Loading...
HomeMy WebLinkAbout18763 Javelin Court - Revised SurveyEROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Draintile connection required. The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________07/10/2023 hdunne