): ROOF TYPE:Comp Shingle SHEATHING TYPE:OSB FRAMING TYPE:Manufactured Truss FRAMING SIZE:2x4 @ 24" OC CEILING JOIST SIZE:2x4 @ 24" OC ATTACHMENT:SFM Infinity Flashkit RACKING:Unirac SFM Infinity @ 24" OC Portrait / 48" OC Landscape NUMBER OF ATTACHMENTS:32 PV MODULE COUNT:14 Modules TOTAL ARRAY AREA:285.6 ft² (20.4ft²/panel) TOTAL ROOF AREA:2505 ft² ARRAY/ROOF AREA:11.4% ARRAY WEIGHT:700 lbs (50 lbs/panel) DISTRIBUTED LOAD:2.45 lbs/ft² POINT LOAD:21.88 lbs/attachment STRUCTURAL NOTES: None *NOTE: LISTED NUMBER OF ATTACHMENT POINTS ARE AN ESTIMATE ONLY AND MAY VARY BASED ON FIELD CONDITIONS. MAXIMUM ATTACHMENT SPACING TO BE FOLLOWED PER ENGINEER OF RECORD SPECIFICATIONS. -RACKING ATTACHMENTS TO BE STAGGEREDA Sealed For Existing Roof & Attachment Only I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that I am aduly Licensed Professional Engineer under the laws of theState of Minnesota.John A. Calvert, License No. 52823Expiration Date: 30-June-2024 3/6/23 UTILITY COMPANY:Dakota Electric Association PERMIT ISSUER: City of Lakeville 120/240 VAC 60HZ 1 PHASETO UTILITY GRID ELECTRICAL NOTES: DESIGNER NOTES: LOAD SIDE BREAKER, EXTERIOR MSP. UTILITY PV PRODUCTIONMETER EGC L1 L2 N 15 PV AC DISCONNECT NON-FUSED LOCKABLE, VISIBLE OPEN 30A, 240V, 2-POLE L1 L2 N EGC 15 (1) CIRCUIT OF 7 MODULES (1) CIRCUIT OF 7 MODULES JB-1L1 L2 EGC L1 L2 (N) 20A / 2P L1 L2 EGC 12 JB JB-1L1 L2 EGC L1 L2 (N) 20A / 2P L1 L2 EGC 12 EGC N G 15A / 2P ENVOY (14) URE FBM400MFG-BB UL 1703 COMPLIANT(14) Enphase IQ8PLUS-72-2-US UL 1741 COMPLIANT ENPHASE IQ COMBINER 4X-IQ-AM1-240-4 (SOLAR LOAD ONLY) 3 JB-1 EZ SOLAR JUNCTION BOX 4"x4"x4" PVC JUNCTION BOX 15 (E) 150A / 2P (N) 25A / 2P (E) GROUNDING ELECTRODE(S) L2 L1 N EGC (E) LOADS (E) LOADS FEED THROUGH LUGS AT END OF BUSSING L2 L1 NEGC N G N G (E) 150A MAIN SERVICE PANEL (E) 150A / 2P MAIN BREAKER 15 (E) IF REQUIRED, VERIFICATION WILL BE DONE TO ENSURE THE GROUNDING ELECTRODE SYSTEM IS CONGRUENT WITH CURRENT REQUIREMENTS. (NEC 250 PART III) IF NOT, A NEW GROUND ROD WILL BE INSTALLED. (N) 58" COPPER GROUND ROD, 8' LONG, MIN. 6' FROM (E) GROUNDING CONDUCTOR. GEC INSTALLED PER NEC 250.64: 6 OR 4 AWG SOLIDCOPPER GEC. (E) 150A / 2P (E) 150A SUB PANEL INTERCONNECTION NOTES: 705.12(B)(3) THE FOLLOWING METHOD(S) SHALL BE USED TO DETERMINE THE RATINGS OF BUSBARS:(6) CONNECTIONS SHALL BE PERMITTED ON BUSBARS OF PANEL-BOARDS THAT SUPPLY LUGS CONNECTED TO FEED-THROUGH CONDUCTORS. THE FEED THROUGH CONDUCTORS SHALL BE SIZED IN ACCORDANCE WITH 705.12(B)(1). 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:Nathan Holt20213 Glenbrook PathLakeville Minnesota 55044AC SYSTEM SIZE: 4.06 kW ACDC SYSTEM SIZE: 5.6 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Eric Thomas March 4, 2023 715039 A CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 ELECTRICAL PV5A GROUNDING NOTES 1. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 690.47] AND [NEC 250.50-60] SHALL BE PROVIDED. PER [NEC 690.47], THE GROUNDING ELECTRODE SYSTEM OF AN EXISTING BUILDING MAY BE USED AND BE BONDED AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP. 2. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 AWG COPPER WIRE PER [NEC 250.64(B)]. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT PER [NEC 250.64(C)]. 3. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN 8 AWG AND NO GREATER THAN 6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. 4. PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 250.21], [NEC TABLE 250.122], AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC 690.46]. 5. MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC 690.42]. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER MODULE. 7. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTION POINTS IDENTIFIED IN THEMANUFACTURER'S INSTALLATION INSTRUCTIONS. 8. ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION GROUNDING LUGS. 9. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL. 10. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR STRANDED, AND BARE WHEN EXPOSED.11. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO [NEC 690.45] AND BE A MINIMUM OF 10 AWG WHEN NOT EXPOSED TO DAMAGE (6 AWG SHALL BE USED WHEN EXPOSED TO DAMAGE). 12. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLOR CODED GREEN (OR MARKED GREEN IF 4 AWG OR LARGER). 13. ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS. 14. SYSTEM GEC SIZED ACCORDING TO [NEC 690.47], [NEC TABLE 250.66], DC SYSTEM GEC SIZED ACCORDING TO [NEC 250.166], MINIMUM 8 AWG WHEN INSULATED, 6 AWG WHEN EXPOSED TO DAMAGE. 15. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH [NEC 250.134] OR [NEC 250.136(A)] REGARDLESS OF VOLTAGE. WIRING & CONDUIT NOTES 1. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND APPROVED FOR THE SITE APPLICATIONS. 2. BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR). 3. ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT. REDUCING WASHERS DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED 4. UV RESISTANT CABLE TIES (NOT ZIP TIES) USED FOR PERMANENT WIRE MANAGEMENT OFF THE ROOF SURFACE IN ACCORDANCE WITH [NEC 110.2,110.3(A-B)]. 5. SOLADECK JUNCTION BOXES MOUNTED FLUSH WITH ROOF SURFACE TO BE USED FOR WIRE MANAGEMENT AND AS FLASHED ROOF PENETRATIONS FOR INTERIOR CONDUIT RUNS. 6. ALL PV CABLES AND HOMERUN WIRES BE TYPE USE-2, AND SINGLE-CONDUCTOR CABLE LISTED AND IDENTIFIED AS PV WIRE, TYPE TC-ER, OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER BOXES AS REQUIRED. 7. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC 690.8] FOR MULTIPLE CONDUCTORS. 8. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE INSTALLED AT LEAST 7/8"ABOVE THE ROOF SURFACE AND DERATED ACCORDING TO [NEC TABLE 310.15 (B)(2)(A)], [NEC TABLE310.15(B)(3)(A)],& [NEC 310.15(B)(3)(C)]. 9. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90°C RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT WIRE FROM SHARP EDGES. 10. PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN-2 INSULATED, 90°C RATED, WET AND UV RESISTANT, RATED FOR 600V 11. 4-WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER VOLTAGE TO GROUNDMARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS. 12. ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION 13. VOLTAGE DROP LIMITED TO 2% FOR DC CIRCUITS AND 3% FOR AC CIRCUITS 14. NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: DC POSITIVE- RED (OR MARKED RED), DC NEGATIVE- GREY (OR MARKED GREY) 15. POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED: DC POSITIVE- GREY (OR MARKED GREY), DC NEGATIVE- BLACK (OR MARKED BLACK) 16. AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRAL- WHITE/GRAY * USE-2 IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN/THWN-2 AND MAY BE USED INSIDE ** USE-2 IS AVAILABLE AS UV WHITE 17. RIGID CONDUIT, IF INSTALLED, (AND/OR NIPPLES) MUST HAVE A PULL BUSHING TO PROTECT WIRES.18. IF CONDUIT DETERMINED TO BE RAN THROUGH ATTIC IN FIELD THEN CONDUIT WILL BE EITHER EMT, FMC, OR MC CABLE IF DC CURRENT COMPLYING WITH [NEC 690.31], [NEC 250.118(10)]. DISCONNECTING MEANS SHALL COMPLY WITH [NEC 690.13] AND [NEC 690.15]. 19. CONDUIT RAN THROUGH ATTIC WILL BE AT LEAST 18" BELOW ROOF SURFACE COMPLYING WITH [NEC 230.6(4)] AND SECURED NO GREATER THAN 6' APART PER [NEC 330.30(B)]. 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:Nathan Holt20213 Glenbrook PathLakeville Minnesota 55044AC SYSTEM SIZE: 4.06 kW ACDC SYSTEM SIZE: 5.6 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Eric Thomas March 4, 2023 715039 A CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 ELEC CALCS PV6 A LABEL 1 FOR PV SYSTEM DISCONNECTING MEANS WHERE THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION. [2017 NEC 690.13(B)] [2020 NEC 690.13(B)] LABEL 2 SHALL BE MARKED AT AN ACCESSIBLE LOCATION AT THE DISCONNECTING MEANS AS A POWER SOURCE AND WITH THE RATED AC OUTPUT CURRENT AND THE NOMINAL OPERATING AC VOLTAGE. [2017 NEC 690.54] [2020 NEC 690.54] LABEL 3 IF INTERCONNECTING LOAD SIDE, INSTALL THIS LABEL ANYWHERE THAT IS POWERED BY BOTH THE UTILITY AND THE SOLAR PV SYSTEM, IE. MAIN SERVICE PANEL AND SUBPANELS. [2017 NEC 705.12(B)(3)] [2020 NEC 705.12(B)(3)] LABEL 4 APPLY TO THE DISTRIBUTION EQUIPMENT ADJACENT TO THE BACK-FED BREAKER FROM THE POWER SOURCE. [2017 NEC 705.12(B)(2)(3)(b)] [2020 NEC 705.12(B)(3)(2)] LABEL 5 APPLY TO THE PV COMBINER BOX [2017 NEC 705.12(B)(2)(3)(c)] [2020 NEC 705.12(B)(3)(3)] LABEL 6 BUILDINGS WITH PV SYSTEMS SHALL HAVE A PERMANENT LABEL LOCATED AT EACH SERVICE EQUIPMENT LOCATION TO WHICH THE PV SYSTEMS ARE CONNECTED OR AT AN APPROVED READILY VISIBLE LOCATION AND SHALL INDICATE THE LOCATION OF RAPID SHUTDOWN INITIATION DEVICES. [2017 NEC 690.56(C)(1)(a)] [2020 NEC 690.56(C)] LABEL 7 SIGN LOCATED AT RAPID SHUT DOWN DISCONNECT SWITCH [2017 NEC 690.56(C)(3)] [2020 NEC 690.56(C)(2)] LABEL 8 PERMANENT PLAQUE OR DIRECTORY DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE DISCONNECTING MEANS ON OR IN THE PREMISES SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT THE LOCATION(S) OF THE SYSTEM DISCONNECT(S) FOR ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED. [2017 NEC 705.10] [2020 NEC 705.10] LABEL 9 PERMANENT PLAQUE OR DIRECTORY DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE DISCONNECTING MEANS ON OR IN THE PREMISES SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT THE LOCATION(S) OF THE SYSTEM DISCONNECT(S) FOR ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED. [2017 NEC 705.10] [2020 NEC 705.10] LABEL 10 PERMANENT PLAQUE OR DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT DENOTING THE LOCATION OF THE RAPID SHUTDOWN SYSTEM DISCONNECTING MEANS IF SOLAR ARRAY RAPID SHUTDOWN DISCONNECTING SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS. [2017 NEC 705.10 AND 690.56(C)(1)(a)] [2020 NEC 705.10 AND 690.56(C)] LABEL 11 PERMANENT PLAQUE OR DIRECTORY TO BE LOCATED AT AC COMBINER PANEL. [2017 NEC 110.21(B)] [2020 NEC 110.21(B)] ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING! PHOTOVOLTAIC SYSTEM AC DISCONNECT!! 240 VNOMINAL OPERATING AC VOLTAGE RATED AC OUTPUT CURRENT 16.94 A DUAL POWER SUPPLY SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM WARNING! POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING! THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. WARNING! SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWNSWITCH TO THE"OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCESHOCK HAZARD IN THE ARRAY SOLAR ELECTRICPV PANELS RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM MAIN DISTRIBUTION UTILITY DISCONNECT(S) POWER TO THIS BUILDING IS ALSO SUPPLIED FROM A ROOF MOUNTED SOLAR ARRAY WITHA RAPID SHUTDOWN DISCONNECTING MEANS GROUPED AND LABELED WITHIN LINE OF SITE AND 10 FT OF THIS LOCATION WARNING! POWER TO THIS BUILDING IS ALSO SUPPLIED FROM MAIN DISTRIBUTION UTILITY DISCONNECT LOCATED WARNING! POWER TO THIS BUILDING IS ALSO SUPPLIED FROM A ROOF MOUNTED SOLAR ARRAY. SOLAR ARRAY RAPID SHUTDOWN DISCONNECT IS LOCATED OUTSIDE NEXT TO THE UTILITY METER. WARNING! PHOTOVOLTAIC SYSTEM COMBINER PANEL DO NOT ADD LOADS WARNING! 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:Nathan Holt20213 Glenbrook PathLakeville Minnesota 55044AC SYSTEM SIZE: 4.06 kW ACDC SYSTEM SIZE: 5.6 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Eric Thomas March 4, 2023 715039 A CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 LABELS PV7 ADDITIONAL LABELS *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENTATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VARY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON 3 LINE DIAGRAM. 3 LINE DIAGRAM ON PV5 TO REFLECT ACTUAL REPRESENTATION OF PROPOSED SCOPE OF WORK. UTILITY METER MAIN SERVICE PANEL 1 6 2 3 IF BREAKER IS USED4 8 10OR OR PLACARD SUBPANEL (IF INTERCONNECTION IS MADE HERE) 1 6 2 3 4 9 AC DISCONNECT 1 2 7 9 OR PLACARD PV COMBINER BOX 1 2 5 8 11 PV METER LABELING NOTES 1) LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2) LABELING REQUIREMENTS BASED ON THE 2017 & 2020 NEC CODE, OSHA STANDARD 19010.145, ANSIZ535. 3) MATERIAL BASED ON THE REQUIREMENTS OF THE AHJ. 4) LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED AND SHALL NOT BE HANDWRITTEN [NEC 110.21] STANDARD LABELS 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:Nathan Holt20213 Glenbrook PathLakeville Minnesota 55044AC SYSTEM SIZE: 4.06 kW ACDC SYSTEM SIZE: 5.6 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Eric Thomas March 4, 2023 715039 A CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 PLACARD PV8 DIRECTORY PLACARD NOTES [NEC 705.10] A PERMANENT PLAQUE OR DIRECTORY DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE DISCONNECTING MEANS ON OR IN THE PREMISES SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT THE LOCATION(S) OF THE SYSTEM DISCONNECT(S) FOR ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED. THE MARKING SHALL COMPLY WITH [110.21(B)]. A 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SHEET NAME: PAGE NUMBER:REVISION: 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEETS SS 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS IQ8 and IQ8+ Microinverters Our newest IQ8 Microinverters are the industry’s first microgrid-forming, software- defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently. The brain of the semiconductor-based microinverter is our proprietary application-specific integrated circuit (ASIC) which enables the microinverter to operate in grid-tied or off-grid modes. This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times to changing loads and grid events, alleviating constraints on battery sizing for home energy systems. Part of the Enphase Energy System, IQ8 Series Microinverters integrate with the Enphase IQ Battery, Enphase IQ Gateway, and the Enphase App monitoring and analysis software. IQ8 Series Microinverters redefine reliability standards with more than one million cumulative hours of power-on testing, enabling an industry- leading limited warranty of up to 25 years. Connect PV modules quickly and easily to IQ8 Series Microinverters using the included Q-DCC-2 adapter cable with plug-n-play MC4 connectors. IQ8 Series Microinverters are UL Listed as PV Rapid Shut Down Equipment and conform with various regulations, when installed according to manufacturer’s instructions. Easy to install • Lightweight and compact with plug-n-play connectors • Power Line Communication (PLC) between components • Faster installation with simple two-wire cabling High productivity and reliability • Produce power even when the grid is down* • More than one million cumulative hours of testing • Class II double-insulated enclosure • Optimized for the latest high- powered PV modules Microgrid-forming • Complies with the latest advanced grid support** • Remote automatic updates for the latest grid requirements • Configurable to support a wide range of grid profiles • Meets CA Rule 21 (UL 1741-SA) requirements © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ8 Microinverters, and other names are trademarks of Enphase Energy, Inc. Data subject to change. IQ8SP-DS-0002-01-EN-US-2022-03-17 * Only when installed with IQ System Controller 2, meets UL 1741. ** IQ8 and IQ8Plus supports split phase, 240V installations only. DATA SHEET (1) No enforced DC/AC ratio. See the compatibility calculator at https://link.enphase.com/module-compatibility (2) Maximum continuous input DC current is 10.6A (3) Nominal voltage range can be extended beyond nominal if required by the utility. (4) Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. IQ8 and IQ8+ Microinverters INPUT DATA (DC) IQ8-60-2-US IQ8PLUS-72-2-US Commonly used module pairings1 W 235 – 350 235 – 440 Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 27 – 37 29 – 45 Operating range V 25 – 48 25 – 58 Min/max start voltage V 30 / 48 30 / 58 Max input DC voltage V 50 60 Max DC current2 [module Isc]A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ8-60-2-US IQ8PLUS-72-2-US Peak output power VA 245 300 Max continuous output power VA 240 290 Nominal (L-L) voltage/range3 V 240 / 211 – 264 Max continuous output current A 1.0 1.21 Nominal frequency Hz 60 Extended frequency range Hz 50 – 68 AC short circuit fault current over 3 cycles Arms 2 Max units per 20 A (L-L) branch circuit4 16 13 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor (adjustable) 0.85 leading – 0.85 lagging Peak efficiency %97.5 97.6 CEC weighted efficiency %97 97 Night-time power consumption mW 60 MECHANICAL DATA Ambient temperature range -40ºC to +60ºC (-40ºF to +140ºF) Relative humidity range 4% to 100% (condensing) DC Connector type MC4 Dimensions (HxWxD) 212 mm (8.3”) x 175 mm (6.9”) x 30.2 mm (1.2”) Weight 1.08 kg (2.38 lbs) Cooling Natural convection – no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated, corrosion resistant polymeric enclosure Environ. category / UV exposure rating NEMA Type 6 / outdoor COMPLIANCE Certifications CA Rule 21 (UL 1741-SA), UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according to manufacturer’s instructions. IQ8SP-DS-0002-01-EN-US-2022-03-17 IQ8PLUS-72-2-US 235 – 440 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell 29 – 45 25 – 58 30 / 58 60 IQ8PLUS-72-2-US 300 290 IQ8PLUS 72 2 US 290 1.21 13 97.6 9797 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SHEET NAME: PAGE NUMBER:REVISION: 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEETS SS 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS 125 & 200 Amp 011 (closed)U204 (open)Single Meter Sockets Without Bypass Data subject to change without notice. Consult local utility for area acceptance. All dimensions are in inches. Single Meter Sockets - Without Bypass Application • Single meter position • Receive ANSI C12.10 watthour meters • Surface or flush mount (see chart) Construction • Ring type • NEMA Type 3R • ANSI 61 gray painted finish • Aluminum snap ring included Standards Accessories • UL 414 Listed • 5th Jaw Kit - see chart • ANSI C12.7 • AW Hub 4 B-Line series meter mounting equipmentEaton Part/UPC Number Catalog Number Amp Rating Jaws Service Type Access Connections Overall Dimensions Top Provision Knockout Layout 5th Jaw KitLine Load Neutral Height Width Depth 78205142000 011 125 4 1Ø/3W OH/UG #8 - 2/0 #8 - 2/0 #8 - 2/0 11" 8 1/4"35/8" AW Hub Fig.5 MSR5TK 78205142040 011 F 125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 4 5/8" 2" max KO Fig. 1 50365 78205142045 011 MS73 125 4 1Ø/3W OH/UG #8 - 2/0 #8 - 2/0 #8 - 2/0 11" 8 1/4"35/8" AW Hub Fig. 5 MSR5TK 78205142050 011 SF 125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 4 5/8" None None 50365 78205102315 011 SS 125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 4 5/8" None None 50365 79903882585 011 SS6 125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 4 5/8" None None 50365 79903882586 011 MS25A 125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 4 5/8" AW Hub Fig. 1 50365 79903856283 011 MS25 125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 4 5/8" AW Hub Fig. 1 50365 79903868944 011 MS-18 125 4 1Ø/3W OH/UG #8 - 2/0 #8 - 2/0 #8 - 2/0 11" 8 1/4"35/8" AW Hub Fig.5 MSR5TK 79903878861 011 SRP 125 4 1Ø/3W OH/UG #8 - 2/0 #8 - 2/0 #8 - 2/0 11" 8 1/4"35/8" AW Hub Fig.5 MSR5TK 79903878953 011 SRP MS18 125 4 1Ø/3W OH/UG #8 - 2/0 #8 - 2/0 #8 - 2/0 11" 8 1/4"35/8" AW Hub Fig.5 MSR5TK 78205144030 927 100 7 3Ø/4W OH/UG #14 - 1/0 #14 - 2/0 #14 - 2/0 17" 8" 4 5/8" AW Hub Fig. 1 50365 78205156000 204 200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 4 5/8" AW Hub Fig. 2 50365 78205156020 204 F 200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 6" 2" max KO Fig. 2 50365 78205108796 204 SS 200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 6" None None 50365 79903882318 U204 PSE 200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None Fig. 7 50365 78205122640 U204 F SS 200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None None 50365 78205134301 U204 SS 200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None None 50365 78205153193 U204 MS73 SS 200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None None 50365 78205156080 U204 MS21 SS 200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None None 50365 78205156030 204 F MS73 200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 6" 2" max KO Fig. 2 50365 78205156040 204 MS68 200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 4 5/8" AW / 2" Hub Fig. 2 50365 78205156035 204 MS68A 200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 4 5/8" AW / 2" Hub Fig. 2 50365 78205108490 204 MS73 200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 4 5/8" AW Hub Fig. 2 50365 78205156005 U204 200 4 1Ø/3W UG #6 - 350MCM #6 - 350MCM #6 - 350MCM 15 1/8"111/4"41/2" None Fig. 6 MSR5TK 78205156045 U204 F 200 4 1Ø/3W OH/UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" (2) 2" max KO Fig. 3 50365 78205156060 U204 MS21 200 4 1Ø/3W OH/UG #6 - 350MCM #6 - 350MCM #6 - 350MCM 15 1/8"111/4"41/2" AW / Cap Fig. 6 MSR5TK 78205156060 U204 F MS73 200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None Fig. 3 50365 78205156070 U204 MS73 200 4 1Ø/3W OH/UG #6 - 350MCM #6 - 350MCM #6 - 350MCM 15 1/8"111/4"41/2" (2) 2" max KO Fig. 6 MSR5TK 78205156140 U207 200 7 3Ø/4W OH/UG #6 - 250MCM #6 - 250MCM #6 - 250MCM 18" 12" 5" AW Hub Fig. 4 50365 78205156170 U207 F 200 7 3Ø/4W OH/UG #6 - 250MCM #6 - 250MCM #6 - 250MCM 18" 12" 5" 2 1/2" max KO Fig. 4 50365 78205156180 U207 MS73 200 7 3Ø/4W OH/UG #6 - 250MCM #6 - 250MCM #6 - 250MCM 18" 12" 5" AW Hub Fig. 4 50365 Knockouts - Conduit Sizes 1W = 1⁄4" 1A = 1⁄2" 2A = 1⁄2" - 1⁄4" 4D = 11⁄4" - 1" - 3⁄4" - 1⁄2" 4E = 11⁄2" - 11⁄4" - 1" - 3⁄4" 4F = 2" - 11⁄2" - 11⁄4" - 1" 4G = 21⁄2" - 2" - 11⁄2" - 11⁄4" 4H - 3" - 21⁄2" - 2" - 11⁄2" 6G = 21⁄2" - 2" - 11⁄2" - 11⁄4" - 1" - 3⁄4" Top Provision = See Chart Knockout Layouts 125 & 200 Amp Single Meter Sockets Without Bypass Data subject to change without notice. Consult local utility for area acceptance. All dimensions are in inches. Single Meter Sockets - Without Bypass Style #Suffixes 011 F - Flush Mount (U) 207 MS18 - Lexan Cover (U) 204 MS21 - Top Hub Provision (U) 207 MS25 - Solar Ready (U) 207 MS25A - MS25 + MS18 927 MS68 - 2" Conduit Hub MS68A - MS73 + MS68 MS73 - AL Screw Type Ring SF - Semi Flush Mount SS - Stainless Steel 304 * SS6 - Stainless Steel 316 * 5B-Line series meter mounting equipment Eaton * Knockouts and top provisions are not available in Stainless Steel (SS) finish Fig. 1 Fig. 6 Top Provision Top Provision Fig. 2 Fig. 4 2A Top ProvisionTop Provision 1A 4F 4F 4Fbothsides 1A 6G 4G 4G 1W 4G 4G 4G4G 4G 6Gbothsides4Gbothsides 1A 4F 4F 4Fbothsides Fig. 3 Top Provision 1W 4F 4G 4G 4F 4Fbothsides Fig. 5 Top Provision 1A 4E 4F 4Ebothsides 4D4D Fig. 7 Top Provision 1A 4F 4H 4F 4G 4Fbothsides 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SSPROPRIETARY AND CONFIDENTIAL: THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF EZ SOLAR. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF EZ SOLAR IS PROHIBITED. Phone: 385-202-4150 www.ezsolarproducts.com ITEM No. 1 1 1 6 6 JB-1.2 Body POLYCARBONATE WITH UV INHIBITORS POLYCARBONATE WITH UV INHIBITORS #10 x 1-1/4” Phillips pan head screw #8 x 3/4” Phillips pan head screw JB-1.2 Lid2 3 4 PART NUMBER DESCRIPTION QTY Size SCALE: 1:2 WEIGHT: 1.45 LBS SHEET 1 of 3 DWG. NO. Rev B JB-1.2 Torque Specification: certification: WEIGHT: 15-20 LBS 1.45 LBS UL Standard 1741, nema 3r JB-1.2 Specification Sheet PV Junction Box for Composition/Asphalt Shingle Roofs • Maximum Voltage: 1,000 Volts • Maximum Current: 80 Amps • Allowable Wire: 14 AWG – 6 AWG • Spacing: Please maintain a spacing of at least ½” between uninsulated live parts and fittings for conduit, armored cable, and uninsulated live parts of opposite polarity. • Enclosure Rating: Type 3R • Roof Slope Range: 2.5 – 12:12 • Max Side Wall Fitting Size: 1” • Max Floor Pass-Through Fitting Size: 1” • Ambient Operating Conditions: (-35°C) - (+75°C) • Compliance: - JB-1.2: UL1741 - Approved wire connectors: must conform to UL1741 • System Marking: Interek Symbol and File #5019942 • Periodic Re-inspections: If re-inspections yield loose components, loose fasteners, or any corrosion between components, components that are found to be affected are to be replaced immediately. A. System Specifications and Ratings Phone: 385-202-4150 | www.ezsolarproducts.com 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS www.carlon.com180 Rigid Nonmetallic Conduit – Junction Boxes Molded Nonmetallic Junction Boxes6P Rated It’s another first from Carlon®- the first nonmetallic junction boxes UL Listed with a NEMA 6P rating per Section 314.29, Exception of the National Electrical Code. Manufactured from PVC or PPO thermoplastic molding compound and featuring foam-in-place gasketed lids attached with stainless steel screws, these rugged enclosures offer all the corrosion resistance and physical properties you need for direct burial applications. Type 6P enclosures are intended for indoor or outdoor use, primarily to provide a degree of protection against contact with enclosed equipment, falling dirt, hose- directed water, entry of water during prolonged submersion at a limited depth, and external ice formation. • All Carlon Junction Boxes are UL Listed and maintain a minimum of a NEMA Type 4/4x Rating. • Parts numbers with an asterisk (*) are UL Listed and maintain a NEMA Type 6P Rating and Type 4/4X Rating. E42728Except where noted by † Size in Std.Material Std. Inches Ctn. Min Min. Min. Min. Ta Tc Thermo-Ctn. Part No. H x W x D Qty.AT AB B C PVC plastic Wt. (Lbs.) E989NNJ-CAR* 4 x 4 x 2 5 311/16 35/8 N/A 2 .160 .155 X 3 E987N-CAR* 4 x 4 x 4 5 3 11/16 31/2 N/A 4 .160 .155 X 4 †E989NNR-CAR* 4 x 4 x 6 4 3 11/16 33/8 N/A 6 .160 .200 X 5 E989PPJ-CAR* 5 x 5 x 2 4 411/16 41/2 N/A 2 .110 .150 X 3 E987R-CAR* 6 x 6 x 4 2 6 5 5/8 N/A 4 .190 .190 X 3 E989RRR-UPC* 6 x 6 x 6 8 5 5/8 53/8 N/A 6 .160 .150 X 14 E989N-CAR 8 x 8 x 4 1 8 8 N/A 4 .185 .190 X 2 E989SSX-UPC 8 x 8 x 7 2 7 21/32 75/16 N/A 7 .160 .150 X 6 E989UUN 12 x 12 x 4 3 115/8 111/2 111/8 4 .160 .150 X 12 E989R-UPC 12 x 12 x 6 2 11 15/16 117/8 117/16 6 .265 .185 X 10 Typical Gross Automation (877) 268-3700 · www.carlonsales.com · sales@grossautomation.com 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS SFM INFINITY REVOLUTIONIZES ROOFTOP SOLAR WITH BENEFITS ACROSS YOUR BUSINESS, FROM DESIGN AND LOGISTICS, THROUGH ARRAY INSTALLATION AND SERVICE. SFM INFINITY 20% FEWER ATTACHMENTS Save time and money on every project: SFM INFINITY requires fewer attachments than rail systems. 2 INSTALLS PER DAY Make two installs per day your new standard. SFM INFINITY has fewer roof attachments, one tool installation, and pre-assembled components to get you off the roof 40% faster. BETTER AESTHETICS Install the system with the aesthetics preferred by homeowners, with integrated front trim, trim end caps, dark components, and recessed hardware. 30% LOGISTICS SAVINGS With fewer SKUs and compact components, SFM INFINITY is easier to stock, easier to transport, and easier to lift to the roof. Plus, make more efficient use of your vehicle fleet. SYSTEM OVERVIEW BONDING AND ACCESSORIES 2MW 3MW PART NAME DESCRIPTION TRIMRAIL ENDCAPS Covers ends of TRIMRAIL for refined aesthetic. TRIMRAIL BONDING CLAMP Electrically bonds TRIMRAIL and modules N/S BONDING CLAMP Electrically bonds rows of modules 2 3 4 5 6 1 1 4 3 5 6 7 SFM INFINITY 15 Attachments RAIL20 Attachments 87%OF HOMEOWNERS PREFER MAXIMUM POWER DENSITY Easily mix module orientations to achieve optimal power density without incurring the increased bill of materials, labor, and attachments required by rail. 7 2 PART NAME DESCRIPTION TRIMRAIL Structural front trim provides aesthetic and aligns modules. TRIMRAIL SPLICE Connects and electrically bonds sections of TRIMRAIL. TRIMRAIL FLASHKIT Attaches TRIMRAIL to roof. Available for comp shingle or tile. MODULE CLIPS Secure modules to TRIMRAIL. MICRORAIL Connects modules to SLIDERS. Provides post-install array leveling. SPLICE Connects and supports modules. Provides east-west bonding. ATTACHED SPLICE also available. SLIDER FLASHKIT Roof attachment and flashing. Available for comp shingle and tile. 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS SFM SUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 19SYSTEM BONDING & GROUNDING E-W BONDING PATH: (:PRGXOHWRPRGXOHERQGLQJLVDFFRPSOLVKHG ZLWKSUHLQVWDOOHGERQGLQJSLQVZKLFKHQJDJH RQWKHVHFXUHVLGHRIWKH0LFURUDLO70DQGVSOLFH TRIMRAIL BONDING PATH: 7ULPUDLOWRPRGXOHERQGLQJLVDFFRPSOLVKHGZLWK ERQGLQJFODPSZLWKLQWHJUDOERQGLQJSLQDQG ERQGLQJ7EROW(refer also to alternate method) N-S BONDING PATH: 16PRGXOHWRPRGXOHERQGLQJLV DFFRPSOLVKHGZLWKERQGLQJFODPSZLWKLQWHJUDO ERQGLQJSLQV(refer also to alternate method) System bonding is accomplished through modules. System grounding accomplished by attaching DJURXQGOXJWRDQ\PRGXOHDWDORFDWLRQRQWKHPRGXOHVSHFLʳHGE\WKHPRGXOHPDQXIDFWXUHU LUG DETAIL & TORQUE INFO Ilsco Lay-In Lug (GBL-4DBT) •PRXQWLQJKDUGZDUH •7RUTXH IWOE •$:*6ROLGRU6WUDQGHG LUG DETAIL & TORQUE INFO Ilsco Flange Lug (SGB-4) •ȧPRXQWLQJKDUGZDUH •7RUTXH LQOE •$:*6ROLGRU6WUDQGHG LUG DETAIL & TORQUE INFO Wiley WEEBLug (6.7) •ȧPRXQWLQJKDUGZDUH •7RUTXH IWOE •$:*6ROLGRU6WUDQGHG NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION TERMINAL TORQUE, Install Conductor and torque to the following: 4-6 AWG: 35in-lbs 8 AWG: 25 in-lbs 10-14 AWG: 20 in-lbs TERMINAL TORQUE, Install Conductor and torque to the following: 6-14 AWG: 7ft-lbs TERMINAL TORQUE, Install Conductor and torque to the following: 4-14 AWG: 35in-lbs WEEBLUG Single Use Only Star Washer is Single Use Only Ñ$OWHUQDWHPHWKRG $OWHUQDWHPHWKRG 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS SFM SUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 20UL CODE COMPLIANCE NOTES SYSTEM LEVEL FIRE CLASSIFICATION 7KHV\VWHPʳUHFODVVUDWLQJUHTXLUHVLQVWDOODWLRQLQWKHPDQQHUVSHFLʳHGLQWKH 681)5$0(0,&525$,/6)0,QVWDOODWLRQ*XLGH6)0KDVEHHQFODVVLʳHGWR WKHV\VWHPOHYHOʳUHSRUWLRQRI8/7KLV8/FODVVLʳFDWLRQKDVEHHQ LQFRUSRUDWHGLQWRWKH8/SURGXFWFHUWLʳFDWLRQ6)0KDVDFKLHYHG&ODVV$ % &V\VWHPOHYHOSHUIRUPDQFHIRUORZVORSH VWHHSVORSHGURRIVZKHQXVHG LQFRQMXQFWLRQZLWKW\SHDQGW\SHPRGXOHV&ODVV$% &V\VWHPOHYHOʳUH UL2703 TEST MODULES 6HHSDJHVDQGIRUDOLVWRIPRGXOHVWKDWZHUHHOHFWULFDOO\DQGPHFKDQLFDOO\WHVWHGRU TXDOLʳHGZLWKWKH681)5$0(0,&525$,/6)0FRPSRQHQWVRXWOLQHGZLWKLQWKLV,QVWDOODWLRQ*XLGH •0D[LPXP$UHDRI0RGXOH VTIW •8/'HVLJQ/RDG5DWLQJV D 'RZQZDUG3UHVVXUHȡ36)3D E 8SZDUG3UHVVXUHȡ36)3D F 'RZQ6ORSH/RDGȡ36)3D •7HVWHG/RDGV D 'RZQZDUG3UHVVXUHȡ36)3D E 8SZDUG3UHVVXUHȡ36)3D F 'RZQ6ORSH/RDGȡ36)3D •0D[LPXP6SDQ IW •8VHZLWKDPD[LPXPRYHUFXUUHQWSURWHFWLRQGHYLFH2&3'RI$ •6\VWHPFRQIRUPVWR8/6WGFHUWLʳHGWR/75$( •5DWHGIRUDGHVLJQORDGRI3D3DZLWKLQFKVSDQ •39PRGXOHVPD\KDYHDUHGXFHGORDGUDWLQJLQGHSHQGHQWRIWKH6)0ORDGUDWLQJ3OHDVHFRQVXOW WKH39PRGXOHPDQXIDFWXUHU VLQVWDOODWLRQJXLGHIRUPRUHLQIRUPDWLRQ •'RZQ6ORSHGHVLJQORDGUDWLQJRI36)3DIRUPRGXOHDUHDVRIVTIWRUOHVV Module Type Roof Slope System Level Fire Rating Microrail Direction Module Orientation Mitigation Required Type 1 and Type 2 6WHHS6ORSH /RZ6ORSH &ODVV$% & (DVW:HVW /DQGVFDSH253RUWUDLW None Required SHUIRUPDQFHLVLQKHUHQWLQWKH6)0GHVLJQDQGQRDGGLWLRQDOPLWLJDWLRQPHDVXUHV DUHUHTXLUHG7KHʳUHFODVVLʳFDWLRQUDWLQJLVYDOLGIRUDQ\URRISLWFK7KHUHLVQR UHTXLUHGPLQLPXPRUPD[LPXPKHLJKWOLPLWDWLRQDERYHWKHURRIGHFNWRPDLQWDLQ WKH&ODVV$% &ʳUHUDWLQJIRU6)0681)5$0(0,&525$,/TM FRPSRQHQWVVKDOO EHPRXQWHGRYHUDʳUHUHVLVWDQWURRIFRYHULQJUDWHGIRUWKHDSSOLFDWLRQ 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS SFM SUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 22TESTED / CERTIFIED MODULE LIST Aleo P-Series $SWRV '1$%)0) '1$%)0) $VWURQHUJ\ &+603&+603+9&+600 &+600+9&+600%/%)+) CHSM72M-HC Auxin $;107$;137 $;107 $;137 $[LWHF $;,EODFNSUHPLXPPP $;,SRZHUPP $;,SRZHUPP $;,SUHPLXPPP $;,SUHPLXPPP %RYLHW %90 %90 %<'P6K & MHK-36 Series Canadian Solar &6+.8<06 &6./8&6.0%$*&6.063 &6106&680%$*&68063&6: &6$0&6.8&6.03&6.06 &6303&6803&690&6;3 &HQWURVRODU$PHULFD C-Series & E-Series &HUWDLQ7HHG &7[[0[[&7[[3[[ &7[[[0[[&7[[[0 &7[[[0[[&7[[[+& 'HKXL '+0 Manufacture Module Model / Series Eco Solargy Orion 1000 & Apollo 1000 ET Solar ET-M672BHxxxTW )UHHGRP)RUHYHU FF-MP-BBB-370 )UHH9ROW Mono PERC GCL GCL-P6 & GCL-M6 Series Hansol 7'$17'$1 8%$18'$1 Heliene 0030 36HULHV +&00RQRIDFLDO%LIDFLDO6HULHV +&06/%LIDFLDO HT Solar +701'9) +703 Hyundai .*0*7*5,5*7,0,+, .,6HULHV HiA-SxxxHG ,7(. L7L7+( L76(6HULHV Japan Solar JPS-60 & JPS-72 Series JA Solar -$3[[[-$0[[[6,-$0. [[[-$3N[[[%%-$36<<[[[== -$3N[[[%%-$36<<[[[== -$0N[[[==-$06<<[[[== -$0N[[[==-$06<<[[[== L<< LL==6&35%3+L7,%0:05 -LQNR JKM & JKMS Series Eagle JKMxxxM -.0[[[0+/9 Kyocera KU Series Manufacture Module Model / Series Manufacture Module Model / Series ȫ8QOHVVRWKHUZLVHQRWHGDOOPRGXOHVOLVWHGDERYHLQFOXGHDOOZDWWDJHVDQGVSHFLʳFPRGHOVZLWKLQWKDWVHULHV9DULDEOHZDWWDJHVDUHUHSUHVHQWHGDV[[[ ȫ,WHPVLQSDUHQWKHVLVDUHWKRVHWKDWPD\RUPD\QRWEHSUHVHQWLQDFRPSDWLEOHPRGXOH VPRGHO,' ȫ6ODVKHVEHWZHHQRQHRUPRUHLWHPVLQGLFDWHVWKDWHLWKHURIWKRVHLWHPVPD\EHWKHRQHWKDWLVSUHVHQWLQDPRGXOH VPRGHO,' ȫ3OHDVHVHHWKH6)08/&RQVWUXFWLRQ'DWD5HSRUWDW8QLUDFFRPWRHQVXUHWKHH[DFWVRODUPRGXOHVHOHFWHGLVDSSURYHGIRUXVHZLWK6)0 ȫ6)0,QʳQLW\LVQRWFRPSDWLEOHZLWKPRGXOHIUDPHKHLJKWRIOHVVWKDQPPDQGPRUHWKDQPP6HH0RGXOH0RXQWLQJVHFWLRQSDJHIRUIXUWKHULQIRUPDWLRQ /*(OHFWURQLFV LGxxxN2T-A4 /*[[[$&(&(.1&1.171: 4&4.6&6:$ LGxxxN2T-B5 LGxxxN1K-B6 /*[[[$&0&0.1&1.4&4. 4$&4$.$ /*[[[1&1.171:( /*[[[1&1.1:6&6:* LGxxxN2T-J5 /*[[[1.1:171:/ /*[[[1&4&4.1 /*[[[1&1.1:4&4.9 LONGi /5+,%+,++3%+3+[[[0 /5+,++3+[[[0 /5%3+%'+,%'[[[0PP /5%.3(+3%+3+[[[0PP /5%.3(3%3+[[[0PP /5%3+%'+,%'[[[0PP /5+9%.3(3+3%+3+[[[0 PP /5%.+93(3%3+[[[0PP Mission Solar Energy MSE Series 0LWVXELVKL MJE & MLE Series 1HR6RODU3RZHU&R '0 '36HULHV 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS SFM SUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 23TESTED / CERTIFIED MODULE LIST 5(&FRQW 7ZLQ3HDN6HULHV 7ZLQ3HDN6HULHV 7ZLQ3HDN%/.6HULHV 7ZLQ3HDN60;9 7ZLQ3HDN6HULHVPP 73%ODFN Renesola 9LWUXV6HULHV 6HULHV Risen 5600'*0560 SEG Solar 6(*[[[%0'+9 S-Energy 61 616HULHVPP Seraphim SEG-6 & SRP-6 Series Sharp NU-SA & NU-SC Series 6LOIDE 6/$6/*%&6HULHV 6,/[[[%/1/17+/ 0/%.1;18+& 6RODUHYHU86$ 6( [[[01 Solaria 3RZHU;7[[[5$&3'%' 3RZHU;7[[[&3' 3RZHU;7[[[530$& SolarWorld 6XQPRGXOH3URWHFW Sunmodule Plus Sonali 660WR6HULHV 660WR6HULHV 660WR6HULHV 660WR%L)DFLDO6HULHV SS 230 - 265 SunEdison )6HULHV56HULHV )/(;);66HULHV 6XQLYD 096HULHV 2SWLPXV6HULHV Manufacture Module Model / Series SunPower $6HULHV$%/.6350$;;;;5 ;6HULHV(6HULHV 36HULHV 6XQWHFK 673673;;;6%:QKE Talesun 73737373 73+LSRU06PDUW Tesla 6&6&%6&%6&% 7[[[+7[[[6 Trina 3$3''''(''3( 3'3('''('('( PE15H Upsolar 830[[[3% 830[[[0% URE '0[[[+$'0.[[[+$ )$.[[[&*(*)$0[[[(*%% )$0[[[(*%% 9LNUDP (OGRUD 6ROLYR Somera Waaree AC & Adiya Series Winaico WST & WSP Series Yingli YGE & YLM Series =16KLQH =;0=;01+B Manufacture Module Model / Series Manufacture Module Model / Series ȫ 8QOHVVRWKHUZLVHQRWHGDOOPRGXOHVOLVWHGDERYHLQFOXGHDOOZDWWDJHVDQGVSHFLʳFPRGHOVZLWKLQWKDWVHULHV9DULDEOHZDWWDJHVDUHUHSUHVHQWHGDV[[[ ȫ ,WHPVLQSDUHQWKHVLVDUHWKRVHWKDWPD\RUPD\QRWEHSUHVHQWLQDFRPSDWLEOHPRGXOH VPRGHO,' ȫ 6ODVKHVEHWZHHQRQHRUPRUHLWHPVLQGLFDWHVWKDWHLWKHURIWKRVHLWHPVPD\EHWKHRQHWKDWLVSUHVHQWLQDPRGXOH VPRGHO,' ȫ 3OHDVHVHHWKH6)08/&RQVWUXFWLRQ'DWD5HSRUWDW8QLUDFFRPWRHQVXUHWKHH[DFWVRODUPRGXOHVHOHFWHGLVDSSURYHGIRUXVHZLWK6)0 ȫ 6)0,QʳQLW\LVQRWFRPSDWLEOHZLWKPRGXOHIUDPHKHLJKWRIOHVVWKDQPPDQGPRUHWKDQPP6HH0RGXOH0RXQWLQJVHFWLRQSDJHIRUIXUWKHULQIRUPDWLRQ Panasonic (939[[[+.3. 9%+1[[[6$ 6$ 9%+1[[[6$ 6$ 9%+1[[[6$(* 6$( 9%+1[[[.$ .$ .$ 9%+1[[[=$9%+1[[[=$ 9%+1[[[=$9%+1[[[=$ Peimar 6*[[[0)%%) Phono Solar 3636 Prism Solar P72 Series 4&HOOV 3OXV3UR3HDN****** 3UR3HDN/*/*/*/*/* 43($.'82%/.* 43($.'82%/.*76 43($.'82%/.* 43($.'82/*%)) 43($.'82%/.0/* 43($.'82;/*** 43($.'82%/.0/* 43($.'82;/*FG REC $OSKD%ODFN3XUH 13HDN%ODFN 13HDN%ODFN PEAK Energy Series PEAK Energy BLK2 Series PEAK Energy 72 Series 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS AUTHORIZATION TO MARK Applicant:Manufacturer: Address: Country:2 Standard(s): Product: Brand Name: Models: Unirac, Inc 1411 Broadway Blvd NE Albuquerque, NM 87102 USA 5HGDFWHGLQIRUPDWLRQ Party Authorized To Apply Mark:Same as Manufacturer Report Issuing Office:Intertek Testing Services NA, Inc., Lake Forest, CA Control Number:5003705 Authorized by: for L. Matthew Snyder, Certification Manager This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:24Mar2021] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2022SEP28 Unirac SFM Unirac This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. c.,,,Lake Forest, CA or L. Matthew Snyder, Certificatio Page 1 of 4 ATM for Report 102393982LAX-002 ATM Issued: 27-Oct-2022 ED 16.3.15 (1-Jul-2022) Mandatory AUTHORIZATION TO MARK Applicant:Manufacturer: Address: Country:3 Standard(s): Product: Brand Name: Models: Unirac, Inc 1411 Broadway Blvd NE Albuquerque, NM 87102 USA 5HGDFWHGLQIRUPDWLRQ Party Authorized To Apply Mark:Same as Manufacturer Report Issuing Office:Intertek Testing Services NA, Inc., Lake Forest, CA Control Number:5014989 Authorized by: for L. Matthew Snyder, Certification Manager This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:24Mar2021] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2022SEP28 Unirac Unirac SFM This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. nc.,,Lake Forest, CA or L. Matthew Snyder, Certificatio Page 2 of 4 ATM for Report 102393982LAX-002 ATM Issued: 27-Oct-2022 ED 16.3.15 (1-Jul-2022) Mandatory 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS AUTHORIZATION TO MARK Applicant:Manufacturer: Address: Country:4 Standard(s): Product: Brand Name: Models: Unirac, Inc 1411 Broadway Blvd NE Albuquerque, NM 87102 USA 5HGDFWHGLQIRUPDWLRQ Party Authorized To Apply Mark:Same as Manufacturer Report Issuing Office:Intertek Testing Services NA, Inc., Lake Forest, CA Control Number:5019851 Authorized by: for L. Matthew Snyder, Certification Manager This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:24Mar2021] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2022SEP28 Unirac Unirac SFM This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. akekekekek Forest, CA Matthew Snyder Certification Ma Page 3 of 4 ATM for Report 102393982LAX-002 ATM Issued: 27-Oct-2022 ED 16.3.15 (1-Jul-2022) Mandatory AUTHORIZATION TO MARK Applicant:Manufacturer: Address: Country:5 Standard(s): Product: Brand Name: Models: Unirac, Inc 1411 Broadway Blvd NE Albuquerque, NM 87102 USA 5HGDFWHGLQIRUPDWLRQ Party Authorized To Apply Mark:Same as Manufacturer Report Issuing Office:Intertek Testing Services NA, Inc., Lake Forest, CA Control Number:5021866 Authorized by: for L. Matthew Snyder, Certification Manager This document supersedes all previous Authorizations to Mark for the noted Report Number. Unirac SFM This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:24Mar2021] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2022SEP28 Unirac This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Lake Forest, CA L.Matthew Snyder, Certification M Page 4 of 4 ATM for Report 102393982LAX-002 ATM Issued: 27-Oct-2022 ED 16.3.15 (1-Jul-2022) Mandatory 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS Listing Constructional Data Report (CDR) Report Number 102393982LAX-002 Original 11-Apr-2016 Revised: 5-Oct-2022 Standard(s) Applicant Manufacturer 2 Address Address Country Country Contact Contact Phone Phone FAX FAX Email Email Manufacturer 3 Manufacturer 4 Address Address Country Country Contact Contact Phone Phone FAX FAX Email Email Manufacturer 5 Address Country Contact Phone FAX 505-462-2190 505-843-1418 NA klaus.nicolaedis@unirac.com toddg@unirac.com 1411 Broadway Blvd NE Albuquerque, NM 87102 USA Klaus Nicolaedis Todd Ganshaw 1.0 Reference and Address Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:24Mar2021] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Unirac, Inc Page 1 of 138 Listing Constructional Data Report (CDR) Report Number 102393982LAX-002 Original 11-Apr-2016 Revised: 5-Oct-2022 1.0 Reference and Address Email Page 2 of 138 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS Report No. 102393982LAX-002 Unirac, Inc Page 3 of 138 Issued: 11-Apr-2016 Revised: 5-Oct-2022 Product Brand name 2.0 Product Description Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2022SEP28 Unirac Description The product covered by this report is the Sun Frame Micro Rail roof mounted Photovoltaic Rack Mounting System. This system is designed to provide bonding and grounding to photovoltaic modules. The mounting system employs anodized or mill finish aluminum brackets that are roof mounted using the slider, outlined in section 4 of this report. There are no rails within this product, whereas the 3" Micro Rail, Floating Splice, and 9" Attached Splice electrically bond the modules together forming the path to ground. The Micro Rails are installed onto the module frame by using a stainless steel bolt anodized with black oxide with a stainless type 300 bonding pin, torqued to 20 ft-lbs, retaining the modules to the bracket. The bonding pin of the Micro Rail when bolted and torqued, penetrate the anodized coating of the photovoltaic module frame (at bottom flange) to contact the metal, creating a bonded connection from module to module. The grounding of the entire system is intended to be in accordance with the latest edition of the National Electrical Code, including NEC 250: Grounding and Bonding, and NEC 690: Solar Photovoltaic Systems or the Canadian Electrical Code, CSA C22.1 Part 1 in accordance to the revision in effect in the jurisdiction in which the project resides. Any local electrical codes must be adhered in addition to the national electrical codes. The Grounding Lug is secured to the photovoltaic module, torqued in accordance with the installation manual provided in this document. Other optional grounding includes the use of the Enphase UL2703 certified grounding system, which requires a minimum of 2 micro-inverters mounted to the same rail, and using the same engage cable. ED 16.3.15 (1-Jul-2022) Mandatory Report No. 102393982LAX-002 Unirac, Inc Page 4 of 138 Issued: 11-Apr-2016 Revised: 5-Oct-2022 2.0 Product Description Models Model Similarity Other Ratings Ratings Fuse Rating: 30A Module Orientation: Portrait or Landscape Maximum Module Size: 17.98 ft² UL2703 Design Load Rating: 33 PSF Downward, 33 PSF Upward, 10 PSF Down-Slope Tested Loads - 50 psf/2400Pa Downward, 50psf/2400Pa Uplift, 15psf/720Pa Down Slope Trina TSM-255PD05.08 and Sunpower SPR-E20-327 used for Mechanical Loading Increased size ML test: Maximum Module Size: 22.3 ft² UL2703 Design Load Rating: 113 PSF Downward, 50 PSF Upward, 30 PSF Down-Slope LG355S2W-A5 used for Mechanical Loading test. Mounting configuration: Four mountings on each long side of panel with the longest span of 24" UL2703 Design Load Rating: 46.9 PSF Downward, 40 PSF Upward, 10 PSF Down-Slope LG395N2W-A5, LG360S2W-A5 and LG355S2W-A5 used for used for Mechanical Loading test. Mounting configuration: Six mountings for two modules used with the maximum span of 74.5" IEC 61646 Test Loads - 112.78 psf/5400Pa Downward, 50psf/2400Pa Uplift Mechanical Load test to add FlashLoc Slider and Trim Assemblies to UL2703 and IEC 61646 Certifications, & Increase SFM System UL2703 Module Size: Maximum Module Size: 27.76 ft² UL2703 Design Load Rating: 113 PSF Downward, 50 PSF Upward, 21.6 PSF Down-Slope Jinko Eagle 72HM G5 used for Mechanical Loading test. Mounting configuration: Four mountings on each long side of panel with the longest span of 24" Mamzimum module size: 21.86 ft2 IEC 61646 Test Loads - 112.78 psf/5400Pa Downward, 75psf/3600Pa Uplift SunPower model SPR-A430-COM-MLSD used for Mechanical Loading Fire Class Resistance Rating: - Class A for Steep Slope Applications when using Type 1 Modules. Can be installed at any interstitial gap. Installations must include Trim Rail. - Class A for Steep Slope Applications when using Type 2 Modules. Can be installed at any interstitial gap. Installations must include Trim Rail. - Class A Fire Rated for Low Slope applications with Type 1 or 2 listed photovoltaic modules. This system was evaluated with a 5” gap between the bottom of the module and the roof’s surface See section 7.0 illustractions # 1, 1a and 1b for a complete list of PV modules evaluated with these racking systems Unirac SFM NA NA ED 16.3.15 (1-Jul-2022) Mandatory 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS Report No. 102393982LAX-002 Unirac, Inc Page 42 of 138 Issued: 11-Apr-2016 Revised: 5-Oct-2022 7.0 Illustrations Illustration 1 - Approved PV Modules ED 16.3.15 (1-Jul-2022) Mandatory Report No. 102393982LAX-002 Unirac, Inc Page 43 of 138 Issued: 11-Apr-2016 Revised: 5-Oct-2022 7.0 Illustrations Illustration 1a - Approved PV Modules Continue ED 16.3.15 (1-Jul-2022) Mandatory 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS Report No. 102393982LAX-002 Unirac, Inc Page 44 of 138 Issued: 11-Apr-2016 Revised: 5-Oct-2022 7.0 Illustrations Illustration 1b - Approved PV Modules Continue ED 16.3.15 (1-Jul-2022) Mandatory