Loading...
HomeMy WebLinkAbout18637 Hamel Drive - SurveyThe curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Draintile connection required. ENGINEERING REVIEWED Date:__________________06/08/2023 asobottka Planning DepartmentApprovedDate:__________________06/15/2023 dmorey