Loading...
HomeMy WebLinkAbout20404 Galveston Place-SurveySTO Drainage a n d U t i l i t y E a s e m e n t per the pl a t o f C E D A R H I L L S 3RD AD D I T I O N Proposed House Springfield EN06, Elev. A3 Full Basement Lowest Floor Elev. = (1021.03) 1 22021GARGOYLE LANEWATWATWATWATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT WAT WA T20211 2STOSTOSTOSTOSTOSTO STOSTOSANSANSANSANSANSAN SANSANSANSA N SA N SAN SAN SAN SAN SAN SAN SANBuilding Pad per Grading PlanBuilding Setback1010 105 5 101010 LOT 1 10 (1026.9) GALVES T O N P L A C E N77°01 ' 1 2 " W 9 5 . 5 1 N14°00'49"E 132.57L=63.82R=310.00Δ=11°47'45"1026.8 N77°33' 4 1 " W 8 0 . 3 7 L=4.95 R=180. 0 0 Δ=1°34 ' 3 0 "N12°26'19"E 69.98(1024.0) 1024.2 (1027.8) 1027.1 (1025.1) 1024.9 S S S 60.00 foot Public Right of Way25.50Garage Porch (1026.16) X 1026.4 2 T C X 1025.74TC X1024.4 5 R E X 1024.6 2 R E X 1025.5 1 T C X 1026.4 2 T C X 1026.8 6 R E X Propo s e d S i d e w a l kProposed SidewalkProposed Sidewalk15.00 39.75 20.31 29.385.13 20.5010.002.0020.0017.756. 19 10.5029.7522.1314.87 23.76 25.5851.8955.101027.36 1025.26 1026.56 1025.75 60.00 foo t P u b l i c R i g h t o f W a y (1028.70) (1 0 2 8 . 2 ) X 15.006.120.12 4.335.83 4.33Egress Well X (1028.4)X (1028 .4 ) X (1027.9) X (1027.9)Sidewalk(9.5%)Drain Tile 1028 1026 1026 10241028 102810261028 1028 1 02 6 1025 . 0 7 T C X 1026.0 9 T C X 1026.8 8 T C X 1027.36TC X CS CO CO TV X 1 0 2 6 . 4 1025. 9 X 1027.0 X X 10 2 5. 5 166584. 6 0 N 527381. 1 1 E 166574.54 N 527354.45 E 166598.63 N 527339.81 E 166723.00 N527360.00 E 166692.05 N527455.84 E 166696.65 N527456.94 E Drain TileCleanout13.81 27.26 55.6555.281024 16.00 21.67 N:\0025850.01\DWG\SURVEY\3RD ADD\0025850.01B10L01 3RD.DWGMJW BTW .FIELD CREW: DRAWN: CHECKED: Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Œ:HVWZRRG3URIHVVLRQDO6HUYLFHV,QF Lakeville, Minnesota Cedar Hills Certificate of SurveyLennar PROJECT NUMBER: 0025850.01 0'20'40' 1) Curb & gutter and utilities are existing. 2) Building dimensions do not reflect brick facing. 3) Grading Plan by Westwood Professional Services Inc. initial submittal date 02/06/20. 4) Building shown reflects Springfield foundation plan, sheet A2, dated 03/01/2023. Lot 1, Block 10, CEDAR HILLS 3RD ADDITION, according to the recorded plat thereof, Dakota County, Minnesota. Address- 20404 Galveston Place LEGEND CABLE TV BOXTV NATURAL GAS METERG STREET LIGHT ELECTRIC BOXE ELECTRIC METERE SANITARY MANHOLES SEWER CLEANOUTCO CATCH BASIN STORM MANHOLEST TELEPHONE BOXT GATE VALVE HYDRANT WATER METERW CURB STOP BOXCS WATERMAIN SANITARY SEWER STORM SEWER SAN STO WAT FLARED END SECTION Garage Floor Elev. = (1028.70)(at overhead door) Top of Poured Foundation Wall Elev. = (1029.03) Lowest Floor Elev. = (1021.03) I hereby certify that this survey was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. 04/19/2023 Mathew J. Welinski Date Minnesota License No. 53596 matt.welinski@westwoodps.com Denotes iron monument foun Denotes iron monument set x xxx.x Denotes existing elevati x (xxx.xx) Denotes proposed eleva Benchmark- Minnesota Department of Transportation Control Point "1914 H", Elevation 959.11 (N.A.V.D. 1988), no graphically shown. IMPERVIOUS SURFACE CALCULATIONS Lot area = 11,716 sq. ft. House area = 1,863 sq. ft. Porch area = 82 sq. ft. Driveway and Sidewalk = 764 sq. ft. Impervious area 2,709 sq. ft. / 23.1% of total of lot area LOT GRADING CALCULATIONS Basement Excavation = -233 cubic yards Finished Lot Grading= +208 cubic yards Swell Factor (10%)= +21 cubic yards Material (excess)-4 cubic yards NW Quarter, Section 27, Township 114, Range 20 Zoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' Corner RY - 30'SY Buffer - 30'RY Buffer - 50' The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Draintile connection required. ENGINEERING REVIEWED Date:__________________04/19/2023 asobottka