Loading...
HomeMy WebLinkAbout17926 Hidden Creek Tr SurveyZoning = RS-4 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________10/12/2022 lritchie