HomeMy WebLinkAbout8165 186th Street West - SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________04/14/2023 asobottka
Planning DepartmentApprovedDate:__________________05/18/2023 dmorey