HomeMy WebLinkAbout18763 Javelin Court - Revised SurveyEROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Draintile connection required.
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________07/10/2023 hdunne