Loading...
HomeMy WebLinkAbout18832 Javelin Path-SurveyZoning = RS-3FY - 30'SY - 10' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Draintile connection required. ENGINEERING REVIEWED Date:__________________04/14/2023 asobottka