Loading...
HomeMy WebLinkAboutSurvey - 16379-16403 Jaffna PlaceZoning = RM-1 FY - 20' House, 25' Garage SY - 7' Interior, 20' Corner RY - 30' SY Buffer - 50' RY Buffer - 50' Planning DepartmentApprovedDate:__________________04/19/2023 kjenson The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Draintile connection required. ENGINEERING REVIEWED Date:__________________04/19/2023 asobottka