Loading...
HomeMy WebLinkAbout17863 Hamburg Avenue SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Draintile connection required. ENGINEERING REVIEWED Date:__________________08/19/2022 lritchie Planning DepartmentApprovedDate:__________________08/26/2022 kjenson