HomeMy WebLinkAboutLA214955 - APPROVED - 4109-123023-198315-10607-PermitPlanSet (11)GENERAL NOTES1.1.1PROJECT NOTES:1.1.2 THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL ELECTRICCODE (NEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND INSTALLATIONINSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVINGJURISDICTION’S (AHJ) APPLICABLE CODES.1.1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEMINSPECTED PRIOR TO PARALLEL OPERATION1.1.4 GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITHTHE MICROINVERTER IN ACCORDANCE WITH NEC 690.41(B)1.1.5 ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, ANDSOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE INPHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY1.1.6 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENTFOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO NEC 690.7.1.1.7 ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCECIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BEIDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLEDACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [NEC 110.3].1.1.8 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IFEXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILLBE INSTALLED AS REQUIRED BY THE NEC AND AHJ.1.2.1 SCOPE OF WORK:1.2.2 PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THEGRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BERESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN,SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THEPHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT.*NEC2017M1.3.1 WORK INCLUDES:1.3.2 PV ROOF ATTACHMENTS - IRONRIDGE FLASHFOOT21.3.3 PV RACKING SYSTEM INSTALLATION - IRONRIDGE XR-1001.3.4 PV MODULE AND INVERTER INSTALLATION - HANWHA Q-CELLS Q.PEAK DUO ML-G10+ 400/ ENPHASE IQ8PLUS-72-2-US1.3.5 PV EQUIPMENT GROUNDING1.3.6 PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX1.3.7 PV INSTALLING SYSTEM MONITORING EQUIPMENT1.3.8 PV LOAD CENTERS (IF INCLUDED)1.3.9 PV METERING (IF INCLUDED)1.3.10 PV DISCONNECTS1.3.11 PV GROUNDING ELECTRODE & BONDING TO (E) GEC1.3.12 PV FINAL COMMISSIONING1.3.13 (E) ELECTRICAL EQUIPMENT RETROFIT FOR PVOWNERNAME:VIJAYA MANIKANDAN MOHANA VIJAYANAUTHORITIES HAVING JURISDICTIONBUILDING: CITY OF LAKEVILLEZONING: CITY OF LAKEVILLEUTILITY: DAKOTA ELECTRICDESIGN SPECIFICATIONSOCCUPANCY: ІІCONSTRUCTION: SINGLE-FAMILYZONING:RESIDENTIALGROUND SNOW LOAD: 50 PSFWIND EXPOSURE: CWIND SPEED: 115 MPHAPPLICABLE CODES & STANDARDSBUILDING: MSBC 2020RESIDENTIAL: MSRC 2020ELECTRICAL: NEC 2017FIRE:MSFC 2020PROJECT INFORMATIONPROJECT MANAGERNAME: KEVIN VICKERSPHONE: 763-412 5714CONTRACTORNAME: GOLDEN ELECTRIC LLCPHONE: 763-412 5714BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843T-001.00COVER PAGE(SHEET 1)01AERIAL PHOTONOT TO SCALENEWS02PLAT MAPNOT TO SCALESHEET LIST TABLESHEET NUMBERSHEET TITLET-001COVER PAGEG-001NOTESA-101SITE PLANA-102ELECTRICAL PLANA-103SOLAR ATTACHMENT PLANE-601LINE DIAGRAME-602DESIGN TABLESE-603PLACARDSS-501ASSEMBLY DETAILSR-001RESOURCE DOCUMENTR-002RESOURCE DOCUMENTR-003RESOURCE DOCUMENTR-004RESOURCE DOCUMENTR-005RESOURCE DOCUMENTR-006RESOURCE DOCUMENTHAMMOND DRNEW PV SYSTEM:8.000 kWp DC / 5.800 kWp ACVIJAYAN RESIDENCE18761 HAMMOND DRLAKEVILLE, MN 55044ASSESSOR'S #: 221201404130SCOPE OF WORKSYSTEM SIZE:ATTACHMENT TYPE:MSP UPGRADE:STC: 20 X 400W = 8.000KWPTC: 20 X 373.5W = 7.470KW(20) HANWHA Q-CELLS Q.PEAK DUO ML-G10+ 400(20) ENPHASE IQ8PLUS-72-2-USIRONRIDGE FLASHFOOT2NO
2.1.1SITE NOTES:2.1.2 A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS.2.1.3 THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITYINTERACTIVE SYSTEM WITH NO STORAGE BATTERIES.2.1.4 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDINGROOF VENTS.2.1.5 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICALEQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26.2.1.6 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITHTHIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOFCOVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE.2.2.1EQUIPMENT LOCATIONS:2.2.2 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26.2.2.3 WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATINGTEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLE 310.15 (B)(2)(A).2.2.4 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC690.34.2.2.5 ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHINSIGHT OF THE AC SERVICING DISCONNECT.2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TONEC APPLICABLE CODES.2.2.7 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHENAPPROPRIATE.2.3.1STRUCTURAL NOTES:2.3.2 RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANTINSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES,AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THEARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS.2.3.3 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IFROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS.2.3.4 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/ APPROVEDCHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR.2.3.5 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCESPECIFIED BY THE RACKING MANUFACTURER.2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGSTTHE ROOF FRAMING MEMBERS.2.4.1WIRING & CONDUIT NOTES:2.4.2 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT ANDWIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANTTO LIMIT UP-SIZING.2.4.3 CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7.2.4.4 VOLTAGE DROP LIMITED TO 1.5%.2.4.5 DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BELOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS.2.4.6 AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GRAYIN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKEDORANGE [NEC 110.15].2.5.1GROUNDING NOTES:2.5.2 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDINGDEVICES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE.2.5.3 PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE250.122.2.5.4 METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDEREDGROUNDED IN ACCORD WITH 250.134 AND 250.136(A).2.5.5 EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 ANDMICROINVERTER MANUFACTURERS' INSTRUCTIONS.2.5.6 EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN INMANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED,MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLESPER THE MANUFACTURERS' INSTALLATION REQUIREMENTS.2.5.7 THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVALOF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE.2.5.8 GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN ORMARKED GREEN IF #4 AWG OR LARGER [NEC 250.119]2.5.9 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODESYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ.2.5.10 GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.41(B)(1) AND (2) TO REDUCE FIREHAZARDS2.6.1 DISCONNECTION AND OVER-CURRENT PROTECTION NOTES:2.6.2 DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THECONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINESIDE” (TYPICALLY THE UPPER TERMINALS).2.6.3 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE AVISIBLE-BREAK SWITCH2.6.4 PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWNFUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN ACCORDANCE WITH690.12(A) THROUGH (D).2.6.5 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240.2.6.6 MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES INACCORDANCE WITH NEC 110.3(B).2.6.7 IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TONEC 690.11 AND UL1699B.2.7.1INTERCONNECTION NOTES:2.7.2 LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 705.12 (B)]2.7.3 THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THERATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120PERCENT OF THE AMPACITY OF THE BUSBAR, PV DEDICATED BACKFEED BREAKERS MUST BELOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(B)(2)(3)].2.7.4 AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL RATING OF ALLOVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THECOMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (B)(2)(3)(C).2.7.5 FEEDER TAP INTERCONNECTION (LOAD SIDE) ACCORDING TO NEC 705.12 (B)(2)(1)2.7.6 SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCECONDUCTORS IN ACCORDANCE WITH NEC 230.422.7.7 BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT FROMADDITIONAL FASTENING [NEC 705.12 (B)(5)].*NEC2017M *NEC2017M BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843G-001.00NOTES(SHEET 2)
A-101.00SITE PLAN(SHEET 3)ENTRANCEBFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA79684301/16" = 1'-0"SITE PLAN018' 16'NEWSNEWSAREA OF WORKPROPERTY LINEGENERAL NOTES1. FIELD VERIFY ALL MEASUREMENTS2. ITEMS BELOW MAY NOT BE ON THIS PAGEHAMMOND DRAC COMBINER BOXUTILITY AC DISCONNECTPV METERUTILITY METER38'-7"6'-3"72'-6"27'-7"
MODULE:HANWHA Q-CELLSQ.PEAK DUO ML-G10+ 400400 WATTS41.1"74"BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843A-102.00ELECTRICAL PLAN(SHEET 4)01/8" = 1'-0"ELECTRICAL PLAN014' 8'NEWSAMODULE STRINGINGBMODULE STRINGINGFIRE CLEARANCEGENERAL NOTES1. FIELD VERIFY ALL MEASUREMENTS2. ITEMS BELOW MAY NOT BE ON THIS PAGE(N) (1) JUNCTION BOX(N) (1) AC COMBINER BOX(N) (1) UTILITY AC DISCONNECT(N) (1) PV METEREXTERIOR PV EQUIPMENTINTERIOR PV EQUIPMENT(E) (1) UTILITY METER(E) (1) MAIN ELECTRICAL PANELAARRAY 1 - 8.000 KW[x20] (N) MODULESTILT: 20 DEGREESROOF PITCH: 4:12AZIMUTH: 270 DEGREESAAAAAAAAAВВВВВВВВВВ18 IN. FIRE ACCESS PATH18 IN. FIRE ACCESS PATH3 FT. FIRE ACCESS PATH3 FT. FIRE ACCESS PATH18 IN. FIRE ACCESS PATH18 IN. FIRE ACCESS PATHConcept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode07/06/2023dpfannensteinPlease provide a CityApproved Plan and PermitCard on site accessible forInspectors until final inspectionFor each roof plane with a photo-voltaic array, twopathways not less than 36" wide shall be provided fromthe lowest roof edge to ridge on the same roof plane asthe array,on an adjacent roof plane, or straddling thesame and adjacent roof planes. Not fewer than onepathway shall be provided on the street or drivewayside of the house.Not less than an 18" clear setbackis required on both sides of ahorizontal ridge.
MODULE:HANWHA Q-CELLSQ.PEAK DUO ML-G10+ 400400 WATTS41.1"74"BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843A-103.00SOLAR ATTACHMENT PLAN(SHEET 5)01/8" = 1'-0"SOLAR ATTACHMENT PLAN014' 8'NEWSROOF TRUSSESGENERAL NOTES1. FIELD VERIFY ALL MEASUREMENTS2. ITEMS BELOW MAY NOT BE ON THIS PAGEFLUSH MOUNT SOLAR MODULESATTACHED TO ROOF SURFACE (SEESHEET S-501 FOR MOUNTING DETAILS)ROOF MATERIAL IS ASPHALT SHINGLE27'-5"
PV SYSTEM EQUIPPED WITH RAPIDSHUTDOWN DISCONNECT PER NEC 690.12SYSTEM COMPLIANT WITH NEC 690.13EQUIPMENT LEFTOF LINE IS (N) NEWUNLESS OTHERWISE NOTED.EQUIPMENT RIGHTOF LINE IS (E) EXISTINGUNLESS OTHERWISE NOTED.(N) AC COMBINER BOX, 125AENPHASE IQ COMBINER 4(X-IQ-AM1-240-4)120/240V, 1Ø, 3WMAX. CONTINUOUS CURRENT: 65AMAX. OCPD: 90AL1N L2ENPHASE ENVOYCOMMUNICATIONSGATEWAYGCB315ACB120ACB220A2(E) GROUNDINGELECTRODEGROUNDRODTO UTILITYGRID (UG)L1L2N(Е) MAIN ELECTRICAL PANEL240/120 V 1Ø, 3WMAIN BUSS: 200AMAX BREAKER SIZE:(200A X 1.2) - 200A = 40A(E)UTILITYMETERGNTO (E)LOADS(E) MAIN200A34L2L1NL2L1NTAPV
TOP LUGSBOTTOM LUGSM1(N) PV METERMILBANK 200 AMP WITHLEVER BY PASSGSW1F1-2(N) UTILITYAC DISCONNECT, 60AWITH FUSES, 35АBLACKREDGBLACKREDIN BRANCHIN BRANCH1(N) (20) HANWHA Q-CELLSQ.PEAK DUO BLK ML-G10+ 400400 WATTS(N) (20) ENPHASEIQ8PLUS-72-2-USRATED POWER: 290W(N) JUNCTION BOXA10B101. DOUBLE-LUGS REQUIRED ON LINE SIDE OF EXISTING HOUSE METER.2. FUSED АС DISCONNECT SHOULD ВЕ INSTALLED IN ТНЕ OFF POSITION.3. CONTACT ERMU ТО SCHEDULE DISCONNECТ OF POWER АТ HOUSE METERWHEN READY ТО МАКЕ CONNECTIONS.4. ALL WIRING MUST МЕЕТ NEC REQUIREMENTS AND ВЕ INSPECTED PRIORТО INSTALLING ERMU PRODUCTION METER.POC/RPACONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONSID TYPICALCONDUCTORCONDUITCURRENT-CARRYINGCONDUCTORS IN CONDUITOCPDEGCTEMP. CORR.FACTORCONDUIT FILLFACTORCONT.CURRENTMAX. CURRENT(125%)BASE AMP.DERATEDAMP.TERM. TEMP. RATINGAMP. @ TERMINAL1 110 AWG THWN-2, COPPER0.75'' DIA EMT420A6 AWG THWN-2, COPPER0.96 (32.1 °C)0.812.1A15.13A40A 30.72A75°C35A2 18 AWG THWN-2, COPPER0.75'' DIA EMT2N/A6 AWG THWN-2, COPPER0.96 (32.1 °C)124.2A30.25A55A52.8A75°C50A3 18 AWG THWN-2, COPPER0.75'' DIA EMT235A6 AWG THWN-2, COPPER0.96 (32.1 °C)124.2A 30.25A55A52.8A75°C50A4 16 AWG THWN-2, COPPER0.75'' DIA EMT2N/A6 AWG THWN-2, COPPER0.96 (32.1 °C)124.2A30.25A75A72A75°C65ABFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843E-601.00LINE DIAGRAM(SHEET 6)MODULE STRINGINGMODULE STRINGINGAB
SYSTEM SUMMARYBRANCH #1BRANCH #2INVERTERS PER BRANCH1010MAX AC CURRENT12.1A12.1AMAX AC OUTPUT POWER2,900W2,900WARRAY STC POWER8,000WARRAY PTC POWER7,470WMAX AC CURRENT24.2AMAX AC POWER5,800WDERATED (CEC) AC POWER5,800WDISCONNECTSINVERTERSOCPDSMODULESASHRAE EXTREME LOW-35.2°C (-31.4°F), SOURCE: AIRLAKE (44.63°; -93.22°)ASHRAE 2% HIGH32.1°C (89.8°F), SOURCE: AIRLAKE (44.63°; -93.22°)REF.QTY.RATED CURRENTMAX VOLTAGECB1-2 220A240VACCB3 115A240VACF1-2 235A240VACREF.QTY.MAKE AND MODELRATED CURRENT MAX RATED VOLTAGESW1 1EATON DG222NRB OR EQUIV.60A240VACREF.QTY.MAKE AND MODELPMAX PTC ISC IMP VOC VMP TEMP. COEFF. OF VOC FUSE RATINGPM1-20 20HANWHA Q-CELLS Q.PEAK DUO ML-G10+ 400400W 373.5W 11.16A 10.64A 45.06V 37.59V-0.122V/°C (-0.27%/°C)20AREF.QTY.MAKE AND MODELACVOLTAGEGROUNDOCPDRATINGRATEDPOWERMAX OUTPUTCURRENTMAX INPUTCURRENTMAX INPUTVOLTAGECEC WEIGHTEDEFFICIENCYI1-20 20ENPHASE IQ8PLUS-72-2-US240VFLOATING20A 290W1.21A15A 60V97.0%BILL OF MATERIALSCATEGORYMAKEMODEL NUMBERREFQTYUNITQTY/UNITDESCRIPTIONMODULEHANWHA Q-CELLSQ.PEAK DUO ML-G10+ 400PM1-20 20 PIECES 1HANWHA Q-CELLS Q.PEAK DUO ML-G10+ 400 400W 144 HALF-CELLS, MONOCRYSTALLINE SILICONINVERTERENPHASEIQ8PLUS-72-2-USI1-2020PIECES 1ENPHASE IQ8PLUS-72-2-US 290W INVERTERDISCONNECTEATONDG222NRBSW11 PIECE 1EATON DG222NRB, FUSED, 2-POLE, 60A, 240VAC OR EQUIVALENTPRODUCTION METERGENERIC MANUFACTURERGEN-METER-80AM11 PIECE 1ELECTRICAL METER, OWNER APPROVEDMISC ELECTRICAL EQUIPMENTGEN-CABLE-CLIPHDWR23-123 100PIECES 1 GENERIC CABLE CLIPAC COMBINER PANELENPHASE-IQ4-PANELEP11PIECE1ENPHASE IQ COMBINER 4 (X-IQ-AM1-240-4)WIRINGENPHASEQ-12-20-200EN1-20 20PIECES 1ENPHASE ENGAGE (TM) TRUNK CABLEWIRINGENPHASEQ-TERM-10EN211BUNDLE 10ENPHASE ENGAGE (TM) BRANCH TERMINATORWIRINGENPHASEQ-SEAL-10EN221BUNDLE10ENPHASE ENGAGE (TM) WATERTIGHT SEALING CAPWIRINGGEN-10-AWG-THWN-2-CU-RDWR190FEET 110 AWG THWN-2, COPPER, RED (LINE 1)WIRINGGEN-10-AWG-THWN-2-CU-BLKWR190 FEET110 AWG THWN-2, COPPER, BLACK (LINE 2)WIRINGGEN-8-AWG-THWN-2-CU-RDWR2-3 20FEET 18 AWG THWN-2, COPPER, RED (LINE 1)WIRINGGEN-8-AWG-THWN-2-CU-BLKWR2-3 20FEET 18 AWG THWN-2, COPPER, BLACK (LINE 2)WIRINGGEN-8-AWG-THWN-2-CU-WHWR2-3 20 FEET 18 AWG THWN-2, COPPER, WHITE (NEUTRAL)WIRINGGEN-6-AWG-THWN-2-CU-RDWR410FEET 16 AWG THWN-2, COPPER, RED (LINE 1)WIRINGGEN-6-AWG-THWN-2-CU-BLKWR410 FEET16 AWG THWN-2, COPPER, BLACK (LINE 2)WIRINGGEN-6-AWG-THWN-2-CU-WHWR410FEET 16 AWG THWN-2, COPPER, WHITE (NEUTRAL)WIRINGGEN-6-AWG-THWN-2-CU-GRWR1-475FEET 16 AWG THWN-2, COPPER, GREEN (GROUND)WIREWAYENPHASEET-SPLK-05EN51BUNDLE 5ENPHASE ENGAGE (TM) ENGAGE COUPLERWIREWAYGEN-EMT-0.75'' DIAWW1-475FEET 1EMT CONDUIT, 0.75'' DIAOCPDGENERIC MANUFACTURERGEN-CB-20A-240VACCB1-22 PIECES 1CIRCUIT BREAKER, 20A, 240VACOCPDGENERIC MANUFACTURERGEN-CB-15A-240VACCB31 PIECE 1CIRCUIT BREAKER, 15A, 240VACOCPDGENERIC MANUFACTURERGEN-FU-35A-240VACF1-22 PIECES 1FUSE, 35A, 240VACTRANSITION BOXGENERIC MANUFACTURERGEN-AWB-TB-4-4XJB11PIECE1TRANSITION/PASS-THROUGH BOX, WITH 4 TERMINAL BLOCKSBFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843E-602.00DESIGN TABLES(SHEET 7)
TO PV ARRAY(N) AC COMBINER BOXNOT TO EXCEED
6'-7" FROM GRADE
GRADE(N) UTILITY AC DISCONNECT(E) UTILITY METERTO (E) MEP(INSIDE)(E) UTILITY(N) PV METERBFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843E-603.00PLACARDS(SHEET 8)N
EW
S
EQUIPMENT ELEVATION01SCALE: NOT TO SCALE!CAUTION!POWER TO THIS BUILDING IS ALSO SUPPLIEDFROM ROOF MOUNTED SOLAR ARRAYS WITHSAFETY DISCONNECTS AS SHOWN:PV ARRAYMAIN DISTRIBUTIONUTILITY DISCONNECTFRONTBACKLABELING NOTES1.1 LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRICAL CODE,INTERNATIONAL FIRE CODE 605.11, OSHA STANDARD 1910.145, ANSI Z5351.2 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVINGJURISDICTION.1.3 LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENTINVOLVED.1.4 LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8” AND PERMANENTLY AFFIXED.1.5 ALERTING WORDS TO BE COLOR CODED. “DANGER” WILL HAVE REDBACKGROUND; “WARNING” WILL HAVE ORANGE BACKGROUND; “CAUTION” WILL HAVEYELLOW BACKGROUND. [ANSI Z535]ELECTRICAL SHOCK HAZARDTERMINALS ON THE LINE ANDLOAD SIDES MAY BE ENERGIZEDIN THE OPEN POSITIONWARNINGLABEL 1AT EACH DISCONNECTING MEANS FORPHOTOVOLTAIC EQUIPMENT (2" X 4").[NEC 690.13].POWER SOURCEOUTPUT CONNECTIONDO NOT RELOCATE THISOVERCURRENT DEVICEWARNINGLABEL 2AT POINT OF INTERCONNECTIONOVERCURRENT DEVICE (2" X 4").[NEC 705.12(B)(2)(3)(B)].PHOTOVOLTAIC SYSTEMAC DISCONNECTRATED AC OUTPUT CURRENTNOMINAL OPERATING AC VOLTAGELABEL 3AT POINT OF INTERCONNECTION, MARKEDAT DISCONNECTING MEANS (4" X 2").[NEC 690.54]LABEL 4AT EACH AC DISCONNECTING MEANS(4" X 1").[NEC 690.13(B)].DIRECTORYPERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICEDISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECTINGMEANS IF NOT IN THE SAME LOCATION (5 3/4" X 1 1/8").[NEC 690.56(B)]WHERE THE PV SYSTEMS ARE REMOTELY LOCATED FROM EACH OTHER, ADIRECTORY IN ACCORDANCE WITH 705.10 SHALL BE PROVIDED AT EACH PVSYSTEM DISCONNECTING MEANS.PV SYSTEM EQUIPMENT AND DISCONNECTING MEANS SHALL NOT BE INSTALLED INBATHROOMS[NEC 690.4(D),(E)]WARNING: PHOTOVOLTAICPOWER SOURCELABEL 9AT EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRINGMETHODS; SPACED AT MAXIMUM 10 FT SECTION OR WHERESEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS,OR FLOORS (5 3/4" X 1 1/8").[NEC 690.31(G)]LETTERS AT LEAST 3/8 INCH; WHITE ON RED BACKGROUND;REFLECTIVE[IFC 605.11.1.1]SOLAR PV SYSTEMEQUIPPED WITHRAPID SHUTDOWNTURN RAPID SHUTDOWN SWITCH TOTHE "OFF" POSITION TO SHUT DOWNPV SYSTEM AND REDUCE SHOCKHAZARD IN ARRAYSOLAR ELECTRICPV PANELSLABEL 6AT RAPID SHUTDOWN SYSTEM(3 3/4" X 5 1/4"). [NEC 690.56(C)(1)(A)].WARNINGLABEL 7AT POINT OF INTERCONNECTION(2 3/4" X 1 5/8").[NEC 705.12(B)(3)]WARNINGSOLAR ELECTRICCIRCUIT BREAKERIS BACKFEEDPHOTOVOLTAIC SOLARAC DISCONNECTLABEL 8AT POINT OF INTERCONNECTION(2" X 1").[NEC 705.12(B)(3)]CAUTIONSOLAR ELECTRIC SYSTEM CONNECTEDLABEL 10AT UTILITY METER (5 3/4" X 1 1/8")[NEC 690.56(B)]RAPID SHUTDOWNSWITCH FORSOLAR PV SYSTEMLABEL 5AT RAPID SHUTDOWN DISCONNECT SWITCH (5 1/4" X 2").[NEC 690.56(C)(3)].AVINTERACTIVE PHOTOVOLTAIC SYSTEM CONNECTEDPHOTOVOLTAIC SYSTEM DISCONNECT LOCATEDWEST SIDE OF THE HOUSE24.2240DUAL POWER SUPPLYSOURCES: UTILITY GRID AND PV SOLARELECTRIC SYSTEM
2012141315182211S-501D513S-501D4542524238272SHEET KEYNOTES1. ROOF MATERIAL: ASPHALT SHINGLE2. ROOF STRUCTURE: TRUSS3. ATTACHMENT TYPE: IRONRIDGE FLASHFOOT24. MODULE MANUFACTURER: HANWHA Q-CELLS5. MODULE MODEL: Q.PEAK DUO ML-G10+ 4006. MODULE LENGTH: 74''7. MODULE WIDTH: 41.1''8. MODULE WEIGHT: 48.5 LBS.9. SEE SHEET A-104 FOR DIMENSION(S)10. FIRE OFFSET: 18" FROM RIDGE, TWO 36 INCH WIDE ACCESSPATHWAYS FROM LANDING TO RIDGE.11. TRUSS SPACING: 22 IN. O.C.12. TRUSS SIZE: 2X4 IN., 2X6 IN. NOMINAL.13. LAG BOLT DIAMETER: 5/16 IN.14. LAG BOLT EMBEDMENT: 2-1/4 IN.15. TOTAL # OF ATTACHMENTS: 4516. TOTAL AREA: 422.42 SQ. FT.17. TOTAL WEIGHT: 1110.76 LBS.18. WEIGHT PER ATTACHMENT: 24.68 LBS.19. DISTRIBUTED LOAD: 2.63 PSF20. MAX. HORIZONTAL STANDOFF: 44 IN.21. MAX. VERTICAL STANDOFF: IN ACCORDANCE WITH MODULEMANUFACTURER'S INSTRUCTIONS.22. STANDOFF STAGGERING: YES23. RAIL MANUFACTURER (OR EQUIV.): IRONRIDGE24. RAIL MODEL (OR EQUIVALENT): XR-10025. RAIL WEIGHT: 0.68 PLF26. MAX. TRUSS SPAN: 18 FT., 22 FT.27. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX.1. FIELD VERIFY ALL MEASUREMENTS2. ITEMS BELOW MAY NOT BE ON THIS PAGEGENERAL NOTESROOF SLOPE 910106217BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843RACKING DETAIL (TRANSVERSE)D1SCALE: NOT TO SCALERACKING DETAIL (LONGITUDINAL)D2SCALE: NOT TO SCALERACKING DETAIL (TOP)D3SCALE: NOT TO SCALEDETAIL (LONGITUDINAL)D5SCALE: NOT TO SCALEDETAIL (TRANSVERSE)D4SCALE: NOT TO SCALES-501.00ASSEMBLY DETAILS(SHEET 9)
BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843R-001.00RESOURCE DOCUMENT(SHEET 10)
BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843R-002.00RESOURCE DOCUMENT(SHEET 11)
BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843R-003.00RESOURCE DOCUMENT(SHEET 12)
BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843R-004.00RESOURCE DOCUMENT(SHEET 13)
BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843R-005.00RESOURCE DOCUMENT(SHEET 14)
BFADE23DESIGN BY:ACDEGHBCFGH1456DATE:CHECKED BY:REVISIONS P.V.M.M.05.15.2023PAPER SIZE: 11" x 17" (ANSI B)V.2.2
ENGINEER OF RECORDUNAUTHORIZED USE OF THISDRAWING SET WITHOUT WRITTENPERMISSION FROM CONTRACTOR IS INVIOLATION OF U.S. COPYRIGHT LAWSAND WILL BE SUBJECT TO CIVILDAMAGES AND PROSECUTIONS.NEW PV SYSTEM:8.000 kWp DC / 5.800 kWp АСVIJAYANRESIDENCE18761 HAMMOND DR LAKEVILLE, MN 55044APN: 221201404130CONTRACTORPHONE:LIC. NO.:HIC. NO.:ELE. NO.:ADDRESS:GOLDEN ELECTRIC LLC1313 OSBORNE RD NESPRING LAKE PARK, MN 55432763-412-5714EA796843R-006.00RESOURCE DOCUMENT(SHEET 15)