Loading...
HomeMy WebLinkAbout18136 Hinckley Ave SurveyHINCKLEY AVENUE5 Drainage and Utility Easement I I IIIII IIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>I I I>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>GGGGGGGEX CB RIM=1036.18 EX CB RIM=1036.21 U Drain Tile Cleanout Building Setback 725 7355 510 N:177875.96 E:520374.58 1031. 9 3 1036 . 1 3 1033. 8 5 1035.29 1036. 7 4 N00°46'19"W70.00S01°00'25"E70.00N89°13'41"E 152.36 S89°13'41"W 152.65 10.3010.3028.009.709.70Planned Trail2424.51033 1033 1034 1035 1036 1037 10371037 N:177860.66 E:520359.90 1034103010291028102710 2 6 102610301032102810301035 PROPOSED HOUSE PROPOSED GARAGE PROPOSED DRIVEWAY 5.8% SLOPE 10271037103710351036 1035103010 3 0 10 2 9 10 2 8 1033 10321031102710261 0 2 5 1 0 2 9 . 6 0 10 2 9 . 6 0 10 3 4 . 2 3 10 3 3 . 9 9 1037.60 1037.261035.501036.40103 7 . 8 0 1036.25 10 3 2 . 9 0 10 3 1 . 1 2 10 3 4 . 1 4 10 3 6 . 6 2 1037.1210 2 7 . 3 0 10 2 5 . 3 9 10 3 4 . 5 6 119.2 10271026103210301028103034.00 17.548.00 10.462.00 22.0022.46 10.0021.54 40.008.0 7.018136 Hinckley Ave. 1036. 4 5 1034.3 3 1028. 1 0 1031. 9 9 30.5 10.378.06 77.99.7Curb Stop 25303 L5B4 DATE REVISION SCHEDULE DESCRIPTION BY PROJECT NO. CAD FILE NAME DRAWN BY DESIGNED BY ORIGINAL ISSUE DATE CLIENT PROJECT NO. REVIEWED BY PROJECT SHEET TITLE WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,FILE LOCATION: S:\PROJECTS\25000 PROJ\25300-25399\25303 STREEFLAND PROPERTY - LENNAR - LAKEVILLE MN\25303 CIVIL-SURVEY\SURVEY PRODUCTION DRAWINGS\LOT CERTS\BLOCK 4\LOT 5\25303 L5B4.DWG 1OF CERTIFICATE OF SURVEY 1 - 21-25303 1/26/23 LAKEVILLE MINNESOTA JW - MAS LENNAR CORPORATION CASLANO LOT 5, BLOCK 4 I HEREBY CERTIFY THAT THIS SURVEY, PLAN, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE LIC. NO.1/26/23 45817 MARK A, SCHWANZ CONSTRUCTION NOTES: 1.Install rock construction entrance. 2.Install silt fence as needed for erosion. 3.Sidewalks shall drain away from house a minimum of 1%. 4.Contractor must verify driveway design. 5.Contractor must verify service elevation prior to construction. 6.Add or remove foundation ledge as required. GENERAL NOTES: 1.Grading plan by ISG last dated May 9, 2022 was used to determine proposed elevations shown hereon. 2.This survey does not purport to show improvements or encroachments, except as shown, as surveyed by ISG or under my direct supervision. 3.Proposed building dimensions shown are for horizontal location of structures on the lot only. Contact builder prior to construction for approved construction plans. 4.No specific soil investigation has been performed on this lot by the surveyor. The suitability of soils to support the specific house proposed is not the responsibility of the surveyor. 5.If building footprint exceeds the building pad, additional earthwork and testing will be required to meet the requirements as outlined within the geotechnical report. 6.This certificate does not purport to show easements other than those shown on the recorded plat. 7.Bearings shown are based on the Final Plat. 8.Site address is 18136 Hinckley Avenue, Lakeville, MN 55044 9.House/Basement type: Sinclair EH01 A3 - Right - Walkout 10.Building dimensions shown are based on First Floor Plan. 11.Proposed Contours are shown hereon. 12.Topographic survey was completed on January 25, 2023. BENCHMARK: Top nut fire hydrant located in the NE quadrant of Hideaway Trail and Highview Avenue. Elevation = 1038.03 feet AREA TABLE: House/Garage Area = 1,788 sq. ft. Porch Area = 56 sq. ft. Driveway/Walk Area = 967 sq. ft. Total Impervious Area = 2,811 sq. ft. Lot Area = 10,675 sq.ft. Impervious Coverage = 26.3% HOUSE ELEVATIONS:Proposed/As-Built Garage Floor = 1037.8 Top of Foundation = 1038.1 Lowest Floor = 1030.1 Lowest Opening = 1030.1 LEGEND Proposed Building Sanitary Line Water Line Storm Line Underground Gas Line Curb Stop Fire Hydrant Water Valve Manhole/Catch Basin Light Pole Utility Pedestal > >> I Set Lath at Property Corner Offset Iron Existing Contour Proposed Contour Proposed Elevation Proposed Spot Elevation Existing Spot Elevation Surface Drainage Direction Proposed Tree/Shrub 982.2 982 982. 5 985.0 5 AA PA PB PS QE TT GRADING QUANTITIES (CY) Common Cut -121 Common Fill 253 Total (±)132 Note: Cut and fill quantities include building excavation, driveway, and lot grading. U G 2/8/23 House placement and grading updates JW House re-stake2/13/23 JW 0 SCALE IN FEET 10 20 Cert. revisions2/13/23 MAS Zoning = RS-4 FY - 20' House, 25' Garage SY - 7' Interior, 20' Corner RY - 30' SY Buffer - 30' RY Buffer - 50' The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Draintile connection required. ENGINEERING REVIEWED Date:__________________03/03/2023 asobottka