HomeMy WebLinkAboutLA211930 - APPROVED - PE Calcs_SCOTT CONNELYCode 2020 Minnesota Building Code (ASCE 7-16)
Risk category II Wind Load (component and Cladding)
Roof Dead Load Dr 10 psf V 115 mph
PV Dead Load DPV 3 psf Exposure C
Roof Live Load Lr 20 psf
Ground Snow S 50 psf
If you have any questions on the above, please do not hesitate to call.
Sincerely,
3/10/2023
RE: Structural Certification for Installation of Residential Solar
SCOTT CONNELY: 7039 182ND ST W, LAKEVILLE, MN 55044
Attn: To Whom It May Concern
This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the
PV system to existing roof framing. From the field observation report, the roof is made of Asphalt Shingle
roofing over roof plywood supported by 2X4 Trusses at 24 inches. The slope of the roof was approximated to
be 26.57 and 39.81 degrees.
After review and based on our structural capacity calculation, the existing roof framing has been determined to
be adequate to support the imposed loads without structural upgrades. Contractor shall verify that existing
framing is consistent with the described above before install. Should they find any discrepancies, a written
approval from SEOR is mandatory before proceeding with install. Capacity calculations were done in
accordance with applicable building codes.
Design Criteria
Concept Approval ONLYSubject to Field Inspection
Inspector Date
2020
MN Bldg
Code
05/05/2023dpfannenstein
Please provide a City
Approved Plan and Permit
Card on site accessible for
Inspectors until final inspection
Structural Letter for PV Installation
Date: 3/10/2023
Job Address:7039 182ND ST W
LAKEVILLE, MN 55044
Job Name:SCOTT CONNELY
Job Number:230310SC
Scope of Work
Table of Content
Sheet 1 Cover2Attachment checks3Snow and Roof Framing Check
4 Seismic Check and Scope of work
Engineering Calculations Summary
Code 2020 Minnesota Building Code (ASCE 7-16)
Risk category II
Roof Dead Load Dr 10 psf
PV Dead Load DPV 3 psf
Roof Live Load Lr 20 psf
Ground Snow S 50 psf
Wind Load (component and Cladding)
V 115 mph
Exposure C
References
2 NDS for Wood Construction
Sincerely,
This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the
PV system to existing roof framing. All PV mounting equipment shall be designed and installed per
manufacturer's approved installation specifications.
Wind Load Cont.
115 mph ASCE 7-16 Figure 26.5-1B
C
1.0 ASCE 7-16 Sec 26.8.2
0.85 ASCE 7-16 Table 26.10-1
0.85 ASCE 7-16 Table 26.6-1
0.96 ASCE 7-16 Table 26.9-1
23.60 psf
26.57 Degrees
1.5 Conservatively assuming all exposed
0.8 conservatively assuming 10 ft2 effective area
Uplift (W)Zone(1,2e) Zone(2r, 2n) Zone(3e)Zone(3r)
Fig. 30-3-2 GCp=-1.3 -1.7 -1.7 -1.8
Eq. 29.4-7 P=qh(GCp)(γE)(γa)=-36.82 -48.15 -48.15 -50.98
GCp=0.6 Figure 30.3-2
P=qh(GCp)(γE)(γa)=16.99 Equation 29.4-7
Rafter Attachments: 0.6D+0.6W (CD=1.6)
Connection Check
Attachment max. spacing=4 ft
5/16" Lag Screw Withdrawal Value=266 lbs/in Table 12.2A - NDS
2.5 in DFL Assumed
Prying Coefficient 1.4
Allowable Capacity= 760 lbs
Zone Trib Width Area (ft) Uplift (lbs) Down (lbs)
Zone(1,2e)4 11.0 129.9 108.7
Zone(2r, 2n)4 11.0 166.8 108.7
Zone(3e)4 11.0 166.8 108.7
Zone(3r)4 11.0 176.0 108.7
Conservative Max=176.0 <760
CONNECTION IS OK
2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw.
Embedment in sheading or other material does not count.
II
Wind Speed (3s gust), V =
Exposure =
1. Pv seismic dead weight is negligible to result in significant seismic uplift, therefore the wind uplift
governs
γE=
γa=
KZt =
qh= 0.00256KzKztKdKeV2=
Pitch =
Lag Screw Penetration
Risk Category =
KZ =
Kd =
Ke =
Vertical Load Resisting System Design
Roof Framing Trusses
Snow Load Fully Exposed
pg= 50 psf
Ce =0.9
Ct =1.1
Is =1.0
pf =35 psf
pfmin. = 34.7 psf
ps = 35 psf CS= 0.7 46.7 plf
Max Length, L =6.0 ft (Beam maximum Allowable Span)
Tributary Width, WT =24 in
Dr =10 psf 20 plf
PvDL =3 psf 6 plf
Load Case: DL+0.75(0.6W+S)
0.75(Pnet+Ps)+ Ppvcos(θ)+PDL=71 plf
Mdown=197 lb-ft
Mallowable = Sx x Fb' (wind)=634 lb-ft >197 lb-ft OK
Load Case: DL+S
Ps+ Ppvcos(θ)+PDL=72 plf
Mdown=168 lb-ft
Mallowable = Sx x Fb' (wind)=456 lb-ft >168 lb-ft OK
Load Case: DL+0.6W
Pnet+ Ppvcos(θ)+PDL=39.6 plf
Max Moment, Mu=110 lb-ft
Mallowable = Sx x Fb' (wind)=634 lb-ft >110 lb-ft OK
Pv max Shear=108.7 lbs
Shear, Vu=wL/2+Pv Point Load =187 lbs
Max Shear, Vu=wL/2+Pv Point Load =216 lb
Member Capacity
DF-L No.2
2X4 CL CF Ci Cr KF φ λ
Fb =900 psi 1.0 1.5 1.0 1.15 2.54 0.85 0.8 1553 psi
Fv =180 psi N/A N/A 1.0 N/A 2.88 0.75 0.8 180 psi
E =1600000 psi N/A N/A 1.0 N/A N/A N/A N/A 1600000 psi
Emin =580000 psi N/A N/A 1.0 N/A 1.76 0.85 N/A 580000 psi
Depth, d =3.5 in
Width, b =1.5 in
Cross-Sectonal Area, A = 5.25 in2
Moment of Inertia, Ixx =5.35938 in4
Section Modulus, Sxx =3.0625 in3
Allowable Moment, Mall = Fb'Sxx =396.2 lb-ft DCR=Mu/Mall =0.37 < 1 Satisfactory
Allowable Shear, Vall = 2/3Fv'A =630.0 lb DCR=Vu/Vall =0.23 < 1 Satisfactory
Design Value Adjusted Value
Siesmic Loads Check
Roof Dead Load 10 psf
% or Roof with Pv 19.9%
Dpv and Racking 3 psf
Average Total Dead Load 10.6 psf
Increase in Dead Load 3.0%OK
The increase in seismic Dead weight as a result of the solar system is less than 10% of the existing structure and
therefore no further seismic analysis is required.
Limits of Scope of Work and Liability
We have based our structural capacity determination on information in pictures and a drawing set titled PV plans -
SCOTT CONNELY. The analysis was according to applicable building codes, professional engineering and design
experience, opinions and judgments. The calculations produced for this Structure's assessment are only for the
proposed solar panel installation referenced in the stamped plan set and were made according to generally
recognized structural analysis standards and procedures.