Loading...
HomeMy WebLinkAbout17871 Hamburg Avenue-SURVEYPlanning DepartmentApprovedDate:__________________03/17/2023 kjenson The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Draintile connection required. ENGINEERING REVIEWED Date:__________________03/17/2023 asobottka