HomeMy WebLinkAbout17871 Hamburg Avenue-SURVEYPlanning DepartmentApprovedDate:__________________03/17/2023 kjenson
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the
landscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________03/17/2023 asobottka